EgyptAir flights from Sharm el-Sheikh (SSH) to Cairo (CAI).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Sat 04:40 Sharm el-Sheikh (SSH) 2 05:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:05 Operates only on 2024-01-06
Tue,Sat 04:40 Sharm el-Sheikh (SSH) 2 05:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-13 through 2024-01-16
Mon,Wed-Sun 04:40 Sharm el-Sheikh (SSH) 2 05:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:05 Effective 2024-01-14 through 2024-01-22
Tue,Wed 04:40 Sharm el-Sheikh (SSH) 2 05:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-23 through 2024-01-24
Daily 04:40 Sharm el-Sheikh (SSH) 2 05:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:05 Effective 2024-01-25 through 2024-02-29
Daily 04:40 Sharm el-Sheikh (SSH) 2 05:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-03-01 through 2024-03-30
Mon,Wed,Thu 05:10 Sharm el-Sheikh (SSH) 2 06:15 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:05 Valid until 2024-01-04
Tue,Fri 05:10 Sharm el-Sheikh (SSH) 2 06:15 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-02 through 2024-01-05
Mon-Thu 05:40 Sharm el-Sheikh (SSH) 2 06:45 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:05 Effective from 2024-10-28
Sun 05:50 Sharm el-Sheikh (SSH) 2 06:50 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:00 Operates only on 2024-01-07
Mon-Fri 05:50 Sharm el-Sheikh (SSH) 2 06:50 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-01-08 through 2024-01-12
Daily 06:00 Sharm el-Sheikh (SSH) 2 07:00 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-04-01 through 2024-04-25
Daily 07:00 Sharm el-Sheikh (SSH) 2 08:00 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-04-26 through 2024-10-26
Sun 07:00 Sharm el-Sheikh (SSH) 2 08:10 Cairo (CAI) 3
EgyptAir MS 21 Non-stop Airbus A220-300 (223) 1:10 Operates only on 2024-10-27
Fri-Sun 07:30 Sharm el-Sheikh (SSH) 2 08:30 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-01-06 through 2024-01-12
Fri 07:40 Sharm el-Sheikh (SSH) 2 08:40 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-01-19
Mon 07:50 Sharm el-Sheikh (SSH) 2 08:50 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-01-08
Tue,Sat 07:55 Sharm el-Sheikh (SSH) 2 09:00 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Valid until 2024-01-02
Mon 07:55 Sharm el-Sheikh (SSH) 2 09:00 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Operates only on 2024-01-22
Mon-Wed,Fri,Sun 08:00 Sharm el-Sheikh (SSH) 2 09:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Valid until 2024-01-01
Tue-Fri 08:00 Sharm el-Sheikh (SSH) 2 09:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-03 through 2024-01-11
Mon-Thu,Sat,Sun 08:00 Sharm el-Sheikh (SSH) 2 09:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-13 through 2024-01-21
Tue 08:00 Sharm el-Sheikh (SSH) 2 09:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Airbus A320neo (32N) 1:05 Operates only on 2024-01-23
Daily 08:00 Sharm el-Sheikh (SSH) 2 09:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-24 through 2024-03-30
Mon-Thu,Sun 09:00 Sharm el-Sheikh (SSH) 2 10:05 Cairo (CAI) 3
EgyptAir MS 23 Non-stop Airbus A220-300 (223) 1:05 Effective from 2024-10-27
Mon-Thu,Sat 13:40 Sharm el-Sheikh (SSH) 2 14:40 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-01-13 through 2024-01-18
Mon-Thu,Sat 13:55 Sharm el-Sheikh (SSH) 2 14:55 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-05-06 through 2024-10-26
Mon-Wed,Sat,Sun 15:30 Sharm el-Sheikh (SSH) 2 16:30 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-01-20 through 2024-01-24
Fri 15:40 Sharm el-Sheikh (SSH) 2 16:40 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A320 (320) 1:00 Operates only on 2024-01-12
Fri,Sun 15:40 Sharm el-Sheikh (SSH) 2 16:40 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-05-05 through 2024-10-25
Tue-Thu,Sat 16:10 Sharm el-Sheikh (SSH) 2 17:10 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-01-06 through 2024-01-11
Sun 16:10 Sharm el-Sheikh (SSH) 2 17:10 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-01-07
Fri 16:20 Sharm el-Sheikh (SSH) 2 17:20 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:00 Operates only on 2024-01-26
Mon-Wed,Sat,Sun 16:25 Sharm el-Sheikh (SSH) 2 17:35 Cairo (CAI) 3
EgyptAir MS 25 Non-stop Airbus A220-300 (223) 1:10 Valid until 2024-01-03
Mon,Fri,Sun 21:30 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Airbus A320neo (32N) 1:10 Effective 2024-03-31 through 2024-04-22
Tue-Thu,Sat 21:30 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-04-02 through 2024-04-25
Mon-Thu,Sat 21:35 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:05 Valid until 2024-01-04
Daily 21:35 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-05 through 2024-01-13
Daily 21:35 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:05 Effective 2024-01-15 through 2024-03-30
Sun 21:40 Sharm el-Sheikh (SSH) 2 22:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-01-14
Mon,Wed,Fri-Sun 22:30 Sharm el-Sheikh (SSH) 2 23:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Airbus A320neo (32N) 1:10 Effective 2024-04-26 through 2024-10-26
Tue,Thu 22:30 Sharm el-Sheikh (SSH) 2 23:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-04-30 through 2024-10-24
Mon-Thu,Sun 22:35 Sharm el-Sheikh (SSH) 2 23:40 Cairo (CAI) 3
EgyptAir MS 29 Non-stop Airbus A220-300 (223) 1:05 Effective from 2024-10-27
Mon,Thu 12:20 Sharm el-Sheikh (SSH) 2 13:20 Cairo (CAI) 3
EgyptAir MS 191 Non-stop Airbus A220-300 (223) 1:00 Valid until 2024-02-19
Mon,Thu 14:40 Sharm el-Sheikh (SSH) 2 15:40 Cairo (CAI) 3
EgyptAir MS 191 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-04-01 through 2024-04-25
Mon,Thu 15:40 Sharm el-Sheikh (SSH) 2 16:40 Cairo (CAI) 3
EgyptAir MS 191 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-04-29 through 2024-10-24
Fri,Sun 10:40 Sharm el-Sheikh (SSH) 2 11:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-03-31 through 2024-04-21
This is a Non-scheduled Passenger flight.
Fri 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A220-300 (223) 1:00 Operates only on 2024-01-05
This is a Non-scheduled Passenger flight.
Mon-Wed,Sat 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-04-01 through 2024-04-24
This is a Non-scheduled Passenger flight.
Thu 11:40 Sharm el-Sheikh (SSH) 2 12:40 Cairo (CAI) 3
EgyptAir MS 223 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-04-04 through 2024-04-25
This is a Non-scheduled Passenger flight.
1 2   next


EgyptAir flights from Sharm el-Sheikh (SSH) to Cairo (CAI).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Operates only on 2024-01-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Airbus A220-300 (223)

Effective 2024-01-13 through 2024-01-16
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective 2024-01-14 through 2024-01-22
Mon
Tue
-
Wed
Thu
Fri
Sat
Sun
Duration: 1:05, non-stop
Airbus A220-300 (223)

Effective 2024-01-23 through 2024-01-24
Mon
-
Tue
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective 2024-01-25 through 2024-02-29
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:05, non-stop
Airbus A220-300 (223)

Effective 2024-03-01 through 2024-03-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:05, non-stop
Boeing 737-800 (738)

Valid until 2024-01-04
Mon
Tue
-
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A220-300 (223)

Effective 2024-01-02 through 2024-01-05
Mon
-
Tue
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective from 2024-10-28
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A220-300 (223)

Operates only on 2024-01-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-01-08 through 2024-01-12
Mon
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-04-01 through 2024-04-25
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-04-26 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-27
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:10, non-stop
Airbus A220-300 (223)

Effective 2024-01-06 through 2024-01-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
Sun
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-19
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-08
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Valid until 2024-01-02
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-22
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Valid until 2024-01-01
Mon
Tue
Wed
Thu
-
Fri
Sat
-
Sun
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective 2024-01-03 through 2024-01-11
Mon
-
Tue
Wed
Thu
Fri
Sat
-
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective 2024-01-13 through 2024-01-21
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
Duration: 1:05, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-23
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 1:05, non-stop
Airbus A320neo (32N)

Effective 2024-01-24 through 2024-03-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective from 2024-10-27
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
Duration: 1:05, non-stop
Airbus A220-300 (223)

Effective 2024-01-13 through 2024-01-18
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-05-06 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-01-20 through 2024-01-24
Mon
Tue
Wed
Thu
-
Fri
-
Sat
Sun
Duration: 1:00, non-stop
Airbus A220-300 (223)

Operates only on 2024-01-12
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:00, non-stop
Airbus A320 (320)

Effective 2024-05-05 through 2024-10-25
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-01-06 through 2024-01-11
Mon
-
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Operates only on 2024-01-07
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-26
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Valid until 2024-01-03
Mon
Tue
Wed
Thu
-
Fri
-
Sat
Sun
Duration: 1:10, non-stop
Airbus A220-300 (223)

Effective 2024-03-31 through 2024-04-22
Mon
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:10, non-stop
Airbus A320neo (32N)

Effective 2024-04-02 through 2024-04-25
Mon
-
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Valid until 2024-01-04
Mon
Tue
Wed
Thu
Fri
-
Sat
Sun
-
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective 2024-01-05 through 2024-01-13
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:05, non-stop
Boeing 737-800 (738)

Effective 2024-01-15 through 2024-03-30
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 1:05, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-14
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
-
Sun
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-04-26 through 2024-10-26
Mon
Tue
-
Wed
Thu
-
Fri
Sat
Sun
Duration: 1:10, non-stop
Airbus A320neo (32N)

Effective 2024-04-30 through 2024-10-24
Mon
-
Tue
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:10, non-stop
Boeing 737-800 (738)

Effective from 2024-10-27
Mon
Tue
Wed
Thu
Fri
-
Sat
-
Sun
Duration: 1:05, non-stop
Airbus A220-300 (223)

Valid until 2024-02-19
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-04-01 through 2024-04-25
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-04-29 through 2024-10-24
Mon
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-03-31 through 2024-04-21
This is a Non-scheduled Passenger flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-01-05
This is a Non-scheduled Passenger flight.
Mon
-
Tue
-
Wed
-
Thu
-
Fri
Sat
-
Sun
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-04-01 through 2024-04-24
This is a Non-scheduled Passenger flight.
Mon
Tue
Wed
Thu
-
Fri
-
Sat
Sun
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-04-04 through 2024-04-25
This is a Non-scheduled Passenger flight.
Mon
-
Tue
-
Wed
-
Thu
Fri
-
Sat
-
Sun
-
Duration: 1:00, non-stop
Airbus A320neo (32N)
Page 1 / 2        next
  • A domestic route departing from the Sharm el-Sheikh airport (SSH) and arriving at Cairo airport (CAI).
  • The flight distance is 234 miles, or 377 km.
  • The timezone of both the departure and the arrival airports is UTC+2 . Current time at both airports is (loading...).
  • For direct flights, the flight time varies between 1:00 and 1:10.