FLIGHT SCHEDULE |
---|
Direct Flights: |
Sun
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (321) 4:25 Valid until 2024-01-07 The flight arrives 1 day after departure. |
Mon-Thu,Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Valid until 2024-01-01 The flight arrives 1 day after departure. |
Tue,Fri
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320 (320) 4:25 Valid until 2024-01-02 The flight arrives 1 day after departure. |
Mon-Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-01-03 through 2024-01-11 The flight arrives 1 day after departure. |
Fri
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (321) 4:25 Operates only on 2024-01-12 The flight arrives 1 day after departure. |
Mon,Wed,Thu,Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-01-13 through 2024-01-22 The flight arrives 1 day after departure. |
Tue,Fri,Sun
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320 (320) 4:25 Effective 2024-01-14 through 2024-01-23 The flight arrives 1 day after departure. |
Wed
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (321) 4:25 Effective 2024-01-24 through 2024-01-31 The flight arrives 1 day after departure. |
Mon,Thu-Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-01-25 through 2024-02-01 The flight arrives 1 day after departure. |
Tue,Fri,Sun
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320 (320) 4:25 Effective 2024-01-28 through 2024-02-11 The flight arrives 1 day after departure. |
Mon,Wed,Thu,Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-02-03 through 2024-02-22 The flight arrives 1 day after departure. |
Tue
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (321) 4:25 Effective 2024-02-13 through 2024-02-20 The flight arrives 1 day after departure. |
Fri,Sun
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320 (320) 4:25 Effective 2024-02-16 through 2024-02-18 The flight arrives 1 day after departure. |
Mon,Wed-Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-02-23 through 2024-02-29 The flight arrives 1 day after departure. |
Tue,Fri,Sun
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320 (320) 4:25 Effective 2024-02-25 through 2024-03-10 The flight arrives 1 day after departure. |
Mon,Wed,Thu,Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-03-02 through 2024-03-18 The flight arrives 1 day after departure. |
Tue
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (321) 4:25 Operates only on 2024-03-12 The flight arrives 1 day after departure. |
Tue,Wed,Fri,Sun
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320 (320) 4:25 Effective 2024-03-15 through 2024-03-29 The flight arrives 1 day after departure. |
Mon,Thu,Sat
21:50
Sharjah (SHJ)
03:45
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A321 (32B) 4:25 Effective 2024-03-21 through 2024-03-30 The flight arrives 1 day after departure. |
Daily
22:25
Sharjah (SHJ)
04:25
Colombo (CMB) Air Arabia PJSC G9 502 Non-stop Airbus A320neo (32N) 4:30 Effective 2024-03-31 through 2024-10-26 The flight arrives 1 day after departure. |
Fri
07:50
Sharjah (SHJ)
13:45
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A320 (320) 4:25 Valid until 2024-01-12 This is a Non-scheduled Passenger flight. |
Sat
07:50
Sharjah (SHJ)
13:45
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (32B) 4:25 Operates only on 2024-01-13 |
Sat
07:50
Sharjah (SHJ)
13:45
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A320 (320) 4:25 Effective 2024-01-20 through 2024-03-30 |
Mon,Tue,Thu
08:00
Sharjah (SHJ)
13:55
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (321) 4:25 Valid until 2024-01-04 |
Sun
08:00
Sharjah (SHJ)
13:55
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A320 (320) 4:25 Valid until 2024-01-14 |
Mon
08:00
Sharjah (SHJ)
13:55
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (32B) 4:25 Operates only on 2024-01-08 |
Tue,Thu
08:00
Sharjah (SHJ)
13:55
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (321) 4:25 Effective 2024-01-09 through 2024-03-28 |
Mon,Sun
08:00
Sharjah (SHJ)
13:55
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A320 (320) 4:25 Effective 2024-01-15 through 2024-03-25 |
Mon,Tue,Fri-Sun
08:20
Sharjah (SHJ)
14:20
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (32B) 4:30 Effective 2024-03-31 through 2024-04-30 |
Thu
08:20
Sharjah (SHJ)
14:20
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A320 (320) 4:30 Effective 2024-04-04 through 2024-04-25 |
Mon,Tue,Thu-Sun
08:20
Sharjah (SHJ)
14:20
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (32B) 4:30 Effective 2024-05-02 through 2024-06-09 |
Mon,Tue,Thu-Sun
08:20
Sharjah (SHJ)
14:20
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A320 (320) 4:30 Effective 2024-06-10 through 2024-08-31 |
Mon,Tue,Thu-Sun
08:20
Sharjah (SHJ)
14:20
Colombo (CMB) Air Arabia PJSC G9 508 Non-stop Airbus A321 (32B) 4:30 Effective 2024-09-01 through 2024-10-26 |
Tue
12:50
Sharjah (SHJ)
18:45
Colombo (CMB) Air Arabia PJSC G9 587 Non-stop Airbus A320 (320) 4:25 Valid until 2024-01-16 This is a Non-scheduled Passenger flight. |
Mon
13:20
Sharjah (SHJ)
19:15
Colombo (CMB) Air Arabia PJSC G9 587 Non-stop Airbus A320 (320) 4:25 Valid until 2024-01-08 This is a Non-scheduled Passenger flight. |
Mon,Thu
13:20
Sharjah (SHJ)
19:15
Colombo (CMB) Air Arabia PJSC G9 587 Non-stop Airbus A320 (320) 4:25 Effective 2024-01-11 through 2024-01-18 This is a Non-scheduled Passenger flight. |