Norwegian Air International flights from Arlanda, Stockholm (ARN) to Faro (FAO).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Tue 06:00 Arlanda, Stockholm (ARN) 5 09:30 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737-800 (73H) 4:30 Effective 2024-04-02 through 2024-04-30
Tue 07:00 Arlanda, Stockholm (ARN) 5 10:30 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective from 2024-05-07
Sat 07:30 Arlanda, Stockholm (ARN) 5 11:00 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737-800 (73H) 4:30 Valid until 2024-01-06
Sat 07:30 Arlanda, Stockholm (ARN) 5 11:00 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737-800 (73H) 4:30 Effective 2024-02-17 through 2024-03-30
Sat 14:20 Arlanda, Stockholm (ARN) 5 17:50 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737-800 (73H) 4:30 Effective 2024-04-06 through 2024-06-01
Sat 14:20 Arlanda, Stockholm (ARN) 5 17:50 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737 MAX 8 (7M8) 4:30 Effective 2024-06-08 through 2024-08-17
Sat 14:20 Arlanda, Stockholm (ARN) 5 17:50 Faro (FAO)
Norwegian Air International D8 4275 Non-stop Boeing 737-800 (73H) 4:30 Effective from 2024-08-24
Wed 11:30 Arlanda, Stockholm (ARN) 5 15:00 Faro (FAO)
Norwegian Air International D8 8576 Non-stop Boeing 737-800 (73H) 4:30 Operates only on 2024-03-27


Norwegian Air International flights from Arlanda, Stockholm (ARN) to Faro (FAO).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

Effective 2024-04-02 through 2024-04-30
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Effective from 2024-05-07
Mon
-
Tue
Wed
-
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:30, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-01-06
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Effective 2024-02-17 through 2024-03-30
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Effective 2024-04-06 through 2024-06-01
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Effective 2024-06-08 through 2024-08-17
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective from 2024-08-24
Mon
-
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-27
Mon
-
Tue
-
Wed
Thu
-
Fri
-
Sat
-
Sun
-
Duration: 4:30, non-stop
Boeing 737-800 (73H)
  • An international route departing from Arlanda, Stockholm airport, Sweden (ARN) and arriving at Faro airport, Portugal (FAO).
  • The flight distance is 1938 miles, or 3119 km.
  • The timezone of the departure airport is UTC+1 , and the timezone of the arrival airport is UTC+0 . Current time at the point of departure is (loading...), and (loading...) at the point of arrival. There is a (loading...) hour time difference between the airports.
  • For direct flights, the flight time is 4:30.