FLIGHT SCHEDULE |
---|
Direct Flights: |
Fri,Sun
07:30
Gaborone (GBE)
08:50
Hosea Kutako, Windhoek (WDH) Air Botswana BP 401 Non-stop Embraer ERJ 145 (ER4) 1:20 Effective 2024-10-04 through 2024-10-27 |
Fri,Sun
07:30
Gaborone (GBE)
08:50
Hosea Kutako, Windhoek (WDH) Air Botswana BP 401 Non-stop Embraer EMB 175 (E75) 1:20 Effective 2024-11-01 through 2025-03-30 |
Sun
07:30
Gaborone (GBE)
08:50
Hosea Kutako, Windhoek (WDH) Air Botswana BP 401 Non-stop Embraer EMB 175 (E75) 1:20 Effective from 2025-04-06 |
Wed
12:00
Gaborone (GBE)
13:20
Hosea Kutako, Windhoek (WDH) Air Botswana BP 401 Non-stop Embraer EMB 175 (E75) 1:20 Effective 2024-10-02 through 2024-10-30 |
Wed
12:00
Gaborone (GBE)
13:20
Hosea Kutako, Windhoek (WDH) Air Botswana BP 401 Non-stop Embraer EMB 170 / EMB 190 (EMJ) 1:20 Effective from 2024-11-06 |