Akasa Air flights from Bhubaneshwar (BBI) to Mumbai (BOM).

Select flight date:
FLIGHT SCHEDULE
Direct Flights:
Mon,Sat,Sun 23:00 Bhubaneshwar (BBI) 1 01:05 Mumbai (BOM) 1
Akasa Air QP 1388 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Valid until 2024-09-02
The flight arrives 1 day after departure.
Daily 23:00 Bhubaneshwar (BBI) 1 01:05 Mumbai (BOM) 1
Akasa Air QP 1388 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-09-03 through 2024-10-26
The flight arrives 1 day after departure.


Akasa Air flights from Bhubaneshwar (BBI) to Mumbai (BOM).
Select flight date:
FLIGHT SCHEDULE
Direct Flights:

23:00

01:05(+1)
Valid until 2024-09-02
Mon
Tue
-
Wed
-
Thu
-
Fri
-
Sat
Sun
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

23:00

01:05(+1)
Effective 2024-09-03 through 2024-10-26
Mon
Tue
Wed
Thu
Fri
Sat
Sun
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.
  • A domestic route departing from the Bhubaneshwar airport (BBI) and arriving at Mumbai airport (BOM).
  • The flight distance is 847 miles, or 1363 km.
  • The timezone of both the departure and the arrival airports is UTC+5.5 . Current time at both airports is (loading...).
  • For direct flights, the flight time is 2:05.