FLIGHT SCHEDULE |
---|
Direct Flights: |
Mon-Wed,Fri,Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 140 (ERD) 1:25 Valid until 2024-09-02 |
Tue-Thu
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 135 (ER3) 1:25 Valid until 2024-09-05 |
Mon-Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 135 (ER3) 1:25 Effective 2024-09-06 through 2024-09-18 |
Tue-Thu
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 140 (ERD) 1:25 Effective 2024-09-19 through 2024-09-25 |
Mon,Thu-Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 135 (ER3) 1:25 Effective 2024-09-20 through 2024-09-27 |
Mon-Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 140 (ERD) 1:25 Effective 2024-09-28 through 2024-12-24 |
Mon,Tue,Thu-Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 140 (ERD) 1:25 Effective 2024-12-27 through 2025-01-07 |
Mon-Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 140 (ERD) 1:25 Effective 2025-01-08 through 2025-04-18 |
Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 135 (ER3) 1:25 Operates only on 2025-04-19 |
Mon-Sat
07:00
East London (ELS)
08:25
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 914 Non-stop Embraer ERJ 140 (ERD) 1:25 Effective from 2025-04-21 |
Daily
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Valid until 2024-10-03 |
Daily
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Effective 2024-10-05 through 2024-10-31 |
Daily
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Effective 2024-11-02 through 2024-11-09 |
Mon-Wed,Sat,Sun
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Effective 2024-11-11 through 2024-11-20 |
Daily
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Effective 2024-11-21 through 2024-12-25 |
Thu
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 140 (ERD) 1:35 Effective 2024-12-26 through 2025-01-02 |
Mon-Wed,Fri-Sun
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Effective 2024-12-27 through 2025-01-08 |
Daily
12:35
East London (ELS)
14:10
Johannesburg O.R. Tambo (JNB) B Airlink 4Z 916 Non-stop Embraer ERJ 135 (ER3) 1:35 Effective from 2025-01-09 |