Todas as companhias a voar a partir de Amarillo (AMA) a Love Field, Dallas (DAL).

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Dom 18:25 Amarillo (AMA) 19:45 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2245 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-06-02
Ter,Qua 18:50 Amarillo (AMA) 20:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2245 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-04-09 through 2024-05-29
Seg,Qui,Sex 18:55 Amarillo (AMA) 20:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2245 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-04-11 through 2024-06-03
Seg,Qui,Sex 10:20 Amarillo (AMA) 11:30 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2416 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-08-05 through 2024-09-30
Sáb 10:50 Amarillo (AMA) 12:05 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2416 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-08-10 through 2024-09-28
Ter,Qua 11:00 Amarillo (AMA) 12:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2416 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-08-06 through 2024-10-02
Sáb 18:05 Amarillo (AMA) 19:25 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2764 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-06-08 through 2024-08-03
Ter,Qua 10:20 Amarillo (AMA) 11:30 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2994 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-06-04 through 2024-07-31
Seg,Qui,Sex 10:25 Amarillo (AMA) 11:35 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2994 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-06-06 through 2024-07-01
Seg,Qui,Sex 10:25 Amarillo (AMA) 11:35 Love Field, Dallas (DAL) 1
Southwest Airlines WN 2994 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-07-08 through 2024-08-02
Qui 13:05 Amarillo (AMA) 14:20 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3147 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2024-07-04
Sáb 06:05 Amarillo (AMA) 07:15 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3167 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-03-09 through 2024-04-06
Seg,Qui,Sex 06:20 Amarillo (AMA) 07:30 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3167 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-03-07 through 2024-04-08
Dom 06:25 Amarillo (AMA) 07:35 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3167 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-03-10 through 2024-04-07
Ter,Qua 06:45 Amarillo (AMA) 08:00 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3167 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-03-12 through 2024-04-03
Ter,Qua 06:45 Amarillo (AMA) 07:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3168 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-01-09 through 2024-03-06
Seg,Qui,Sex 10:20 Amarillo (AMA) 11:35 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3343 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-03-07 through 2024-04-08
Ter,Qua 10:40 Amarillo (AMA) 11:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3343 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-03-12 through 2024-04-03
Dom 10:55 Amarillo (AMA) 12:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3343 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-03-10 through 2024-04-07
Ter-Sex 18:40 Amarillo (AMA) 20:00 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3394 Non-stop Boeing 737-700 (73W) 1:20 Valid until 2024-01-02
Dom 05:50 Amarillo (AMA) 07:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3483 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-01-14 through 2024-03-03
Dom 17:25 Amarillo (AMA) 18:35 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3878 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-09-01
Seg,Qui,Sex 18:35 Amarillo (AMA) 19:45 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3878 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-08-05 through 2024-09-30
Dom 19:05 Amarillo (AMA) 20:15 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3878 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-08-11 through 2024-08-25
Dom 19:05 Amarillo (AMA) 20:15 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3878 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-09-08 through 2024-09-29
Sex 18:15 Amarillo (AMA) 19:30 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3912 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-07-05
Sex 07:45 Amarillo (AMA) 08:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 3944 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-07-05
Seg,Qui,Sex 18:45 Amarillo (AMA) 19:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4185 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-03-07 through 2024-04-08
Dom 18:45 Amarillo (AMA) 19:50 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4185 Non-stop Boeing 737-700 (73W) 1:05 Effective 2024-03-10 through 2024-04-07
Ter,Qua 18:55 Amarillo (AMA) 20:05 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4185 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-03-12 through 2024-04-03
Ter,Qua 15:15 Amarillo (AMA) 16:30 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4227 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-06-04 through 2024-07-31
Seg,Dom 15:00 Amarillo (AMA) 16:15 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4287 Non-stop Boeing 737-800 (73H) 1:15 Valid until 2024-01-01
Qua-Sex,Dom 15:00 Amarillo (AMA) 16:15 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4287 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-01-03 through 2024-01-07
Ter,Qua 18:40 Amarillo (AMA) 19:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4354 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-06-04 through 2024-07-31
Ter,Qua 06:20 Amarillo (AMA) 07:30 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4510 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-06-04 through 2024-07-31
Seg,Qui,Sex 06:45 Amarillo (AMA) 07:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4510 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-06-06 through 2024-07-01
Seg,Qui,Sex 06:45 Amarillo (AMA) 07:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4510 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-07-08 through 2024-08-02
Sáb 07:25 Amarillo (AMA) 08:35 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4510 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-06-08 through 2024-08-03
Qui 08:15 Amarillo (AMA) 09:25 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4510 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-07-04
Sáb 15:45 Amarillo (AMA) 16:55 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4618 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-06
Dom 12:45 Amarillo (AMA) 14:05 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4713 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-04-14 through 2024-05-19
Dom 12:45 Amarillo (AMA) 14:05 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4713 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-06-02
Dom 11:55 Amarillo (AMA) 13:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4735 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-08-11 through 2024-08-25
Dom 11:55 Amarillo (AMA) 13:10 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4735 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-09-08 through 2024-09-29
Sex 10:10 Amarillo (AMA) 11:20 Love Field, Dallas (DAL) 1
Southwest Airlines WN 4881 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-07-05
Dom 18:30 Amarillo (AMA) 19:45 Love Field, Dallas (DAL) 1
Southwest Airlines WN 5442 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-06-09 through 2024-08-04
Seg,Qui,Sex 14:25 Amarillo (AMA) 15:40 Love Field, Dallas (DAL) 1
Southwest Airlines WN 5892 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-03-07 through 2024-04-08
Ter,Qua 15:10 Amarillo (AMA) 16:25 Love Field, Dallas (DAL) 1
Southwest Airlines WN 5892 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-03-12 through 2024-04-03
prev   1 2


Todas as companhias a voar a partir de Amarillo (AMA) a Love Field, Dallas (DAL).
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Operates only on 2024-06-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-04-09 through 2024-05-29
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-04-11 through 2024-06-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2024-08-05 through 2024-09-30
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-08-10 through 2024-09-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-08-06 through 2024-10-02
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-06-08 through 2024-08-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-06-04 through 2024-07-31
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-06-06 through 2024-07-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-07-08 through 2024-08-02
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-07-04
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2024-03-09 through 2024-04-06
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-03-07 through 2024-04-08
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-03-10 through 2024-04-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-03-12 through 2024-04-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2024-01-09 through 2024-03-06
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-03-07 through 2024-04-08
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-03-12 through 2024-04-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-03-10 through 2024-04-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Valid until 2024-01-02
Seg
-
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-01-14 through 2024-03-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-08-05 through 2024-09-30
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-08-11 through 2024-08-25
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-09-08 through 2024-09-29
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-07-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-07-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-03-07 through 2024-04-08
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-03-10 through 2024-04-07
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Effective 2024-03-12 through 2024-04-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-06-04 through 2024-07-31
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Valid until 2024-01-01
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2024-01-03 through 2024-01-07
Seg
-
Ter
-
Qua
Qui
Sex
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Effective 2024-06-04 through 2024-07-31
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-06-04 through 2024-07-31
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-06-06 through 2024-07-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-07-08 through 2024-08-02
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-06-08 through 2024-08-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-07-04
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Operates only on 2024-01-06
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-04-14 through 2024-05-19
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-06-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-08-11 through 2024-08-25
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-09-08 through 2024-09-29
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Operates only on 2024-07-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Effective 2024-06-09 through 2024-08-04
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-03-07 through 2024-04-08
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Effective 2024-03-12 through 2024-04-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)
prev        Page 2 / 2
  • Uma rota doméstica com partida no aeroporto Amarillo (AMA) e chegada no aeroporto Love Field, Dallas (DAL).
  • O voo tem uma distância de 323 milhas, ou 520 km.
  • O fuso horário, tanto no aeroporto de partida como no aeroporto de chegada, é UTC-6 . A hora atual em ambos os aeroportos é (loading...).
  • Para voos diretos, o tempo de voo varia entre 1:05 e 1:30.