PLANEAR VOO |
---|
Voos Directos: |
Diariamente
08:55
Brasilia (BSB)
11:20
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Effective from 2024-10-27 |
Seg,Qua,Sáb
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Valid until 2024-09-02 |
Ter,Qui,Sex,Dom
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Valid until 2024-09-01 |
Ter,Qui,Sex
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-03 through 2024-09-06 |
Seg-Qua,Dom
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-04 through 2024-09-10 |
Ter-Qui
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-11 through 2024-09-19 |
Seg,Sex,Dom
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-13 through 2024-09-16 |
Qua-Sex
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-20 through 2024-09-26 |
Seg,Ter,Sex,Dom
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-09-22 through 2024-09-29 |
Diariamente
09:15
Brasilia (BSB)
11:40
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-30 through 2024-10-26 |
Sáb
09:30
Brasilia (BSB)
11:55
Maceio (MCZ) Gol G3 1996 Non-stop Boeing 737-800 (738) 2:25 Effective 2024-09-07 through 2024-09-28 |