Southwest Airlines voo WN 379: Multiple routes

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Sáb 05:00 Memphis (MEM) 06:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-11-23 through 2024-11-30
Sáb 05:00 Memphis (MEM) 06:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:35 Effective 2024-12-21 through 2025-01-04
Seg,Qui,Sex,Dom 05:15 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-13 through 2025-02-17
Qui,Sex,Dom 05:15 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-21 through 2025-03-02
Qui,Sex,Dom 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-03 through 2024-11-10
Seg,Qui,Sex,Dom 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-11 through 2024-11-25
Sex,Dom 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-12-08 through 2024-12-15
Qui 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2024-12-19
Sex 05:20 Memphis (MEM) 06:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Operates only on 2025-01-03
Seg-Qua 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-04 through 2024-11-06
Ter,Qua 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-12 through 2024-11-27
Seg-Sex 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-11-29 through 2024-12-12
Seg-Qua,Sex,Dom 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-16 through 2024-12-25
Seg-Sex,Dom 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-12-26 through 2025-01-02
Seg,Dom 05:40 Memphis (MEM) 07:15 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-01-05 through 2025-01-06
Qui,Sex,Dom 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-01-12 through 2025-01-17
Seg,Dom 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-01-20 through 2025-01-26
Qui,Sex,Dom 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-02-02 through 2025-02-07
Seg 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2025-02-10
Seg,Ter,Qui 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Effective 2025-02-18 through 2025-02-24
Seg 05:50 Memphis (MEM) 07:25 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2025-03-03
Dom 06:00 Memphis (MEM) 07:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2024-12-01
Sáb 06:05 Memphis (MEM) 07:40 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-11-09 through 2024-11-16
Sáb 06:05 Memphis (MEM) 07:40 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2024-12-07 through 2024-12-14
Seg-Sex 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-07 through 2025-01-15
Ter-Sex,Dom 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-19 through 2025-01-24
Seg-Sex 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-27 through 2025-02-05
Ter,Qua,Dom 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-02-09 through 2025-02-12
Ter,Qua 07:15 Memphis (MEM) 08:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-02-19 through 2025-03-05
Sáb 08:00 Las Vegas Harry Reid (LAS) 1 09:40 Sacramento (SMF) B
WN 379 Non-stop Boeing 737-800 (73H) 1:40 Effective 2025-02-15 through 2025-03-01
Sáb 09:00 Memphis (MEM) 10:40 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-01-11 through 2025-02-08
Qui 10:30 Memphis (MEM) 12:05 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2024-11-28
Dom 10:45 Houston Hobby (HOU) 13:55 Greenville/Spartanburg (GSP)
WN 379 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-09-08 through 2024-09-29
Sáb 10:50 Baltimore (BWI) 11:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-05 through 2024-11-02
Seg,Qui,Sex 11:15 Eugene (EUG) 13:20 Las Vegas Harry Reid (LAS) 1
WN 379 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Valid until 2024-09-30
Dom 12:15 Houston Hobby (HOU) 15:25 Greenville/Spartanburg (GSP)
WN 379 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-09-01
Qui 12:30 Baltimore (BWI) 13:35 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-10-31
Seg,Qui,Sex 12:50 Ronald Reagan Washington (DCA) 13:50 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-10-03 through 2024-10-28
Sex 12:50 Ronald Reagan Washington (DCA) 13:50 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2024-11-01
Sáb 13:10 Houston Hobby (HOU) 16:20 Greenville/Spartanburg (GSP)
WN 379 Non-stop Boeing 737-700 (73W) 2:10 Valid until 2024-09-28
Ter,Qua 13:30 Baltimore (BWI) 14:30 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-10-29 through 2024-10-30
Ter,Qua 14:00 Baltimore (BWI) 15:00 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-10-08 through 2024-10-23
Seg,Qui,Sex 14:30 Midway, Chicago (MDW) 16:10 Denver (DEN)
WN 379 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-10-03 through 2024-10-28
Sex 14:30 Midway, Chicago (MDW) 16:10 Denver (DEN)
WN 379 Non-stop Boeing 737-700 (73W) 2:40 Operates only on 2024-11-01
Ter,Qua 14:55 Greenville/Spartanburg (GSP) 15:50 Atlanta (ATL) N
WN 379 Non-stop Boeing 737-700 (73W) 0:55 Valid until 2024-10-02
Dom 16:35 Kansas City (MCI) 17:55 Midway, Chicago (MDW)
WN 379 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-10-06 through 2024-10-27
Seg,Qui,Sex 16:50 Denver (DEN) 17:35 Colorado Springs (COS)
WN 379 Non-stop Boeing 737-700 (73W) 0:45 Effective 2024-10-03 through 2024-10-28
Sex 16:50 Denver (DEN) 17:35 Colorado Springs (COS)
WN 379 Non-stop Boeing 737-700 (73W) 0:45 Operates only on 2024-11-01
Seg,Qui,Sex 18:10 Colorado Springs (COS) 20:55 Love Field, Dallas (DAL) 1
WN 379 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-03 through 2024-10-28
Sex 18:10 Colorado Springs (COS) 20:55 Love Field, Dallas (DAL) 1
WN 379 Non-stop Boeing 737-700 (73W) 1:45 Operates only on 2024-11-01
Voos Não-Directos:
Seg,Qui,Sex 12:50 Ronald Reagan Washington (DCA) 16:10 Denver (DEN)
WN 379 1-stop Boeing 737-700 (73W) 5:20 Effective 2024-10-03 through 2024-10-28
Sex 12:50 Ronald Reagan Washington (DCA) 16:10 Denver (DEN)
WN 379 1-stop Boeing 737-700 (73W) 5:20 Operates only on 2024-11-01
Seg,Qui,Sex 14:30 Midway, Chicago (MDW) 17:35 Colorado Springs (COS)
WN 379 1-stop Boeing 737-700 (73W) 4:05 Effective 2024-10-03 through 2024-10-28
Sex 14:30 Midway, Chicago (MDW) 17:35 Colorado Springs (COS)
WN 379 1-stop Boeing 737-700 (73W) 4:05 Operates only on 2024-11-01
Seg,Qui,Sex 16:50 Denver (DEN) 20:55 Love Field, Dallas (DAL) 1
WN 379 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-10-03 through 2024-10-28
Sex 16:50 Denver (DEN) 20:55 Love Field, Dallas (DAL) 1
WN 379 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-11-01
Seg,Qui,Sex 12:50 Ronald Reagan Washington (DCA) 17:35 Colorado Springs (COS)
WN 379 2-stop Boeing 737-700 (73W) 6:45 Effective 2024-10-03 through 2024-10-28
Sex 12:50 Ronald Reagan Washington (DCA) 17:35 Colorado Springs (COS)
WN 379 2-stop Boeing 737-700 (73W) 6:45 Operates only on 2024-11-01
Seg,Qui,Sex 14:30 Midway, Chicago (MDW) 20:55 Love Field, Dallas (DAL) 1
WN 379 2-stop Boeing 737-700 (73W) 6:25 Effective 2024-10-03 through 2024-10-28
Sex 14:30 Midway, Chicago (MDW) 20:55 Love Field, Dallas (DAL) 1
WN 379 2-stop Boeing 737-700 (73W) 6:25 Operates only on 2024-11-01
Seg,Qui,Sex 12:50 Ronald Reagan Washington (DCA) 20:55 Love Field, Dallas (DAL) 1
WN 379 3-stop Boeing 737-700 (73W) 9:05 Effective 2024-10-03 through 2024-10-28
Sex 12:50 Ronald Reagan Washington (DCA) 20:55 Love Field, Dallas (DAL) 1
WN 379 3-stop Boeing 737-700 (73W) 9:05 Operates only on 2024-11-01
This flight number is listed as serving the following routes:
Southwest Airlines voo WN 379: Multiple routes
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Southwest Airlines WN379
Effective 2024-11-23 through 2024-11-30
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-12-21 through 2025-01-04
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2025-02-13 through 2025-02-17
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2025-02-21 through 2025-03-02
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-11-03 through 2024-11-10
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-11-11 through 2024-11-25
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-12-08 through 2024-12-15
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Operates only on 2024-12-19
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Operates only on 2025-01-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-11-04 through 2024-11-06
Seg
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-11-12 through 2024-11-27
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-11-29 through 2024-12-12
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-12-16 through 2024-12-25
Seg
Ter
Qua
Qui
-
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-12-26 through 2025-01-02
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-05 through 2025-01-06
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-12 through 2025-01-17
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-20 through 2025-01-26
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-02 through 2025-02-07
Seg
-
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2025-02-10
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-18 through 2025-02-24
Seg
Ter
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2025-03-03
Seg
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-12-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-11-09 through 2024-11-16
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2024-12-07 through 2024-12-14
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Effective 2025-01-07 through 2025-01-15
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-19 through 2025-01-24
Seg
-
Ter
Qua
Qui
Sex
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-01-27 through 2025-02-05
Seg
Ter
Qua
Qui
Sex
Sáb
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-09 through 2025-02-12
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-19 through 2025-03-05
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2025-02-15 through 2025-03-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2025-01-11 through 2025-02-08
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-28
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-09-08 through 2024-09-29
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-05 through 2024-11-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Valid until 2024-09-30
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN379
Operates only on 2024-09-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-10-31
Seg
-
Ter
-
Qua
-
Qui
Sex
-
Sáb
-
Dom
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Valid until 2024-09-28
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-29 through 2024-10-30
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-10-08 through 2024-10-23
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Valid until 2024-10-02
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-06 through 2024-10-27
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 0:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 0:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Voos Não-Directos:

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 4:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 6:45, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 6:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 6:25, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Effective 2024-10-03 through 2024-10-28
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 9:05, 3-stop
Boeing 737-700 (73W)

Southwest Airlines WN379
Operates only on 2024-11-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 9:05, 3-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - Midway, Chicago (MDW)
  • Colorado Springs (COS) - Love Field, Dallas (DAL)
  • Denver (DEN) - Colorado Springs (COS)
  • Denver (DEN) - Love Field, Dallas (DAL)
  • Eugene (EUG) - Las Vegas Harry Reid (LAS)
  • Greenville/Spartanburg (GSP) - Atlanta (ATL)
  • Houston Hobby (HOU) - Greenville/Spartanburg (GSP)
  • Kansas City (MCI) - Midway, Chicago (MDW)
  • Las Vegas Harry Reid (LAS) - Sacramento (SMF)
  • Memphis (MEM) - Midway, Chicago (MDW)
  • Midway, Chicago (MDW) - Colorado Springs (COS)
  • Midway, Chicago (MDW) - Denver (DEN)
  • Midway, Chicago (MDW) - Love Field, Dallas (DAL)
  • Ronald Reagan Washington (DCA) - Colorado Springs (COS)
  • Ronald Reagan Washington (DCA) - Denver (DEN)
  • Ronald Reagan Washington (DCA) - Love Field, Dallas (DAL)
  • Ronald Reagan Washington (DCA) - Midway, Chicago (MDW)