PLANEAR VOO |
---|
Voos Directos: |
Seg,Qui,Sex
05:15
Buffalo (BUF)
07:55
Orlando (MCO) WN 2910 Non-stop Boeing 737-700 (73W) 2:40 Effective 2024-04-11 through 2024-06-03 |
Dom
06:05
Buffalo (BUF)
08:40
Orlando (MCO) WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-04-14 through 2024-05-19 |
Dom
06:05
Buffalo (BUF)
08:40
Orlando (MCO) WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2024-06-02 |
Seg,Qui,Sex
06:15
Orlando (MCO)
08:10
Midway, Chicago (MDW) WN 2910 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-03-07 through 2024-04-08 |
Sáb
06:25
Orlando (MCO)
08:20
Midway, Chicago (MDW) WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-03-09 through 2024-04-06 |
Ter,Qua
06:30
Orlando (MCO)
08:25
Midway, Chicago (MDW) WN 2910 Non-stop Boeing 737-700 (73W) 2:55 Effective 2024-03-12 through 2024-04-03 |
Seg,Qui,Sex
06:35
Indianapolis (IND)
07:25
HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 3:50 Effective 2024-08-05 through 2024-09-30 |
Dom
06:40
Orlando (MCO)
08:40
Midway, Chicago (MDW) WN 2910 Non-stop Boeing 737-700 (73W) 3:00 Effective 2024-03-10 through 2024-04-07 |
Sáb
07:00
Buffalo (BUF)
09:35
Orlando (MCO) WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-04-13 through 2024-06-01 |
Dom
07:05
Buffalo (BUF)
09:40
Orlando (MCO) WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2024-05-26 |
Ter,Qua
07:35
Buffalo (BUF)
10:10
Orlando (MCO) WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-04-09 through 2024-05-29 |
Dom
08:10
Sky Harbor, Phoenix (PHX) 4
08:20
HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 WN 2910 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-01-14 through 2024-03-03 |
Dom
08:45
Burbank (BUR)
11:45
Boise (BOI) WN 2910 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-06-09 through 2024-08-04 |
Sex
12:50
John Glenn, Columbus (CMH)
14:25
William P. Hobby, Houston (HOU) WN 2910 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2024-07-05 |
Ter,Qua
13:15
Burbank (BUR)
16:15
Boise (BOI) WN 2910 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-06-04 through 2024-07-31 |
Seg,Qui,Sex
15:40
Burbank (BUR)
18:40
Boise (BOI) WN 2910 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-06-06 through 2024-07-01 |
Seg,Qui,Sex
15:40
Burbank (BUR)
18:40
Boise (BOI) WN 2910 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-07-08 through 2024-08-02 |
Sáb
15:50
Burbank (BUR)
18:50
Boise (BOI) WN 2910 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-06-08 through 2024-08-03 |
Qui
15:55
Burbank (BUR)
18:55
Boise (BOI) WN 2910 Non-stop Boeing 737-700 (73W) 2:00 Operates only on 2024-07-04 |
Seg,Dom
19:10
William P. Hobby, Houston (HOU)
21:05
Saint Louis (STL) 2 WN 2910 Non-stop Boeing 737-700 (73W) 1:55 Valid until 2024-01-01 |
Qua-Sex,Dom
19:10
William P. Hobby, Houston (HOU)
21:05
Saint Louis (STL) 2 WN 2910 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-01-03 through 2024-01-07 |
Sáb
19:45
William P. Hobby, Houston (HOU)
21:40
Saint Louis (STL) 2 WN 2910 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-01-06 |
Seg,Dom
21:45
Saint Louis (STL) 2
23:10
Denver (DEN) WN 2910 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-01-01 |
Qua-Sex
21:45
Saint Louis (STL) 2
23:10
Denver (DEN) WN 2910 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-01-03 through 2024-01-05 |
Ter-Sex
22:50
Saint Louis (STL) 2
00:15
Denver (DEN) WN 2910 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-01-02 The flight arrives 1 day after departure. |
Voos Não-Directos: |
Seg,Dom
19:10
William P. Hobby, Houston (HOU)
23:10
Denver (DEN) WN 2910 1-stop Boeing 737-700 (73W) 5:00 Valid until 2024-01-01 |
Qua-Sex
19:10
William P. Hobby, Houston (HOU)
23:10
Denver (DEN) WN 2910 1-stop Boeing 737-700 (73W) 5:00 Effective 2024-01-03 through 2024-01-05 |