Southwest Airlines voo WN 2599: Multiple routes

Seleccionar data do voo:
PLANEAR VOO
Voos Directos:
Sex 05:35 Saint Louis (STL) 2 06:50 Denver (DEN)
WN 2599 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Operates only on 2024-07-05
Seg,Qui,Sex,Dom 06:00 Bozeman (BZN) 07:55 Denver (DEN)
WN 2599 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-03-07 through 2024-04-08
Sáb 06:15 Bozeman (BZN) 08:05 Denver (DEN)
WN 2599 Non-stop Boeing 737-800 (73H) 1:50 Effective 2024-03-09 through 2024-04-06
Ter,Qua 07:00 Bozeman (BZN) 08:40 Denver (DEN)
WN 2599 Non-stop Boeing 737-800 (73H) 1:40 Effective 2024-03-12 through 2024-04-03
Sáb 10:10 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 11:25 Fresno (FAT)
WN 2599 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-04-13 through 2024-06-01
Ter,Qua 10:55 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 12:15 Fresno (FAT)
WN 2599 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-04-09 through 2024-05-29
Sáb 12:00 Fresno (FAT) 15:10 Denver (DEN)
WN 2599 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-04-13 through 2024-06-01
Seg,Qui,Sex 12:05 Midway, Chicago (MDW) 14:15 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1
WN 2599 Non-stop Boeing 737-800 (738) 4:10 Effective 2024-01-08 through 2024-03-04
Seg,Qui,Sex 12:55 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 14:10 Fresno (FAT)
WN 2599 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-04-11 through 2024-06-03
Seg,Qui,Sex 14:45 Fresno (FAT) 17:55 Denver (DEN)
WN 2599 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-04-11 through 2024-06-03
Dom 15:25 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 16:45 Fresno (FAT)
WN 2599 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-05-26
Dom 19:10 San Diego (SAN) 1 00:10 Austin (AUS)
WN 2599 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-08-11 through 2024-08-25
The flight arrives 1 day after departure.
Dom 19:10 San Diego (SAN) 1 00:10 Austin (AUS)
WN 2599 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-09-08 through 2024-09-29
The flight arrives 1 day after departure.
Seg,Qui,Sex 20:25 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 21:55 Sacramento (SMF) B
WN 2599 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-06-06 through 2024-07-01
Dom 20:25 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 21:55 Sacramento (SMF) B
WN 2599 Non-stop Boeing 737-800 (738) 1:30 Effective 2024-06-09 through 2024-08-04
Seg,Qui,Sex 20:25 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 21:55 Sacramento (SMF) B
WN 2599 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-07-08 through 2024-08-02
Sáb 20:30 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 22:00 Sacramento (SMF) B
WN 2599 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2024-06-08 through 2024-08-03
Dom 21:20 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 22:35 Fresno (FAT)
WN 2599 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-04-14 through 2024-05-19
Dom 21:20 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 22:35 Fresno (FAT)
WN 2599 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-06-02
Voos Não-Directos:
Sáb 10:10 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 15:10 Denver (DEN)
WN 2599 1-stop Boeing 737-700 (73W) 4:00 Effective 2024-04-13 through 2024-06-01
Seg,Qui,Sex 12:55 HARRY REID INTL AIRPORT, Las Vegas (LAS) 1 17:55 Denver (DEN)
WN 2599 1-stop Boeing 737-700 (73W) 4:00 Effective 2024-04-11 through 2024-06-03
This flight number is listed as serving the following routes:
Southwest Airlines voo WN 2599: Multiple routes
Seleccionar data do voo:
PLANEAR VOO
Voos Directos:

Southwest Airlines WN2599
Operates only on 2024-07-05
Seg
-
Ter
-
Qua
-
Qui
-
Sex
Sáb
-
Dom
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2599
Effective 2024-03-07 through 2024-04-08
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2599
Effective 2024-03-09 through 2024-04-06
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2599
Effective 2024-03-12 through 2024-04-03
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2599
Effective 2024-04-13 through 2024-06-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
Effective 2024-04-09 through 2024-05-29
Seg
-
Ter
Qua
Qui
-
Sex
-
Sáb
-
Dom
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2599
Effective 2024-04-13 through 2024-06-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
Effective 2024-01-08 through 2024-03-04
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:10, non-stop
Boeing 737-800 (738)

Southwest Airlines WN2599
Effective 2024-04-11 through 2024-06-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
Effective 2024-04-11 through 2024-06-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
Operates only on 2024-05-26
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
19:10

00:10(+1)
Effective 2024-08-11 through 2024-08-25
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:00, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN2599
19:10

00:10(+1)
Effective 2024-09-08 through 2024-09-29
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 3:00, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN2599
Effective 2024-06-06 through 2024-07-01
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2599
Effective 2024-06-09 through 2024-08-04
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:30, non-stop
Boeing 737-800 (738)

Southwest Airlines WN2599
Effective 2024-07-08 through 2024-08-02
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2599
Effective 2024-06-08 through 2024-08-03
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2599
Effective 2024-04-14 through 2024-05-19
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
Operates only on 2024-06-02
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
-
Dom
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Voos Não-Directos:

Southwest Airlines WN2599
Effective 2024-04-13 through 2024-06-01
Seg
-
Ter
-
Qua
-
Qui
-
Sex
-
Sáb
Dom
-
Duration: 4:00, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2599
Effective 2024-04-11 through 2024-06-03
Seg
Ter
-
Qua
-
Qui
Sex
Sáb
-
Dom
-
Duration: 4:00, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Bozeman (BZN) - Denver (DEN)
  • Fresno (FAT) - Denver (DEN)
  • HARRY REID INTL AIRPORT, Las Vegas (LAS) - Denver (DEN)
  • HARRY REID INTL AIRPORT, Las Vegas (LAS) - Fresno (FAT)
  • HARRY REID INTL AIRPORT, Las Vegas (LAS) - Sacramento (SMF)
  • Midway, Chicago (MDW) - HARRY REID INTL AIRPORT, Las Vegas (LAS)
  • Saint Louis (STL) - Denver (DEN)
  • San Diego (SAN) - Austin (AUS)