フライト時刻表 |
---|
直行便: |
日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2024-09-01 |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-08 through 2024-09-21 |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-22 through 2024-09-28 |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-29 through 2024-10-27 |
日々
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Effective from 2024-10-28 |
月,木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Valid until 2024-09-02 |
月,水,木,土
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-04 through 2024-09-12 |
金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-06 through 2024-09-20 |
月,水,木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-16 through 2024-09-19 |
月
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-23 through 2024-09-30 |
水-金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-25 through 2024-09-27 |
月,水-金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Gol G3 1986 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-02 through 2024-10-25 |
直行-コードシェア便: |
日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2024-09-01 Codeshare flight, operated by Gol.(G3 1986) |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-08 through 2024-09-21 Codeshare flight, operated by Gol.(G3 1986) |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-22 through 2024-09-28 Codeshare flight, operated by Gol.(G3 1986) |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-29 through 2024-10-27 Codeshare flight, operated by Gol.(G3 1986) |
日々
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Effective from 2024-10-28 Codeshare flight, operated by Gol.(G3 1986) |
月,木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Valid until 2024-09-02 Codeshare flight, operated by Gol.(G3 1986) |
月,水,木,土
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-04 through 2024-09-12 Codeshare flight, operated by Gol.(G3 1986) |
金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-06 through 2024-09-20 Codeshare flight, operated by Gol.(G3 1986) |
月,水,木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-16 through 2024-09-19 Codeshare flight, operated by Gol.(G3 1986) |
月
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-23 through 2024-09-30 Codeshare flight, operated by Gol.(G3 1986) |
水-金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-25 through 2024-09-27 Codeshare flight, operated by Gol.(G3 1986) |
月,水-金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Azul AD 3120 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-02 through 2024-10-25 Codeshare flight, operated by Gol.(G3 1986) |
土
14:50
Salvador (SSA)
16:00
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-14 through 2024-09-21 Codeshare flight, operated by Gol.(G3 1986) |
土
14:50
Salvador (SSA)
16:00
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2024-09-28 Codeshare flight, operated by Gol.(G3 1986) |
土
14:50
Salvador (SSA)
16:00
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-05 through 2024-10-26 Codeshare flight, operated by Gol.(G3 1986) |
火,木,土
14:50
Salvador (SSA)
16:00
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-29 through 2025-03-29 Codeshare flight, operated by Gol.(G3 1986) |
木,土
15:00
Salvador (SSA)
16:10
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Valid until 2024-09-12 Codeshare flight, operated by Gol.(G3 1986) |
木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-19 through 2024-09-26 Codeshare flight, operated by Gol.(G3 1986) |
木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) TAP Air Portugal TP 5829 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-03 through 2024-10-24 Codeshare flight, operated by Gol.(G3 1986) |
日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2024-09-01 Codeshare flight, operated by Gol.(G3 1986) |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-08 through 2024-09-21 Codeshare flight, operated by Gol.(G3 1986) |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-22 through 2024-09-28 Codeshare flight, operated by Gol.(G3 1986) |
土,日
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-29 through 2024-10-27 Codeshare flight, operated by Gol.(G3 1986) |
日々
14:50
Salvador (SSA)
16:00
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-28 through 2025-03-29 Codeshare flight, operated by Gol.(G3 1986) |
月,木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Valid until 2024-09-02 Codeshare flight, operated by Gol.(G3 1986) |
月,水,木,土
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-04 through 2024-09-12 Codeshare flight, operated by Gol.(G3 1986) |
金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-06 through 2024-09-20 Codeshare flight, operated by Gol.(G3 1986) |
月,水,木
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-16 through 2024-09-19 Codeshare flight, operated by Gol.(G3 1986) |
月
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-09-23 through 2024-09-30 Codeshare flight, operated by Gol.(G3 1986) |
水-金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-09-25 through 2024-09-27 Codeshare flight, operated by Gol.(G3 1986) |
月,水-金
15:00
Salvador (SSA)
16:10
Maceio (MCZ) Aerolineas Argentinas AR 7588 Non-stop Boeing 737-800 (738) 1:10 Effective 2024-10-02 through 2024-10-25 Codeshare flight, operated by Gol.(G3 1986) |