Virgin Atlantic フライト VS 5212: Memphis - Atlanta

搭乗日を選択
フライト時刻表
直行-コードシェア便:
土 11:00 Memphis (MEM) 13:19 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:19 Effective 2024-09-14 through 2024-10-05
Codeshare flight, operated by Delta Air Lines.(DL 82)
土 11:00 Memphis (MEM) 13:18 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:18 Effective 2024-10-12 through 2024-10-19
Codeshare flight, operated by Delta Air Lines.(DL 82)
日々 11:32 Memphis (MEM) 13:53 Atlanta (ATL) S
VS 5212 Non-stop Boeing 717 (717) 1:21 Effective 2025-01-06 through 2025-03-08
Codeshare flight, operated by Delta Air Lines.(DL 82)
日々 11:32 Memphis (MEM) 13:51 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:19 Effective 2025-03-09 through 2025-04-13
Codeshare flight, operated by Delta Air Lines.(DL 82)
土 11:52 Memphis (MEM) 14:11 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:19 Operates only on 2024-11-09
Codeshare flight, operated by Delta Air Lines.(DL 82)
月-金,日 11:53 Memphis (MEM) 14:13 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:20 Effective 2024-09-09 through 2024-10-06
Codeshare flight, operated by Delta Air Lines.(DL 82)
土 11:55 Memphis (MEM) 14:14 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:19 Operates only on 2024-11-02
Codeshare flight, operated by Delta Air Lines.(DL 82)
月-金,日 11:58 Memphis (MEM) 14:17 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:19 Effective 2024-10-07 through 2024-11-08
Codeshare flight, operated by Delta Air Lines.(DL 82)
土 11:58 Memphis (MEM) 14:16 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:18 Operates only on 2024-10-26
Codeshare flight, operated by Delta Air Lines.(DL 82)
日々 12:00 Memphis (MEM) 14:19 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:19 Effective 2024-11-11 through 2024-12-18
Codeshare flight, operated by Delta Air Lines.(DL 763)
日々 12:00 Memphis (MEM) 14:20 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:20 Effective 2025-04-14 through 2025-06-07
Codeshare flight, operated by Delta Air Lines.(DL 82)
日々 12:00 Memphis (MEM) 14:24 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:24 Effective from 2025-06-08
Codeshare flight, operated by Delta Air Lines.(DL 82)
木-土 12:15 Memphis (MEM) 14:34 Atlanta (ATL) S
VS 5212 Non-stop Boeing 717 (717) 1:19 Effective 2024-12-19 through 2024-12-21
Codeshare flight, operated by Delta Air Lines.(DL 82)
土 12:15 Memphis (MEM) 14:34 Atlanta (ATL) S
VS 5212 Non-stop Boeing 717 (717) 1:19 Operates only on 2024-12-28
Codeshare flight, operated by Delta Air Lines.(DL 82)
日 12:24 Memphis (MEM) 14:44 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:20 Operates only on 2024-11-10
Codeshare flight, operated by Delta Air Lines.(DL 82)
月-金 16:15 Memphis (MEM) 18:41 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:26 Valid until 2024-09-06
Codeshare flight, operated by Delta Air Lines.(DL 952)
日 16:15 Memphis (MEM) 18:41 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:26 Operates only on 2024-09-08
Codeshare flight, operated by Delta Air Lines.(DL 952)
土,日 17:00 Memphis (MEM) 19:30 Atlanta (ATL) S
VS 5212 Non-stop Boeing 737-900 (739) 1:30 Valid until 2024-09-07
Codeshare flight, operated by Delta Air Lines.(DL 952)
月-金,日 17:18 Memphis (MEM) 19:37 Atlanta (ATL) S
VS 5212 Non-stop Boeing 717 (717) 1:19 Effective 2024-12-22 through 2025-01-03
Codeshare flight, operated by Delta Air Lines.(DL 686)
土,日 17:18 Memphis (MEM) 19:37 Atlanta (ATL) S
VS 5212 Non-stop Boeing 717 (717) 1:19 Effective 2025-01-04 through 2025-01-05
Codeshare flight, operated by Delta Air Lines.(DL 686)
Virgin Atlantic フライト VS 5212:
Memphis - Atlanta
搭乗日を選択
フライト時刻表
直行-コードシェア便:

Virgin Atlantic VS5212
Effective 2024-09-14 through 2024-10-05

-

-

-

-

-


-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2024-10-12 through 2024-10-19

-

-

-

-

-


-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:18, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2025-01-06 through 2025-03-08







Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:21, non-stop
Boeing 717 (717)

Virgin Atlantic VS5212
Effective 2025-03-09 through 2025-04-13







Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Operates only on 2024-11-09

-

-

-

-

-


-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2024-09-09 through 2024-10-06






-

Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:20, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Operates only on 2024-11-02

-

-

-

-

-


-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2024-10-07 through 2024-11-08






-

Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Operates only on 2024-10-26

-

-

-

-

-


-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:18, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2024-11-11 through 2024-12-18







Codeshare flight, operated by Delta Air Lines. (DL 763)
Duration: 1:19, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2025-04-14 through 2025-06-07







Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:20, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective from 2025-06-08







Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:24, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2024-12-19 through 2024-12-21

-

-

-




-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 717 (717)

Virgin Atlantic VS5212
Operates only on 2024-12-28

-

-

-

-

-


-
Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:19, non-stop
Boeing 717 (717)

Virgin Atlantic VS5212
Operates only on 2024-11-10

-

-

-

-

-

-

Codeshare flight, operated by Delta Air Lines. (DL 82)
Duration: 1:20, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Valid until 2024-09-06






-

-
Codeshare flight, operated by Delta Air Lines. (DL 952)
Duration: 1:26, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Operates only on 2024-09-08

-

-

-

-

-

-

Codeshare flight, operated by Delta Air Lines. (DL 952)
Duration: 1:26, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Valid until 2024-09-07

-

-

-

-

-


Codeshare flight, operated by Delta Air Lines. (DL 952)
Duration: 1:30, non-stop
Boeing 737-900 (739)

Virgin Atlantic VS5212
Effective 2024-12-22 through 2025-01-03






-

Codeshare flight, operated by Delta Air Lines. (DL 686)
Duration: 1:19, non-stop
Boeing 717 (717)

Virgin Atlantic VS5212
Effective 2025-01-04 through 2025-01-05

-

-

-

-

-


Codeshare flight, operated by Delta Air Lines. (DL 686)
Duration: 1:19, non-stop
Boeing 717 (717)
  • VS 5212 が国内フライトです。 Memphis (MEM)空港から出発、 Atlanta (ATL)空港に到着。
  • この飛行距離は331 マイルか 532キロメートルです。
  • 出発地のタイムゾーンは UTC-6 , 目的地のタイムゾーンは UTC-5 . 出発地の現地時間が(loading...)に、目的地の現地時間が(loading...)です。 出発地と目的地の時差は(loading...)時間です。
  • 直行便で最短フライト時間は 1:18 と最長フライト時間は1:30です。