Southwest Airlines フライト WN 756: Multiple routes

搭乗日を選択
フライト時刻表
直行便:
日 05:30 Denver (DEN) 07:15 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-700 (73W) 2:45 Operates only on 2024-12-01
木,金,日 06:10 Oakland (OAK) 2 11:35 Kansas City (MCI)
WN 756 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-11-03 through 2024-11-10
月,木,金,日 06:10 Oakland (OAK) 2 11:35 Kansas City (MCI)
WN 756 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-11-11 through 2024-11-25
金,日 06:10 Oakland (OAK) 2 11:35 Kansas City (MCI)
WN 756 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-12-08 through 2024-12-15
木 06:10 Oakland (OAK) 2 11:35 Kansas City (MCI)
WN 756 Non-stop Boeing 737-700 (73W) 3:25 Operates only on 2024-12-19
金 06:10 Oakland (OAK) 2 11:35 Kansas City (MCI)
WN 756 Non-stop Boeing 737-700 (73W) 3:25 Operates only on 2025-01-03
月,木,金,日 06:20 Denver (DEN) 08:10 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-13 through 2025-02-17
木,金,日 06:20 Denver (DEN) 08:10 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-21 through 2025-03-02
土 06:50 Denver (DEN) 08:35 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-700 (73W) 2:45 Effective 2025-02-15 through 2025-03-01
月-金 06:55 Las Vegas Harry Reid (LAS) 1 11:30 Love Field, Dallas (DAL) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-01-07 through 2025-01-15
火-金,日 06:55 Las Vegas Harry Reid (LAS) 1 11:30 Love Field, Dallas (DAL) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-01-19 through 2025-01-24
月-金 06:55 Las Vegas Harry Reid (LAS) 1 11:30 Love Field, Dallas (DAL) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-01-27 through 2025-02-05
火,水,日 06:55 Las Vegas Harry Reid (LAS) 1 11:30 Love Field, Dallas (DAL) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-02-09 through 2025-02-12
火,水 06:55 Las Vegas Harry Reid (LAS) 1 11:30 Love Field, Dallas (DAL) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2025-02-19 through 2025-03-05
木,金,日 07:00 Denver (DEN) 08:50 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-01-12 through 2025-01-17
月,日 07:00 Denver (DEN) 08:50 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-01-20 through 2025-01-26
木,金,日 07:00 Denver (DEN) 08:50 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-02 through 2025-02-07
月 07:00 Denver (DEN) 08:50 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2025-02-10
月,火,木 07:00 Denver (DEN) 08:50 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2025-02-18 through 2025-02-24
月 07:00 Denver (DEN) 08:50 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2025-03-03
木 07:30 Denver (DEN) 09:10 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-700 (73W) 2:40 Operates only on 2024-11-28
木 08:20 Baltimore (BWI) 10:55 West Palm Beach (PBI)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Operates only on 2024-10-31
土 08:40 Baltimore (BWI) 11:15 West Palm Beach (PBI)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-10-05 through 2024-11-02
日 08:45 Baltimore (BWI) 11:20 West Palm Beach (PBI)
WN 756 Non-stop Boeing 737-700 (73W) 2:35 Effective 2024-10-06 through 2024-10-27
月-水 08:55 Denver (DEN) 12:20 Nashville (BNA)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-04 through 2024-11-06
火,水 08:55 Denver (DEN) 12:20 Nashville (BNA)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-12 through 2024-11-20
火-金 08:55 Denver (DEN) 12:20 Nashville (BNA)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-29 through 2024-12-06
月-木 08:55 Denver (DEN) 12:20 Nashville (BNA)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-09 through 2024-12-18
火,水 08:55 Denver (DEN) 12:20 Nashville (BNA)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-24 through 2025-01-01
月 08:55 Denver (DEN) 12:20 Nashville (BNA)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-06
土 09:00 Denver (DEN) 10:35 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-11-09 through 2024-11-16
土 09:00 Denver (DEN) 10:35 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-12-07 through 2024-12-14
土 09:10 Los Angeles (LAX) 1 10:30 Las Vegas Harry Reid (LAS) 1
WN 756 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-15 through 2025-03-01
木 09:50 Los Angeles (LAX) 1 11:20 Oakland (OAK) 2
WN 756 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-11-28
月-水 11:10 Denver (DEN) 12:45 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-11-26 through 2024-12-02
月,木,金,日 11:10 Denver (DEN) 12:45 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-12-20 through 2025-01-02
日 11:10 Denver (DEN) 12:45 Los Angeles (LAX) 1
WN 756 Non-stop Boeing 737-800 (73H) 2:35 Operates only on 2025-01-05
土 11:15 Colorado Springs (COS) 12:15 Las Vegas Harry Reid (LAS) 1
WN 756 Non-stop Boeing 737-800 (73H) 2:00 Valid until 2024-09-28
木,金,日 12:10 Kansas City (MCI) 15:30 Ronald Reagan Washington (DCA)
WN 756 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-03 through 2024-11-10
月,木,金,日 12:10 Kansas City (MCI) 15:30 Ronald Reagan Washington (DCA)
WN 756 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-11-11 through 2024-11-25
金,日 12:10 Kansas City (MCI) 15:30 Ronald Reagan Washington (DCA)
WN 756 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-12-08 through 2024-12-15
木 12:10 Kansas City (MCI) 15:30 Ronald Reagan Washington (DCA)
WN 756 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-12-19
金 12:10 Kansas City (MCI) 15:30 Ronald Reagan Washington (DCA)
WN 756 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2025-01-03
月,木,金 14:15 Minneapolis/Saint Paul (MSP) 2 15:20 Denver (DEN)
WN 756 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-10-03 through 2024-10-28
金 14:15 Minneapolis/Saint Paul (MSP) 2 15:20 Denver (DEN)
WN 756 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-11-01
月,木,金 15:45 Love Field, Dallas (DAL) 1 16:40 Colorado Springs (COS)
WN 756 Non-stop Boeing 737-700 (73W) 1:55 Valid until 2024-09-30
月,木,金 16:00 Denver (DEN) 19:10 San Antonio (SAT) A
WN 756 Non-stop Boeing 737-700 (73W) 2:10 Effective 2024-10-03 through 2024-10-28
金 16:00 Denver (DEN) 19:10 San Antonio (SAT) A
WN 756 Non-stop Boeing 737-700 (73W) 2:10 Operates only on 2024-11-01
土 16:40 Orlando (MCO) 18:50 Baltimore (BWI)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2024-11-23 through 2024-11-30
土 16:40 Orlando (MCO) 18:50 Baltimore (BWI)
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:10 Effective 2024-12-21 through 2025-01-04
火,水 16:55 Colorado Springs (COS) 18:00 Las Vegas Harry Reid (LAS) 1
WN 756 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Valid until 2024-10-02
日 17:45 Colorado Springs (COS) 18:40 Las Vegas Harry Reid (LAS) 1
WN 756 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-09-01
日 20:40 Colorado Springs (COS) 21:35 Las Vegas Harry Reid (LAS) 1
WN 756 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-09-08 through 2024-09-29
日 22:15 Las Vegas Harry Reid (LAS) 1 00:30 Spokane (GEG)
WN 756 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-09-08 through 2024-09-29
The flight arrives 1 day after departure.
乗継便:
木,金,日 06:10 Oakland (OAK) 2 15:30 Ronald Reagan Washington (DCA)
WN 756 1-stop Boeing 737-700 (73W) 6:20 Effective 2024-11-03 through 2024-11-10
月,木,金,日 06:10 Oakland (OAK) 2 15:30 Ronald Reagan Washington (DCA)
WN 756 1-stop Boeing 737-700 (73W) 6:20 Effective 2024-11-11 through 2024-11-25
金,日 06:10 Oakland (OAK) 2 15:30 Ronald Reagan Washington (DCA)
WN 756 1-stop Boeing 737-700 (73W) 6:20 Effective 2024-12-08 through 2024-12-15
木 06:10 Oakland (OAK) 2 15:30 Ronald Reagan Washington (DCA)
WN 756 1-stop Boeing 737-700 (73W) 6:20 Operates only on 2024-12-19
金 06:10 Oakland (OAK) 2 15:30 Ronald Reagan Washington (DCA)
WN 756 1-stop Boeing 737-700 (73W) 6:20 Operates only on 2025-01-03
土 06:50 Denver (DEN) 10:30 Las Vegas Harry Reid (LAS) 1
WN 756 1-stop Boeing 737-700 (73W) 4:40 Effective 2025-02-15 through 2025-03-01
木 07:30 Denver (DEN) 11:20 Oakland (OAK) 2
WN 756 1-stop Boeing 737-700 (73W) 4:50 Operates only on 2024-11-28
月,木,金 14:15 Minneapolis/Saint Paul (MSP) 2 19:10 San Antonio (SAT) A
WN 756 1-stop Boeing 737-700 (73W) 4:55 Effective 2024-10-03 through 2024-10-28
金 14:15 Minneapolis/Saint Paul (MSP) 2 19:10 San Antonio (SAT) A
WN 756 1-stop Boeing 737-700 (73W) 4:55 Operates only on 2024-11-01
日 20:40 Colorado Springs (COS) 00:30 Spokane (GEG)
WN 756 1-stop Boeing 737-700 (73W) 4:50 Effective 2024-09-08 through 2024-09-29
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines フライト WN 756: Multiple routes
搭乗日を選択
フライト時刻表
直行便:

Southwest Airlines WN756
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2025-02-13 through 2025-02-17


-

-



-

Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-02-21 through 2025-03-02

-

-

-



-

Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-02-15 through 2025-03-01

-

-

-

-

-


-
Duration: 2:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2025-01-07 through 2025-01-15






-

-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-01-19 through 2025-01-24

-





-

Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-01-27 through 2025-02-05






-

-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-02-09 through 2025-02-12

-



-

-

-

Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-02-19 through 2025-03-05

-



-

-

-

-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-01-12 through 2025-01-17

-

-

-



-

Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-01-20 through 2025-01-26


-

-

-

-

-

Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-02-02 through 2025-02-07

-

-

-



-

Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2025-02-18 through 2025-02-24



-


-

-

-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Operates only on 2025-03-03


-

-

-

-

-

-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Operates only on 2024-11-28

-

-

-


-

-

-
Duration: 2:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-10-05 through 2024-11-02

-

-

-

-

-


-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-10-06 through 2024-10-27

-

-

-

-

-

-

Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-04 through 2024-11-06




-

-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-11-09 through 2024-11-16

-

-

-

-

-


-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN756
Effective 2024-12-07 through 2024-12-14

-

-

-

-

-


-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN756
Effective 2025-02-15 through 2025-03-01

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-11-28

-

-

-


-

-

-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN756
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN756
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN756
Valid until 2024-09-28

-

-

-

-

-


-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN756
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Valid until 2024-09-30


-

-



-

-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 2:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-23 through 2024-11-30

-

-

-

-

-


-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Effective 2024-12-21 through 2025-01-04

-

-

-

-

-


-
Duration: 2:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Valid until 2024-10-02

-



-

-

-

-
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN756
Operates only on 2024-09-01

-

-

-

-

-

-

Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-09-08 through 2024-09-29

-

-

-

-

-

-

Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-09-08 through 2024-09-29

-

-

-

-

-

-

Duration: 2:15, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

乗継便:

Southwest Airlines WN756
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 6:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 6:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 6:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 6:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 6:20, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2025-02-15 through 2025-03-01

-

-

-

-

-


-
Duration: 4:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
07:30

11:20
Operates only on 2024-11-28

-

-

-


-

-

-
Duration: 4:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 4:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 4:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN756
Effective 2024-09-08 through 2024-09-29

-

-

-

-

-

-

Duration: 4:50, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Baltimore (BWI) - West Palm Beach (PBI)
  • Colorado Springs (COS) - Las Vegas Harry Reid (LAS)
  • Colorado Springs (COS) - Spokane (GEG)
  • Denver (DEN) - Las Vegas Harry Reid (LAS)
  • Denver (DEN) - Los Angeles (LAX)
  • Denver (DEN) - Nashville (BNA)
  • Denver (DEN) - Oakland (OAK)
  • Denver (DEN) - San Antonio (SAT)
  • Kansas City (MCI) - Ronald Reagan Washington (DCA)
  • Las Vegas Harry Reid (LAS) - Love Field, Dallas (DAL)
  • Las Vegas Harry Reid (LAS) - Spokane (GEG)
  • Los Angeles (LAX) - Las Vegas Harry Reid (LAS)
  • Los Angeles (LAX) - Oakland (OAK)
  • Love Field, Dallas (DAL) - Colorado Springs (COS)
  • Minneapolis/Saint Paul (MSP) - Denver (DEN)
  • Minneapolis/Saint Paul (MSP) - San Antonio (SAT)
  • Oakland (OAK) - Kansas City (MCI)
  • Oakland (OAK) - Ronald Reagan Washington (DCA)
  • Orlando (MCO) - Baltimore (BWI)