Southwest Airlines フライト WN 2602: Multiple routes

搭乗日を選択
フライト時刻表
直行便:
木,金,日 11:45 Cleveland (CLE) 12:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-12 through 2025-01-17
月,日 11:45 Cleveland (CLE) 12:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-20 through 2025-01-26
木,金,日 11:45 Cleveland (CLE) 12:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-02 through 2025-02-07
月 11:45 Cleveland (CLE) 12:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-02-10
月,火,木 11:45 Cleveland (CLE) 12:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-18 through 2025-02-24
月 11:45 Cleveland (CLE) 12:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-03-03
月-水 12:05 Cleveland (CLE) 12:20 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-04 through 2024-11-06
火,水 12:05 Cleveland (CLE) 12:20 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-12 through 2024-11-20
火-金 12:05 Cleveland (CLE) 12:20 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-29 through 2024-12-06
月-木 12:05 Cleveland (CLE) 12:20 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-09 through 2024-12-18
火,水 12:05 Cleveland (CLE) 12:20 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-24 through 2025-01-01
月 12:05 Cleveland (CLE) 12:20 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2025-01-06
月,木,金,日 12:25 Cleveland (CLE) 12:50 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-13 through 2025-02-17
木,金,日 12:25 Cleveland (CLE) 12:50 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-21 through 2025-03-02
月-水 12:55 Cleveland (CLE) 13:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-11-26 through 2024-12-02
月,木,金,日 12:55 Cleveland (CLE) 13:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-12-20 through 2025-01-02
日 12:55 Cleveland (CLE) 13:10 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2025-01-05
月-水 13:00 Midway, Chicago (MDW) 14:10 Saint Louis (STL) 2
WN 2602 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-04 through 2024-11-06
火,水 13:00 Midway, Chicago (MDW) 14:10 Saint Louis (STL) 2
WN 2602 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-12 through 2024-11-20
火-金 13:00 Midway, Chicago (MDW) 14:10 Saint Louis (STL) 2
WN 2602 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-29 through 2024-12-06
月-木 13:00 Midway, Chicago (MDW) 14:10 Saint Louis (STL) 2
WN 2602 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-09 through 2024-12-18
火,水 13:00 Midway, Chicago (MDW) 14:10 Saint Louis (STL) 2
WN 2602 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-24 through 2025-01-01
月 13:00 Midway, Chicago (MDW) 14:10 Saint Louis (STL) 2
WN 2602 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2025-01-06
木,金,日 14:00 Cleveland (CLE) 14:15 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-11-03 through 2024-11-10
月,木,金,日 14:00 Cleveland (CLE) 14:15 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-11-11 through 2024-11-25
金,日 14:00 Cleveland (CLE) 14:15 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Effective 2024-12-08 through 2024-12-15
木 14:00 Cleveland (CLE) 14:15 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2024-12-19
金 14:00 Cleveland (CLE) 14:15 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2025-01-03
木 14:25 Cleveland (CLE) 14:40 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2024-11-28
火,水 18:35 Norfolk (ORF) 19:35 Baltimore (BWI)
WN 2602 Non-stop Boeing 737-800 (73H) 1:00 Valid until 2024-10-02
日 18:50 Omaha (OMA) 19:30 Denver (DEN)
WN 2602 Non-stop Boeing 737-700 (73W) 1:40 Effective 2024-10-06 through 2024-10-27
月,木,金 19:00 Austin (AUS) 21:30 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2024-10-03 through 2024-10-28
火,水 19:00 Austin (AUS) 21:30 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-10-08 through 2024-10-30
金 19:00 Austin (AUS) 21:30 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2024-11-01
月,木,金 19:40 Norfolk (ORF) 20:40 Baltimore (BWI)
WN 2602 Non-stop Boeing 737 MAX 8 (7M8) 1:00 Valid until 2024-09-30
土 21:20 Cleveland (CLE) 21:40 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-23 through 2024-11-30
土 21:20 Cleveland (CLE) 21:40 Midway, Chicago (MDW)
WN 2602 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-21 through 2025-01-04
乗継便:
月-水 12:05 Cleveland (CLE) 14:10 Saint Louis (STL) 2
WN 2602 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-04 through 2024-11-06
火,水 12:05 Cleveland (CLE) 14:10 Saint Louis (STL) 2
WN 2602 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-12 through 2024-11-20
火-金 12:05 Cleveland (CLE) 14:10 Saint Louis (STL) 2
WN 2602 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-29 through 2024-12-06
月-木 12:05 Cleveland (CLE) 14:10 Saint Louis (STL) 2
WN 2602 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-12-09 through 2024-12-18
火,水 12:05 Cleveland (CLE) 14:10 Saint Louis (STL) 2
WN 2602 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-12-24 through 2025-01-01
月 12:05 Cleveland (CLE) 14:10 Saint Louis (STL) 2
WN 2602 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2025-01-06
This flight number is listed as serving the following routes:
Southwest Airlines フライト WN 2602: Multiple routes
搭乗日を選択
フライト時刻表
直行便:

Southwest Airlines WN2602
Effective 2025-01-12 through 2025-01-17

-

-

-



-

Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Effective 2025-01-20 through 2025-01-26


-

-

-

-

-

Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Effective 2025-02-02 through 2025-02-07

-

-

-



-

Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Effective 2025-02-18 through 2025-02-24



-


-

-

-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Operates only on 2025-03-03


-

-

-

-

-

-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Effective 2024-11-04 through 2024-11-06




-

-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2025-02-13 through 2025-02-17


-

-



-

Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2025-02-21 through 2025-03-02

-

-

-



-

Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-11-04 through 2024-11-06




-

-

-

-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Operates only on 2024-11-28

-

-

-


-

-

-
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Valid until 2024-10-02

-



-

-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-10-06 through 2024-10-27

-

-

-

-

-

-

Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Effective 2024-10-08 through 2024-10-30

-



-

-

-

-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Valid until 2024-09-30


-

-



-

-
Duration: 1:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2602
Effective 2024-11-23 through 2024-11-30

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2602
Effective 2024-12-21 through 2025-01-04

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

乗継便:

Southwest Airlines WN2602
Effective 2024-11-04 through 2024-11-06




-

-

-

-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2602
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Austin (AUS) - Midway, Chicago (MDW)
  • Cleveland (CLE) - Midway, Chicago (MDW)
  • Cleveland (CLE) - Saint Louis (STL)
  • Midway, Chicago (MDW) - Saint Louis (STL)
  • Norfolk (ORF) - Baltimore (BWI)
  • Omaha (OMA) - Denver (DEN)