Southwest Airlines フライト WN 2525: Multiple routes

搭乗日を選択
フライト時刻表
直行便:
木 05:50 Pittsburgh (PIT) 07:10 Baltimore (BWI)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-11-27
土 07:35 Las Vegas Harry Reid (LAS) 1 14:45 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 4:10 Valid until 2025-05-31
日 07:40 Las Vegas Harry Reid (LAS) 1 14:50 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737-800 (73H) 4:10 Effective 2025-05-04 through 2025-05-18
日 07:40 Las Vegas Harry Reid (LAS) 1 14:50 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2025-06-01
月,木,金 08:15 Las Vegas Harry Reid (LAS) 1 15:20 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 4:05 Valid until 2025-06-02
火,水 09:00 Houston Hobby (HOU) 10:15 San Diego (SAN) 1
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2025-06-10 through 2025-07-30
火,水 11:00 San Diego (SAN) 1 12:25 San Jose (SJC) B
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-06-10 through 2025-07-30
土 13:45 San Diego (SAN) 1 17:10 Denver (DEN)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-11-22 through 2025-11-29
土 13:45 San Diego (SAN) 1 17:10 Denver (DEN)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-12-20 through 2026-01-03
月-水 13:50 San Diego (SAN) 1 17:15 Denver (DEN)
WN 2525 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-11-25 through 2025-12-01
月,火,金,日 13:50 San Diego (SAN) 1 17:15 Denver (DEN)
WN 2525 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-12-19 through 2026-01-04
日 16:10 Jacksonville (JAX) 17:45 Love Field, Dallas (DAL) 1
WN 2525 Non-stop Boeing 737-700 (Scimitar Winglets) 2:35 Effective 2025-10-05 through 2025-10-26
火,水 17:55 Las Vegas Harry Reid (LAS) 1 01:05 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 4:10 Valid until 2025-06-04
The flight arrives 1 day after departure.
日 18:00 Las Vegas Harry Reid (LAS) 1 01:10 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2025-05-25
The flight arrives 1 day after departure.
月-水 18:00 Denver (DEN) 23:40 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:40 Effective 2025-11-25 through 2025-12-01
月,火,金,日 18:00 Denver (DEN) 23:40 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:40 Effective 2025-12-19 through 2026-01-04
月,木,金,日 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Effective 2025-11-02 through 2025-11-16
月,金,日 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Effective 2025-11-21 through 2025-11-28
金,日 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Effective 2025-12-07 through 2025-12-14
木 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2025-12-18
月 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2026-01-05
月,木,金 19:30 San Diego (SAN) 1 20:55 San Jose (SJC) B
WN 2525 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-06-05 through 2025-07-03
月,木,金 19:30 San Diego (SAN) 1 20:55 San Jose (SJC) B
WN 2525 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-07-07 through 2025-08-04
土 21:05 San Jose (SJC) B 22:45 Portland (PDX)
WN 2525 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-06-07 through 2025-08-02
日 21:15 San Jose (SJC) B 22:55 Portland (PDX)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2025-06-08 through 2025-08-03
月,木,金 21:30 San Jose (SJC) B 23:10 Portland (PDX)
WN 2525 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-06-05 through 2025-07-03
月,木,金 21:30 San Jose (SJC) B 23:10 Portland (PDX)
WN 2525 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-07-07 through 2025-08-04
乗継便:
火,水 09:00 Houston Hobby (HOU) 12:25 San Jose (SJC) B
WN 2525 1-stop Boeing 737 MAX 8 (7M8) 5:25 Effective 2025-06-10 through 2025-07-30
月-水 13:50 San Diego (SAN) 1 23:40 Orlando (MCO)
WN 2525 1-stop Boeing 737-800 (73H) 6:50 Effective 2025-11-25 through 2025-12-01
月,火,金,日 13:50 San Diego (SAN) 1 23:40 Orlando (MCO)
WN 2525 1-stop Boeing 737-800 (73H) 6:50 Effective 2025-12-19 through 2026-01-04
月,木,金 19:30 San Diego (SAN) 1 23:10 Portland (PDX)
WN 2525 1-stop Boeing 737-700 (73W) 3:40 Effective 2025-06-05 through 2025-07-03
月,木,金 19:30 San Diego (SAN) 1 23:10 Portland (PDX)
WN 2525 1-stop Boeing 737-700 (73W) 3:40 Effective 2025-07-07 through 2025-08-04
This flight number is listed as serving the following routes:
Southwest Airlines フライト WN 2525: Multiple routes
搭乗日を選択
フライト時刻表
直行便:

Southwest Airlines WN2525
Operates only on 2025-11-27

-

-

-


-

-

-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Valid until 2025-05-31

-

-

-

-

-


-
Duration: 4:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-05-04 through 2025-05-18

-

-

-

-

-

-

Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Operates only on 2025-06-01

-

-

-

-

-

-

Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Valid until 2025-06-02


-

-



-

-
Duration: 4:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-11-25 through 2025-12-01




-

-

-

-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-19 through 2026-01-04



-

-


-

Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-10-05 through 2025-10-26

-

-

-

-

-

-

Duration: 2:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2525
Valid until 2025-06-04

-



-

-

-

-
Duration: 4:10, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2525
Operates only on 2025-05-25

-

-

-

-

-

-

Duration: 4:10, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN2525
Effective 2025-11-25 through 2025-12-01




-

-

-

-
Duration: 3:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-19 through 2026-01-04



-

-


-

Duration: 3:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-06-05 through 2025-07-03


-

-



-

-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-07-07 through 2025-08-04


-

-



-

-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-06-07 through 2025-08-02

-

-

-

-

-


-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-06-05 through 2025-07-03


-

-



-

-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-07-07 through 2025-08-04


-

-



-

-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

乗継便:

Southwest Airlines WN2525
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 5:25, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-11-25 through 2025-12-01




-

-

-

-
Duration: 6:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-19 through 2026-01-04



-

-


-

Duration: 6:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-06-05 through 2025-07-03


-

-



-

-
Duration: 3:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-07-07 through 2025-08-04


-

-



-

-
Duration: 3:40, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Orlando (MCO)
  • Houston Hobby (HOU) - San Diego (SAN)
  • Houston Hobby (HOU) - San Jose (SJC)
  • Jacksonville (JAX) - Love Field, Dallas (DAL)
  • Las Vegas Harry Reid (LAS) - Pittsburgh (PIT)
  • Pittsburgh (PIT) - Baltimore (BWI)
  • San Diego (SAN) - Denver (DEN)
  • San Diego (SAN) - Orlando (MCO)
  • San Diego (SAN) - Portland (PDX)
  • San Diego (SAN) - San Jose (SJC)
  • San Jose (SJC) - Portland (PDX)