Southwest Airlines フライト WN 1942: Multiple routes

搭乗日を選択
フライト時刻表
直行便:
土 06:45 San Jose (SJC) B 08:05 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Effective 2025-11-08 through 2025-11-15
土 06:45 San Jose (SJC) B 08:05 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:20 Effective 2025-12-06 through 2025-12-13
月,木,金,日 06:50 San Jose (SJC) B 08:10 Long Beach (LGB)
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-11-02 through 2025-11-16
月,金,日 06:50 San Jose (SJC) B 08:10 Long Beach (LGB)
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-11-21 through 2025-11-28
日 06:50 San Jose (SJC) B 08:10 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-11-30
金,日 06:50 San Jose (SJC) B 08:10 Long Beach (LGB)
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2025-12-07 through 2025-12-14
木 06:50 San Jose (SJC) B 08:10 Long Beach (LGB)
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-12-18
月 06:50 San Jose (SJC) B 08:10 Long Beach (LGB)
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2026-01-05
火,水 08:05 San Jose (SJC) B 09:25 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-11-04 through 2025-11-12
月-木 08:05 San Jose (SJC) B 09:25 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-11-17 through 2025-11-20
月-金 08:05 San Jose (SJC) B 09:25 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-12-02 through 2025-12-11
月-水 08:05 San Jose (SJC) B 09:25 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-12-15 through 2025-12-17
水,木 08:05 San Jose (SJC) B 09:25 Long Beach (LGB)
WN 1942 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-12-24 through 2026-01-01
日 08:15 Houston Hobby (HOU) 09:20 Albuquerque (ABQ)
WN 1942 Non-stop Boeing 737-700 (73W) 2:05 Effective 2025-06-08 through 2025-08-03
土 09:15 Albuquerque (ABQ) 10:05 San Diego (SAN) 1
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-06-07 through 2025-08-02
金 09:30 Albuquerque (ABQ) 10:20 San Diego (SAN) 1
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2025-07-04
火,水 09:40 Albuquerque (ABQ) 10:30 San Diego (SAN) 1
WN 1942 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-06-10 through 2025-07-30
月,木,金 09:55 Albuquerque (ABQ) 10:45 San Diego (SAN) 1
WN 1942 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-06-05 through 2025-07-03
日 09:55 Albuquerque (ABQ) 10:45 San Diego (SAN) 1
WN 1942 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-06-08 through 2025-08-03
月,木,金 09:55 Albuquerque (ABQ) 10:45 San Diego (SAN) 1
WN 1942 Non-stop Boeing 737-800 (73H) 1:50 Effective 2025-07-07 through 2025-08-04
火,水 11:10 San Diego (SAN) 1 19:15 Baltimore (BWI)
WN 1942 Non-stop Boeing 737-800 (73H) 5:05 Effective 2025-06-10 through 2025-07-30
木 11:10 Las Vegas Harry Reid (LAS) 1 12:10 Palm Springs (PSP)
WN 1942 Non-stop Boeing 737-800 (73H) 1:00 Operates only on 2025-11-27
日 11:20 San Diego (SAN) 1 12:45 Las Vegas Harry Reid (LAS) 1
WN 1942 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-06-08 through 2025-08-03
土 14:10 Nashville (BNA) 16:15 Love Field, Dallas (DAL) 1
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 2:05 Effective 2025-11-22 through 2025-11-29
土 14:10 Nashville (BNA) 16:15 Love Field, Dallas (DAL) 1
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 2:05 Effective 2025-12-20 through 2026-01-03
土 16:50 Love Field, Dallas (DAL) 1 17:55 Tulsa (TUL)
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:05 Effective 2025-11-22 through 2025-11-29
土 16:50 Love Field, Dallas (DAL) 1 17:55 Tulsa (TUL)
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:05 Effective 2025-12-20 through 2026-01-03
土 18:30 Tulsa (TUL) 19:45 Saint Louis (STL) 2
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-22 through 2025-11-29
土 18:30 Tulsa (TUL) 19:45 Saint Louis (STL) 2
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-20 through 2026-01-03
月-水 18:40 Tulsa (TUL) 19:55 Saint Louis (STL) 2
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-11-25 through 2025-12-01
月,火,金,日 18:40 Tulsa (TUL) 19:55 Saint Louis (STL) 2
WN 1942 Non-stop Boeing 737-700 (Scimitar Winglets) 1:15 Effective 2025-12-19 through 2026-01-04
土 18:50 Las Vegas Harry Reid (LAS) 1 19:50 Palm Springs (PSP)
WN 1942 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-08-09 through 2025-09-27
火,水 19:50 Las Vegas Harry Reid (LAS) 1 20:55 Palm Springs (PSP)
WN 1942 Non-stop Boeing 737-800 (73H) 1:05 Effective 2025-08-05 through 2025-10-01
日 20:30 Sacramento (SMF) B 21:55 Las Vegas Harry Reid (LAS) 1
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-05-25
日 20:35 Sacramento (SMF) B 22:00 Las Vegas Harry Reid (LAS) 1
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Valid until 2025-05-18
日 20:35 Sacramento (SMF) B 22:00 Las Vegas Harry Reid (LAS) 1
WN 1942 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-06-01
月,木,金 21:10 Las Vegas Harry Reid (LAS) 1 22:10 Palm Springs (PSP)
WN 1942 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-08-07 through 2025-09-29
月,木,金 21:50 Sacramento (SMF) B 23:15 Las Vegas Harry Reid (LAS) 1
WN 1942 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2025-06-02
乗継便:
日 08:15 Houston Hobby (HOU) 10:45 San Diego (SAN) 1
WN 1942 1-stop Boeing 737-700 (73W) 4:30 Effective 2025-06-08 through 2025-08-03
火,水 09:40 Albuquerque (ABQ) 19:15 Baltimore (BWI)
WN 1942 1-stop Boeing 737-800 (73H) 7:35 Effective 2025-06-10 through 2025-07-30
日 09:55 Albuquerque (ABQ) 12:45 Las Vegas Harry Reid (LAS) 1
WN 1942 1-stop Boeing 737-700 (73W) 3:50 Effective 2025-06-08 through 2025-08-03
土 14:10 Nashville (BNA) 17:55 Tulsa (TUL)
WN 1942 1-stop Boeing 737-700 (Scimitar Winglets) 3:45 Effective 2025-11-22 through 2025-11-29
土 14:10 Nashville (BNA) 17:55 Tulsa (TUL)
WN 1942 1-stop Boeing 737-700 (Scimitar Winglets) 3:45 Effective 2025-12-20 through 2026-01-03
土 16:50 Love Field, Dallas (DAL) 1 19:45 Saint Louis (STL) 2
WN 1942 1-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2025-11-22 through 2025-11-29
土 16:50 Love Field, Dallas (DAL) 1 19:45 Saint Louis (STL) 2
WN 1942 1-stop Boeing 737-700 (Scimitar Winglets) 2:55 Effective 2025-12-20 through 2026-01-03
日 08:15 Houston Hobby (HOU) 12:45 Las Vegas Harry Reid (LAS) 1
WN 1942 2-stop Boeing 737-700 (73W) 6:30 Effective 2025-06-08 through 2025-08-03
土 14:10 Nashville (BNA) 19:45 Saint Louis (STL) 2
WN 1942 2-stop Boeing 737-700 (Scimitar Winglets) 5:35 Effective 2025-11-22 through 2025-11-29
土 14:10 Nashville (BNA) 19:45 Saint Louis (STL) 2
WN 1942 2-stop Boeing 737-700 (Scimitar Winglets) 5:35 Effective 2025-12-20 through 2026-01-03
This flight number is listed as serving the following routes:
Southwest Airlines フライト WN 1942: Multiple routes
搭乗日を選択
フライト時刻表
直行便:

Southwest Airlines WN1942
Effective 2025-11-08 through 2025-11-15

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-06 through 2025-12-13

-

-

-

-

-


-
Duration: 1:20, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-11-02 through 2025-11-16


-

-



-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Effective 2025-11-21 through 2025-11-28


-

-

-


-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Operates only on 2025-11-30

-

-

-

-

-

-

Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-12-07 through 2025-12-14

-

-

-

-


-

Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Operates only on 2025-12-18

-

-

-


-

-

-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Operates only on 2026-01-05


-

-

-

-

-

-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Effective 2025-11-04 through 2025-11-12

-



-

-

-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-11-17 through 2025-11-20





-

-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-12-02 through 2025-12-11






-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-12-15 through 2025-12-17




-

-

-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-12-24 through 2026-01-01

-

-



-

-

-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1942
Effective 2025-06-07 through 2025-08-02

-

-

-

-

-


-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Operates only on 2025-07-04

-

-

-

-


-

-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-06-05 through 2025-07-03


-

-



-

-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1942
Effective 2025-07-07 through 2025-08-04


-

-



-

-
Duration: 1:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 5:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Operates only on 2025-11-27

-

-

-


-

-

-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1942
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 2:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 2:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 1:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 1:05, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-11-25 through 2025-12-01




-

-

-

-
Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-19 through 2026-01-04



-

-


-

Duration: 1:15, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-08-09 through 2025-09-27

-

-

-

-

-


-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-08-05 through 2025-10-01

-



-

-

-

-
Duration: 1:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Operates only on 2025-05-25

-

-

-

-

-

-

Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Valid until 2025-05-18

-

-

-

-

-

-

Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Operates only on 2025-06-01

-

-

-

-

-

-

Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1942
Effective 2025-08-07 through 2025-09-29


-

-



-

-
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Valid until 2025-06-02


-

-



-

-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

乗継便:

Southwest Airlines WN1942
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 4:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1942
Effective 2025-06-10 through 2025-07-30

-



-

-

-

-
Duration: 7:35, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN1942
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1942
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 3:45, 1-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 3:45, 1-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 2:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 2:55, 1-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-06-08 through 2025-08-03

-

-

-

-

-

-

Duration: 6:30, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN1942
Effective 2025-11-22 through 2025-11-29

-

-

-

-

-


-
Duration: 5:35, 2-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN1942
Effective 2025-12-20 through 2026-01-03

-

-

-

-

-


-
Duration: 5:35, 2-stop
Boeing 737-700 (Scimitar Winglets)
This flight number is listed as serving the following routes:
  • Albuquerque (ABQ) - Baltimore (BWI)
  • Albuquerque (ABQ) - Las Vegas Harry Reid (LAS)
  • Albuquerque (ABQ) - San Diego (SAN)
  • Houston Hobby (HOU) - Albuquerque (ABQ)
  • Houston Hobby (HOU) - Las Vegas Harry Reid (LAS)
  • Houston Hobby (HOU) - San Diego (SAN)
  • Las Vegas Harry Reid (LAS) - Palm Springs (PSP)
  • Love Field, Dallas (DAL) - Saint Louis (STL)
  • Love Field, Dallas (DAL) - Tulsa (TUL)
  • Nashville (BNA) - Love Field, Dallas (DAL)
  • Nashville (BNA) - Saint Louis (STL)
  • Nashville (BNA) - Tulsa (TUL)
  • Sacramento (SMF) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Baltimore (BWI)
  • San Diego (SAN) - Las Vegas Harry Reid (LAS)
  • San Jose (SJC) - Long Beach (LGB)
  • Tulsa (TUL) - Saint Louis (STL)