Southwest Airlines フライト WN 1579: Multiple routes

搭乗日を選択
フライト時刻表
直行便:
土 06:05 Sacramento (SMF) B 11:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:35 Effective 2024-11-23 through 2024-11-30
土 06:05 Sacramento (SMF) B 11:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:35 Effective 2024-12-21 through 2025-01-04
木,金,日 06:35 Indianapolis (IND) 07:40 Denver (DEN)
WN 1579 Non-stop Boeing 737-800 (73H) 3:05 Effective 2025-01-12 through 2025-01-17
月,日 06:35 Indianapolis (IND) 07:40 Denver (DEN)
WN 1579 Non-stop Boeing 737-800 (73H) 3:05 Effective 2025-01-20 through 2025-01-26
木,金,日 06:35 Indianapolis (IND) 07:40 Denver (DEN)
WN 1579 Non-stop Boeing 737-800 (73H) 3:05 Effective 2025-02-02 through 2025-02-07
月 06:35 Indianapolis (IND) 07:40 Denver (DEN)
WN 1579 Non-stop Boeing 737-800 (73H) 3:05 Operates only on 2025-02-10
月,火,木 06:35 Indianapolis (IND) 07:40 Denver (DEN)
WN 1579 Non-stop Boeing 737-800 (73H) 3:05 Effective 2025-02-18 through 2025-02-24
月 06:35 Indianapolis (IND) 07:40 Denver (DEN)
WN 1579 Non-stop Boeing 737-800 (73H) 3:05 Operates only on 2025-03-03
土 06:45 Sacramento (SMF) B 12:20 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:35 Effective 2025-02-15 through 2025-03-01
土 06:50 Sacramento (SMF) B 12:25 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:35 Effective 2024-11-09 through 2024-11-16
土 06:50 Sacramento (SMF) B 12:25 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:35 Effective 2024-12-07 through 2024-12-14
日 07:00 Oakland (OAK) 2 08:35 Las Vegas Harry Reid (LAS) 1
WN 1579 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2024-12-01
土 07:25 Sacramento (SMF) B 13:00 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737 MAX 8 (7M8) 3:35 Effective 2025-01-11 through 2025-02-08
木 07:40 Minneapolis/Saint Paul (MSP) 2 09:05 Las Vegas Harry Reid (LAS) 1
WN 1579 Non-stop Boeing 737-700 (73W) 3:25 Operates only on 2024-10-31
月-水 09:10 Sacramento (SMF) B 14:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-04 through 2024-11-06
火,水 09:10 Sacramento (SMF) B 14:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-12 through 2024-11-20
火-金 09:10 Sacramento (SMF) B 14:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-29 through 2024-12-06
月-木 09:10 Sacramento (SMF) B 14:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-12-09 through 2024-12-18
火,水 09:10 Sacramento (SMF) B 14:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-12-24 through 2025-01-01
月 09:10 Sacramento (SMF) B 14:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Operates only on 2025-01-06
月-金 10:10 Sacramento (SMF) B 15:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2025-01-07 through 2025-01-15
火-金,日 10:10 Sacramento (SMF) B 15:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2025-01-19 through 2025-01-24
月-金 10:10 Sacramento (SMF) B 15:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2025-01-27 through 2025-02-05
火,水,日 10:10 Sacramento (SMF) B 15:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2025-02-09 through 2025-02-12
火,水 10:10 Sacramento (SMF) B 15:40 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2025-02-19 through 2025-03-05
木,金,日 11:15 Sacramento (SMF) B 16:45 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-03 through 2024-11-10
月,木,金,日 11:15 Sacramento (SMF) B 16:45 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-11 through 2024-11-25
金,日 11:15 Sacramento (SMF) B 16:45 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-12-08 through 2024-12-15
木 11:15 Sacramento (SMF) B 16:45 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Operates only on 2024-12-19
金 11:15 Sacramento (SMF) B 16:45 Houston Hobby (HOU)
WN 1579 Non-stop Boeing 737-700 (73W) 3:30 Operates only on 2025-01-03
日 12:15 Minneapolis/Saint Paul (MSP) 2 13:35 Las Vegas Harry Reid (LAS) 1
WN 1579 Non-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2024-10-06 through 2024-10-27
月,木,金 12:35 Houston Hobby (HOU) 14:00 Denver (DEN)
WN 1579 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-09-30
月,木,金 13:45 Minneapolis/Saint Paul (MSP) 2 15:10 Las Vegas Harry Reid (LAS) 1
WN 1579 Non-stop Boeing 737-800 (73H) 3:25 Effective 2024-10-03 through 2024-10-28
金 13:45 Minneapolis/Saint Paul (MSP) 2 15:10 Las Vegas Harry Reid (LAS) 1
WN 1579 Non-stop Boeing 737-800 (73H) 3:25 Operates only on 2024-11-01
月-水 14:05 Denver (DEN) 16:05 Boise (BOI)
WN 1579 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-11-26 through 2024-12-02
月,木,金,日 14:05 Denver (DEN) 16:05 Boise (BOI)
WN 1579 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-12-20 through 2025-01-02
日 14:05 Denver (DEN) 16:05 Boise (BOI)
WN 1579 Non-stop Boeing 737-800 (73H) 2:00 Operates only on 2025-01-05
月,木,金 14:40 Denver (DEN) 16:05 Sacramento (SMF) B
WN 1579 Non-stop Boeing 737-700 (73W) 2:25 Valid until 2024-09-30
日 15:40 Atlanta (ATL) N 17:15 Orlando (MCO)
WN 1579 Non-stop Boeing 737-800 (73H) 1:35 Operates only on 2024-09-01
火,水 16:00 Midway, Chicago (MDW) 17:25 Minneapolis/Saint Paul (MSP) 2
WN 1579 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-08 through 2024-10-30
火,水 18:00 Minneapolis/Saint Paul (MSP) 2 19:20 Las Vegas Harry Reid (LAS) 1
WN 1579 Non-stop Boeing 737-700 (73W) 3:20 Effective 2024-10-08 through 2024-10-30
月,木,金,日 19:05 Phoenix Sky Harbor (PHX) 4 22:55 Saint Louis (STL) 2
WN 1579 Non-stop Boeing 737-800 (73H) 2:50 Effective 2025-02-13 through 2025-02-17
木,金,日 19:05 Phoenix Sky Harbor (PHX) 4 22:55 Saint Louis (STL) 2
WN 1579 Non-stop Boeing 737-800 (73H) 2:50 Effective 2025-02-21 through 2025-03-02
乗継便:
月,木,金 12:35 Houston Hobby (HOU) 16:05 Sacramento (SMF) B
WN 1579 1-stop Boeing 737-700 (73W) 5:30 Valid until 2024-09-30
火,水 16:00 Midway, Chicago (MDW) 19:20 Las Vegas Harry Reid (LAS) 1
WN 1579 1-stop Boeing 737-700 (73W) 5:20 Effective 2024-10-08 through 2024-10-30
This flight number is listed as serving the following routes:
Southwest Airlines フライト WN 1579: Multiple routes
搭乗日を選択
フライト時刻表
直行便:

Southwest Airlines WN1579
Effective 2024-11-23 through 2024-11-30

-

-

-

-

-


-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-12-21 through 2025-01-04

-

-

-

-

-


-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-01-12 through 2025-01-17

-

-

-



-

Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2025-01-20 through 2025-01-26


-

-

-

-

-

Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2025-02-02 through 2025-02-07

-

-

-



-

Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Operates only on 2025-02-10


-

-

-

-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2025-02-18 through 2025-02-24



-


-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Operates only on 2025-03-03


-

-

-

-

-

-
Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2025-02-15 through 2025-03-01

-

-

-

-

-


-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-11-09 through 2024-11-16

-

-

-

-

-


-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-12-07 through 2024-12-14

-

-

-

-

-


-
Duration: 3:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Operates only on 2024-12-01

-

-

-

-

-

-

Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2025-01-11 through 2025-02-08

-

-

-

-

-


-
Duration: 3:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1579
Operates only on 2024-10-31

-

-

-


-

-

-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-11-04 through 2024-11-06




-

-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-11-12 through 2024-11-20

-



-

-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-11-29 through 2024-12-06

-





-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-12-09 through 2024-12-18





-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-12-24 through 2025-01-01

-



-

-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Operates only on 2025-01-06


-

-

-

-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-01-07 through 2025-01-15






-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-01-19 through 2025-01-24

-





-

Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-01-27 through 2025-02-05






-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-02-09 through 2025-02-12

-



-

-

-

Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-02-19 through 2025-03-05

-



-

-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-11-03 through 2024-11-10

-

-

-



-

Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-11-11 through 2024-11-25


-

-



-

Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-12-08 through 2024-12-15

-

-

-

-


-

Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Operates only on 2024-12-19

-

-

-


-

-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Operates only on 2025-01-03

-

-

-

-


-

-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-10-06 through 2024-10-27

-

-

-

-

-

-

Duration: 3:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN1579
Valid until 2024-09-30


-

-



-

-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-10-03 through 2024-10-28


-

-



-

-
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Operates only on 2024-11-01

-

-

-

-


-

-
Duration: 3:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2024-11-26 through 2024-12-02




-

-

-

-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2024-12-20 through 2025-01-02


-

-



-

Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Operates only on 2025-01-05

-

-

-

-

-

-

Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Valid until 2024-09-30


-

-



-

-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Operates only on 2024-09-01

-

-

-

-

-

-

Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2024-10-08 through 2024-10-30

-



-

-

-

-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-10-08 through 2024-10-30

-



-

-

-

-
Duration: 3:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2025-02-13 through 2025-02-17


-

-



-

Duration: 2:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN1579
Effective 2025-02-21 through 2025-03-02

-

-

-



-

Duration: 2:50, non-stop
Boeing 737-800 (73H)

乗継便:

Southwest Airlines WN1579
Valid until 2024-09-30


-

-



-

-
Duration: 5:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN1579
Effective 2024-10-08 through 2024-10-30

-



-

-

-

-
Duration: 5:20, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Atlanta (ATL) - Orlando (MCO)
  • Denver (DEN) - Boise (BOI)
  • Denver (DEN) - Sacramento (SMF)
  • Houston Hobby (HOU) - Denver (DEN)
  • Indianapolis (IND) - Denver (DEN)
  • Midway, Chicago (MDW) - Las Vegas Harry Reid (LAS)
  • Midway, Chicago (MDW) - Minneapolis/Saint Paul (MSP)
  • Minneapolis/Saint Paul (MSP) - Las Vegas Harry Reid (LAS)
  • Oakland (OAK) - Las Vegas Harry Reid (LAS)
  • Phoenix Sky Harbor (PHX) - Saint Louis (STL)
  • Sacramento (SMF) - Houston Hobby (HOU)