Toutes les compagnies reliant Vienna (VIE) à Lisbon (LIS).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Mar,Jeu,Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-11-15 through 2024-11-22
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2024-11-17 through 2024-11-24
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Operates only on 2024-11-26
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-11-28 through 2024-12-03
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2024-12-01
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2024-12-05 through 2024-12-10
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-12-08 through 2024-12-15
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Jeu 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2024-12-12
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-12-17 through 2024-12-26
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Operates only on 2024-12-20
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Ven,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-12-27 through 2025-01-12
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-01-14 through 2025-01-17
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-01-16 through 2025-01-23
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2025-01-19
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Jeu,Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-01-24 through 2025-01-31
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-01-26 through 2025-01-28
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-02-02 through 2025-02-04
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Ven,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-02-06 through 2025-02-14
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-02-16 through 2025-02-25
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2025-02-21
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Jeu,Ven,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-02-27 through 2025-03-04
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Jeu 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-03-06 through 2025-03-13
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2025-03-07
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Ven,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-03-09 through 2025-03-14
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Jeu,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-03-16 through 2025-03-20
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mar,Ven,Dim 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-03-18 through 2025-03-25
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Jeu 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Operates only on 2025-03-27
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven 12:25 Vienna (VIE) 3 15:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Operates only on 2025-03-28
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321 (321) 3:40 Operates only on 2024-09-02
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mer 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2024-09-04
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Mer,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2024-09-06 through 2024-09-11
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Sam 13:25 Vienna (VIE) 3 16:15 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:50 Operates only on 2024-09-07
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Sam 13:25 Vienna (VIE) 3 16:15 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321 (321) 3:50 Operates only on 2024-09-14
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Mer 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321 (321) 3:40 Effective 2024-09-16 through 2024-09-30
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-09-20 through 2024-09-27
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Mer,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2024-10-02 through 2024-10-09
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Ven,Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2024-10-05 through 2024-10-12
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2024-10-14 through 2024-10-19
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mer 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Operates only on 2024-10-16
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Effective 2024-10-18 through 2024-10-21
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mer,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2024-10-23 through 2024-10-25
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Operates only on 2024-10-26
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Effective 2025-03-31 through 2025-04-05
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Mer,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-04-02 through 2025-04-07
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Mer,Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-04-09 through 2025-04-14
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mer,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-04-11 through 2025-04-16
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Mer,Ven 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320neo (32N) 3:40 Effective 2025-04-18 through 2025-04-25
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Operates only on 2025-04-19
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Sam 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A320 (320) 3:40 Effective 2025-04-21 through 2025-04-26
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
Lun,Mer 13:25 Vienna (VIE) 3 16:05 Lisbon (LIS) 1
Ethiopian Airlines ET 1738 Non-stop Airbus A321neo (32Q) 3:40 Effective 2025-04-28 through 2025-04-30
Codeshare flight, operated by TAP Air Portugal.(TP 1271)
prev   1 2 3 4 5 6 7 8 ... 13 14 15   next


Toutes les compagnies reliant Vienna (VIE) à Lisbon (LIS).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

12:25

15:05
Effective 2024-11-15 through 2024-11-22
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Effective 2024-11-17 through 2024-11-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Operates only on 2024-11-26
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2024-11-28 through 2024-12-03
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

12:25

15:05
Effective 2024-12-05 through 2024-12-10
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Operates only on 2024-12-12
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

12:25

15:05
Effective 2024-12-17 through 2024-12-26
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Operates only on 2024-12-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2024-12-27 through 2025-01-12
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Effective 2025-01-14 through 2025-01-17
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2025-01-16 through 2025-01-23
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Operates only on 2025-01-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

12:25

15:05
Effective 2025-01-24 through 2025-01-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2025-01-26 through 2025-01-28
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Effective 2025-02-02 through 2025-02-04
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2025-02-06 through 2025-02-14
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Effective 2025-02-16 through 2025-02-25
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Operates only on 2025-02-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

12:25

15:05
Effective 2025-02-27 through 2025-03-04
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Effective 2025-03-06 through 2025-03-13
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Operates only on 2025-03-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

12:25

15:05
Effective 2025-03-09 through 2025-03-14
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Effective 2025-03-16 through 2025-03-20
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

12:25

15:05
Effective 2025-03-18 through 2025-03-25
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Operates only on 2025-03-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

12:25

15:05
Operates only on 2025-03-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Operates only on 2024-09-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321 (321)

13:25

16:05
Operates only on 2024-09-04
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

13:25

16:05
Effective 2024-09-06 through 2024-09-11
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:15
Operates only on 2024-09-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:50, non-stop
Airbus A321neo (32Q)

13:25

16:15
Operates only on 2024-09-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:50, non-stop
Airbus A321 (321)

13:25

16:05
Effective 2024-09-16 through 2024-09-30
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321 (321)

13:25

16:05
Effective 2024-09-20 through 2024-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

13:25

16:05
Effective 2024-10-02 through 2024-10-09
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Effective 2024-10-05 through 2024-10-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

13:25

16:05
Effective 2024-10-14 through 2024-10-19
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Operates only on 2024-10-16
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

13:25

16:05
Effective 2024-10-18 through 2024-10-21
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

13:25

16:05
Effective 2024-10-23 through 2024-10-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

13:25

16:05
Effective 2025-03-31 through 2025-04-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

13:25

16:05
Effective 2025-04-02 through 2025-04-07
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Effective 2025-04-09 through 2025-04-14
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

13:25

16:05
Effective 2025-04-11 through 2025-04-16
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Effective 2025-04-18 through 2025-04-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320neo (32N)

13:25

16:05
Operates only on 2025-04-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)

13:25

16:05
Effective 2025-04-21 through 2025-04-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A320 (320)

13:25

16:05
Effective 2025-04-28 through 2025-04-30
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by TAP Air Portugal. (TP 1271)
Duration: 3:40, non-stop
Airbus A321neo (32Q)
prev        Page 5 / 15        next
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Vienna, Austria (VIE) et à destination de l'aéroport de Lisbon, Portugal (LIS).
  • La distance est de 2303 km.
  • Le fuseau horaire de l'aéroport de départ est UTC+1 , et le fuseau horaire de l'aéroport d'arrivée est UTC+0 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 3:30 et 3:50.