Toutes les compagnies reliant Tunis (TUN) à Madrid (MAD).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Valid until 2024-09-19
Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320 (320) 2:15 Valid until 2024-09-15
Mer 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Valid until 2024-10-23
Jeu,Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-09-22 through 2024-10-24
Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2025-03-30 through 2025-04-13
Mer 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective from 2025-04-02
Jeu,Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective from 2025-04-17
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-10-30 through 2025-03-26
Ven 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective 2024-11-01 through 2025-03-28
Dim 19:20 Tunis (TUN) M 21:35 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-10-27 through 2025-03-23
Ven 20:20 Tunis (TUN) M 23:35 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Valid until 2024-10-25
Ven 20:20 Tunis (TUN) M 23:35 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective from 2025-04-04
Dim 15:30 Tunis (TUN) 17:50 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320neo (32N) 2:20 Operates only on 2024-11-03
Dim 15:30 Tunis (TUN) 17:50 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-11-10 through 2025-03-23
Jeu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-10-31 through 2024-12-05
Jeu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320neo (32N) 2:20 Operates only on 2024-12-12
Jeu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Operates only on 2024-12-19
Jeu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320neo (32N) 2:20 Effective 2024-12-26 through 2025-01-09
Jeu 17:00 Tunis (TUN) 19:20 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2025-01-16 through 2025-03-27
Lun 17:15 Tunis (TUN) 20:35 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-09-16 through 2024-10-21
Ven 17:55 Tunis (TUN) 21:15 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-10-04 through 2024-10-25
Ven 18:15 Tunis (TUN) 21:35 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-09-20 through 2024-09-27
Ven 19:45 Tunis (TUN) 23:05 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Effective 2024-09-06 through 2024-09-13
Lun 20:50 Tunis (TUN) 00:10 Madrid (MAD)
Nouvelair Tunisie BJ 624 Non-stop Airbus A320 (320) 2:20 Valid until 2024-09-09
The flight arrives 1 day after departure.
Lun,Ven 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Effective 2025-03-31 through 2025-04-04
Lun 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2025-04-07
Jeu,Ven 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2025-04-11 through 2025-04-17
Lun 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2025-04-14
Lun,Ven 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2025-04-21 through 2025-05-09
Lun 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2025-05-12
Lun,Ven 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2025-05-16 through 2025-05-30
Ven,Dim 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2025-06-01 through 2025-06-08
Lun 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2025-06-02
Lun,Ven 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2025-06-09 through 2025-06-20
Dim 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2025-06-15
Lun,Ven,Dim 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2025-06-22 through 2025-06-29
Lun 01:40 Tunis (TUN) M 04:55 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Effective from 2025-06-30
Lun 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Valid until 2024-09-02
Ven,Dim 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Valid until 2024-09-01
Ven,Dim 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-09-06 through 2024-09-15
Lun 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-09-09
Lun 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-09-16 through 2024-09-23
Ven,Dim 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-09-20 through 2024-09-29
Lun 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-09-30
Lun,Ven 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-10-04 through 2024-10-07
Lun,Ven 02:05 Tunis (TUN) M 05:20 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-10-11 through 2024-10-25


Toutes les compagnies reliant Tunis (TUN) à Madrid (MAD).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

15:05

18:20
Valid until 2024-09-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A319 (319)

15:05

18:20
Valid until 2024-09-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A320 (320)

15:05

18:20
Valid until 2024-10-23
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:05

18:20
Effective 2024-09-22 through 2024-10-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

15:05

18:20
Effective 2025-03-30 through 2025-04-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

15:05

18:20
Effective from 2025-04-02
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:05

18:20
Effective from 2025-04-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

15:10

17:25
Effective 2024-10-30 through 2025-03-26
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A319 (319)

15:10

17:25
Effective 2024-11-01 through 2025-03-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

19:20

21:35
Effective 2024-10-27 through 2025-03-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

20:20

23:35
Valid until 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

20:20

23:35
Effective from 2025-04-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

Operates only on 2024-11-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Airbus A320neo (32N)

Effective 2024-11-10 through 2025-03-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-10-31 through 2024-12-05
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

Operates only on 2024-12-12
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320neo (32N)

Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-12-26 through 2025-01-09
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320neo (32N)

Effective 2025-01-16 through 2025-03-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-09-16 through 2024-10-21
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-10-04 through 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-09-20 through 2024-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

Effective 2024-09-06 through 2024-09-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)

20:50

00:10(+1)
Valid until 2024-09-09
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

01:40

04:55
Effective 2025-03-31 through 2025-04-04
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:40

04:55
Operates only on 2025-04-07
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:40

04:55
Effective 2025-04-11 through 2025-04-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:40

04:55
Operates only on 2025-04-14
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:40

04:55
Effective 2025-04-21 through 2025-05-09
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:40

04:55
Operates only on 2025-05-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:40

04:55
Effective 2025-05-16 through 2025-05-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:40

04:55
Effective 2025-06-01 through 2025-06-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:40

04:55
Operates only on 2025-06-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:40

04:55
Effective 2025-06-09 through 2025-06-20
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:40

04:55
Operates only on 2025-06-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:40

04:55
Effective 2025-06-22 through 2025-06-29
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:40

04:55
Effective from 2025-06-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

02:05

05:20
Valid until 2024-09-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

02:05

05:20
Valid until 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (73H)

02:05

05:20
Effective 2024-09-06 through 2024-09-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

02:05

05:20
Operates only on 2024-09-09
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

02:05

05:20
Effective 2024-09-16 through 2024-09-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

02:05

05:20
Effective 2024-09-20 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (73H)

02:05

05:20
Operates only on 2024-09-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

02:05

05:20
Effective 2024-10-04 through 2024-10-07
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

02:05

05:20
Effective 2024-10-11 through 2024-10-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Tunis, Tunisia (TUN) et à destination de l'aéroport de Madrid, Spain (MAD).
  • La distance est de 1261 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+1 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 2:15 et 2:20.