Toutes les compagnies reliant Tunis (TUN) à Madrid (MAD).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Valid until 2024-01-05
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320 (320) 2:15 Effective 2024-01-12 through 2024-01-19
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Operates only on 2024-02-02
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320 (320) 2:15 Effective 2024-02-09 through 2024-02-16
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Operates only on 2024-02-23
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320 (320) 2:15 Operates only on 2024-03-01
Ven 07:00 Tunis (TUN) M 09:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective 2024-03-08 through 2024-03-29
Mer 08:00 Tunis (TUN) M 10:15 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Operates only on 2024-01-24
Mer,Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective 2024-03-31 through 2024-04-03
Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-04-07 through 2024-04-14
Mer 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective 2024-04-10 through 2024-10-23
Jeu,Dim 15:05 Tunis (TUN) M 18:20 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-04-18 through 2024-10-24
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Operates only on 2024-01-03
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-01-10 through 2024-01-17
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-01-31 through 2024-02-28
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Operates only on 2024-03-06
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-03-13 through 2024-03-20
Mer 15:10 Tunis (TUN) M 17:25 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Operates only on 2024-03-27
Ven 16:55 Tunis (TUN) M 19:10 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320 (320) 2:15 Operates only on 2024-01-26
Dim 19:20 Tunis (TUN) M 21:35 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A319 (319) 2:15 Effective 2024-01-07 through 2024-03-17
Dim 19:20 Tunis (TUN) M 21:35 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320 (320) 2:15 Operates only on 2024-03-24
Ven 20:20 Tunis (TUN) M 23:35 Madrid (MAD) 1
Tunisair TU 606 Non-stop Airbus A320neo (32N) 2:15 Effective 2024-04-05 through 2024-10-25
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-01 through 2024-04-05
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2024-04-08
Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-04-12 through 2024-04-19
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-04-15
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-04-22 through 2024-05-10
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-05-13
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-05-17 through 2024-05-31
Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-06-02 through 2024-06-09
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-06-03
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-06-10 through 2024-06-21
Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2024-06-16
Lun,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-06-23 through 2024-07-07
Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-06-28
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Effective 2024-07-05 through 2024-07-08
Lun,Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-07-12 through 2024-07-15
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Effective 2024-07-19 through 2024-07-22
Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-07-21 through 2024-07-26
Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2024-07-28
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-07-29
Lun,Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-08-02 through 2024-08-09
Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-08-11
Lun,Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-08-12 through 2024-08-23
Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2024-08-25
Lun,Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-08-26 through 2024-09-01
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (738) 2:15 Operates only on 2024-09-02
Ven,Dim 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-09-06 through 2024-09-15
Lun 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-09-09
Lun,Ven 01:50 Tunis (TUN) M 05:05 Madrid (MAD) 1
Air Europa UX 1116 Non-stop Boeing 737-800 (7S8) 2:15 Effective 2024-09-16 through 2024-09-27
1 2   next


Toutes les compagnies reliant Tunis (TUN) à Madrid (MAD).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

07:00

09:15
Valid until 2024-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

07:00

09:15
Effective 2024-01-12 through 2024-01-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320 (320)

07:00

09:15
Operates only on 2024-02-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

07:00

09:15
Effective 2024-02-09 through 2024-02-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320 (320)

07:00

09:15
Operates only on 2024-02-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

07:00

09:15
Operates only on 2024-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320 (320)

07:00

09:15
Effective 2024-03-08 through 2024-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

08:00

10:15
Operates only on 2024-01-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:05

18:20
Effective 2024-03-31 through 2024-04-03
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:05

18:20
Effective 2024-04-07 through 2024-04-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

15:05

18:20
Effective 2024-04-10 through 2024-10-23
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:05

18:20
Effective 2024-04-18 through 2024-10-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

15:10

17:25
Operates only on 2024-01-03
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:10

17:25
Effective 2024-01-10 through 2024-01-17
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A319 (319)

15:10

17:25
Effective 2024-01-31 through 2024-02-28
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A319 (319)

15:10

17:25
Operates only on 2024-03-06
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

15:10

17:25
Effective 2024-03-13 through 2024-03-20
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A319 (319)

15:10

17:25
Operates only on 2024-03-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

16:55

19:10
Operates only on 2024-01-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320 (320)

19:20

21:35
Effective 2024-01-07 through 2024-03-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A319 (319)

19:20

21:35
Operates only on 2024-03-24
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A320 (320)

20:20

23:35
Effective 2024-04-05 through 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320neo (32N)

01:50

05:05
Effective 2024-04-01 through 2024-04-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Operates only on 2024-04-08
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Effective 2024-04-12 through 2024-04-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-04-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-04-22 through 2024-05-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-05-13
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-05-17 through 2024-05-31
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Effective 2024-06-02 through 2024-06-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-06-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-06-10 through 2024-06-21
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-06-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Effective 2024-06-23 through 2024-07-07
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-06-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-07-05 through 2024-07-08
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Effective 2024-07-12 through 2024-07-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Effective 2024-07-19 through 2024-07-22
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Effective 2024-07-21 through 2024-07-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-07-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Operates only on 2024-07-29
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-08-02 through 2024-08-09
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-08-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-08-12 through 2024-08-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-08-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Effective 2024-08-26 through 2024-09-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-09-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (738)

01:50

05:05
Effective 2024-09-06 through 2024-09-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-800 (7S8)

01:50

05:05
Operates only on 2024-09-09
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (73H)

01:50

05:05
Effective 2024-09-16 through 2024-09-27
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737-800 (7S8)
Page 1 / 2        next
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Tunis, Tunisia (TUN) et à destination de l'aéroport de Madrid, Spain (MAD).
  • La distance est de 1261 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+1 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 2:15 et 2:20.