Toutes les compagnies reliant Sacramento (SMF) à Las Vegas Harry Reid (LAS).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun 08:35 Sacramento (SMF) B 10:05 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2122 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2025-03-03
Lun,Jeu,Ven,Dim 08:50 Sacramento (SMF) B 10:20 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2122 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 08:50 Sacramento (SMF) B 10:20 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2122 Non-stop Boeing 737-800 (73H) 1:30 Effective 2025-02-21 through 2025-03-02
Jeu 09:45 Sacramento (SMF) B 11:10 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2122 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-11-28
Sam 12:35 Sacramento (SMF) B 14:00 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2122 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-15 through 2025-03-01
Sam 13:25 Sacramento (SMF) B 14:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-09 through 2024-11-16
Sam 13:25 Sacramento (SMF) B 14:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-07 through 2024-12-14
Sam 14:15 Sacramento (SMF) B 15:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-11 through 2025-02-08
Lun-Ven 14:20 Sacramento (SMF) B 15:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 14:20 Sacramento (SMF) B 15:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-19 through 2025-01-24
Lun-Ven 14:20 Sacramento (SMF) B 15:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 14:20 Sacramento (SMF) B 15:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-09 through 2025-02-12
Mar,Mer 14:20 Sacramento (SMF) B 15:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-19 through 2025-03-05
Lun,Mer 14:25 Sacramento (SMF) B 15:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 14:25 Sacramento (SMF) B 15:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-12 through 2024-11-20
Mar-Ven 14:25 Sacramento (SMF) B 15:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 14:25 Sacramento (SMF) B 15:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-09 through 2024-12-18
Mar,Mer 14:25 Sacramento (SMF) B 15:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-24 through 2025-01-01
Lun 14:25 Sacramento (SMF) B 15:50 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-01-06
Jeu,Ven,Dim 15:05 Sacramento (SMF) B 16:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-12 through 2025-01-17
Lun,Dim 15:05 Sacramento (SMF) B 16:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 15:05 Sacramento (SMF) B 16:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-02 through 2025-02-07
Lun 15:05 Sacramento (SMF) B 16:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-02-10
Lun,Mar,Jeu 15:05 Sacramento (SMF) B 16:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 15:05 Sacramento (SMF) B 16:30 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-03-03
Lun,Jeu,Ven,Dim 15:40 Sacramento (SMF) B 17:05 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 15:40 Sacramento (SMF) B 17:05 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2175 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-21 through 2025-03-02
Lun-Mer 05:25 Sacramento (SMF) B 06:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2213 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 05:25 Sacramento (SMF) B 06:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2213 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-12-20 through 2025-01-02
Dim 05:25 Sacramento (SMF) B 06:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2213 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2025-01-05
Lun,Jeu,Ven,Dim 13:50 Sacramento (SMF) B 15:20 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2225 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 13:50 Sacramento (SMF) B 15:20 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2225 Non-stop Boeing 737-700 (73W) 1:30 Effective 2025-02-21 through 2025-03-02
Jeu 05:15 Sacramento (SMF) B 06:45 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2024-11-28
Lun,Mer 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-12 through 2024-11-20
Mar-Ven 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-09 through 2024-12-18
Mar,Mer 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-24 through 2025-01-01
Lun 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-01-06
Lun-Ven 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-19 through 2025-01-24
Lun-Ven 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-09 through 2025-02-12
Mar,Mer 19:30 Sacramento (SMF) B 20:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-19 through 2025-03-05
Dim 20:15 Sacramento (SMF) B 21:40 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-12-01
Jeu,Ven,Dim 20:30 Sacramento (SMF) B 21:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-12 through 2025-01-17
Lun,Dim 20:30 Sacramento (SMF) B 21:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 20:30 Sacramento (SMF) B 21:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-02 through 2025-02-07
Lun 20:30 Sacramento (SMF) B 21:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-02-10
Lun,Mar,Jeu 20:30 Sacramento (SMF) B 21:55 Las Vegas Harry Reid (LAS) 1
Southwest Airlines WN 2282 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-18 through 2025-02-24
prev   1 2 3 4 5 6 7 8 ... 11 12 13   next


Toutes les compagnies reliant Sacramento (SMF) à Las Vegas Harry Reid (LAS).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)
prev        Page 5 / 13        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Sacramento (SMF) et à destination de l'aéroport de Las Vegas Harry Reid (LAS).
  • La distance est de 639 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC-8 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:24 et 1:48.