Toutes les compagnies reliant O'Hare, Chicago (ORD) à Madrid (MAD).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Tous les jours 17:40 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
Iberia IB 342 Non-stop Airbus A330 (330) 8:10 Effective from 2024-10-27
The flight arrives 1 day after departure.
Tous les jours 16:35 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:15 Effective 2024-03-31 through 2024-10-25
The flight arrives 1 day after departure.
Sam 16:35 O'Hare, Chicago (ORD) 3 06:50 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:15 Operates only on 2024-10-26
The flight arrives 1 day after departure.
Tous les jours 16:35 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 9:15 Effective from 2024-10-27
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Valid until 2024-01-06
The flight arrives 1 day after departure.
Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330-200 (332) 8:10 Operates only on 2024-01-07
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Effective 2024-01-08 through 2024-01-17
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Ven,Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Effective 2024-01-19 through 2024-01-25
The flight arrives 1 day after departure.
Sam 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330-200 (332) 8:10 Effective 2024-01-20 through 2024-01-27
The flight arrives 1 day after departure.
Lun,Mar,Jeu-Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Effective 2024-01-28 through 2024-02-04
The flight arrives 1 day after departure.
Mar-Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Effective 2024-02-06 through 2024-02-18
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Effective 2024-02-19 through 2024-03-09
The flight arrives 1 day after departure.
Tous les jours 17:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Effective 2024-03-10 through 2024-03-29
The flight arrives 1 day after departure.
Sam 17:45 O'Hare, Chicago (ORD) 3 08:55 Madrid (MAD) 4S
Iberia IB 6274 Non-stop Airbus A330 (330) 8:10 Operates only on 2024-03-30
The flight arrives 1 day after departure.
Vols directs en partage de code:
Tous les jours 16:35 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:15 Effective 2024-03-31 through 2024-10-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:35 O'Hare, Chicago (ORD) 3 06:50 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:15 Operates only on 2024-10-26
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Valid until 2024-01-06
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-200 (332) 8:10 Operates only on 2024-01-07
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-08 through 2024-01-17
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Ven,Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-19 through 2024-01-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-200 (332) 8:10 Effective 2024-01-20 through 2024-01-27
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Lun,Mar,Jeu-Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-28 through 2024-02-06
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-02-07 through 2024-03-09
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 17:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-03-10 through 2024-03-29
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 17:45 O'Hare, Chicago (ORD) 3 08:55 Madrid (MAD) 4S
British Airways BA 4272 Non-stop Airbus A330-300 (333) 8:10 Operates only on 2024-03-30
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:35 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:15 Effective 2024-03-31 through 2024-10-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:35 O'Hare, Chicago (ORD) 3 06:50 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:15 Operates only on 2024-10-26
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Valid until 2024-01-06
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-200 (332) 8:10 Operates only on 2024-01-07
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-08 through 2024-01-17
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Ven,Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-19 through 2024-01-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-200 (332) 8:10 Effective 2024-01-20 through 2024-01-27
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Lun,Mar,Jeu-Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-28 through 2024-02-04
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Mar-Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-02-06 through 2024-02-18
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-02-19 through 2024-03-09
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 17:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-03-10 through 2024-03-29
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 17:45 O'Hare, Chicago (ORD) 3 08:55 Madrid (MAD) 4S
Finnair AY 5660 Non-stop Airbus A330-300 (333) 8:10 Operates only on 2024-03-30
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:35 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:15 Effective 2024-03-31 through 2024-10-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:35 O'Hare, Chicago (ORD) 3 06:50 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:15 Operates only on 2024-10-26
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Valid until 2024-01-06
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-200 (332) 8:10 Operates only on 2024-01-07
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-08 through 2024-01-17
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Lun,Mar,Jeu,Ven,Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-19 through 2024-01-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-200 (332) 8:10 Effective 2024-01-20 through 2024-01-27
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Lun,Mar,Jeu-Dim 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-01-28 through 2024-02-06
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-02-07 through 2024-03-09
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 17:45 O'Hare, Chicago (ORD) 3 07:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Effective 2024-03-10 through 2024-03-29
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 17:45 O'Hare, Chicago (ORD) 3 08:55 Madrid (MAD) 4S
Qatar Airways QR 6906 Non-stop Airbus A330-300 (333) 8:10 Operates only on 2024-03-30
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Tous les jours 16:35 O'Hare, Chicago (ORD) 3 07:50 Madrid (MAD) 4S
Alaska Airlines AS 7718 Non-stop Airbus A330-300 (333) 8:15 Effective 2024-03-31 through 2024-10-25
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
Sam 16:35 O'Hare, Chicago (ORD) 3 06:50 Madrid (MAD) 4S
Alaska Airlines AS 7718 Non-stop Airbus A330-300 (333) 8:15 Operates only on 2024-10-26
Codeshare flight, operated by Iberia.(IB 6274)
The flight arrives 1 day after departure.
1 2   next


Toutes les compagnies reliant O'Hare, Chicago (ORD) à Madrid (MAD).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

17:40

07:50(+1)
Effective from 2024-10-27
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:35

07:50(+1)
Effective 2024-03-31 through 2024-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:15, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:35

06:50(+1)
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 8:15, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:35

07:50(+1)
Effective from 2024-10-27
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 9:15, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Valid until 2024-01-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Operates only on 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-08 through 2024-01-17
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-19 through 2024-01-25
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-20 through 2024-01-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-28 through 2024-02-04
Lun
Mar
Mer
-
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-02-06 through 2024-02-18
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-02-19 through 2024-03-09
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

17:45

07:55(+1)
Effective 2024-03-10 through 2024-03-29
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

17:45

08:55(+1)
Operates only on 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 8:10, non-stop
Airbus A330 (330)
The flight arrives 1 day after departure.

Vols directs en partage de code:

16:35

07:50(+1)
Effective 2024-03-31 through 2024-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

06:50(+1)
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Valid until 2024-01-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Operates only on 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-08 through 2024-01-17
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-19 through 2024-01-25
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-20 through 2024-01-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-28 through 2024-02-06
Lun
Mar
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-02-07 through 2024-03-09
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

17:45

07:55(+1)
Effective 2024-03-10 through 2024-03-29
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

17:45

08:55(+1)
Operates only on 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

07:50(+1)
Effective 2024-03-31 through 2024-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

06:50(+1)
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Valid until 2024-01-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Operates only on 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-08 through 2024-01-17
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-19 through 2024-01-25
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-20 through 2024-01-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-28 through 2024-02-04
Lun
Mar
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-02-06 through 2024-02-18
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-02-19 through 2024-03-09
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

17:45

07:55(+1)
Effective 2024-03-10 through 2024-03-29
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

17:45

08:55(+1)
Operates only on 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

07:50(+1)
Effective 2024-03-31 through 2024-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

06:50(+1)
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Valid until 2024-01-06
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Operates only on 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-08 through 2024-01-17
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-19 through 2024-01-25
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-20 through 2024-01-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-200 (332)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-01-28 through 2024-02-06
Lun
Mar
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:45

07:55(+1)
Effective 2024-02-07 through 2024-03-09
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

17:45

07:55(+1)
Effective 2024-03-10 through 2024-03-29
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

17:45

08:55(+1)
Operates only on 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:10, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

07:50(+1)
Effective 2024-03-31 through 2024-10-25
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.

16:35

06:50(+1)
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Iberia. (IB 6274)
Duration: 8:15, non-stop
Airbus A330-300 (333)
The flight arrives 1 day after departure.
Page 1 / 2        next
  • Il s'agit d'une ligne internationale au départ de l'aéroport de O'Hare, Chicago, United States (ORD) et à destination de l'aéroport de Madrid, Spain (MAD).
  • La distance est de 6741 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-6 , et le fuseau horaire de l'aéroport d'arrivée est UTC+1 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 8:10 et 9:15.