Toutes les compagnies reliant Oakland (OAK) à Guadalajara (GDL).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Tous les jours 00:05 Oakland (OAK) 1 05:00 Guadalajara (GDL) 1
VivaAerobus VB 587 Non-stop Airbus A320 (320) 3:55 Effective 2025-03-10 through 2025-05-31
Tous les jours 23:05 Oakland (OAK) 1 05:00 Guadalajara (GDL) 1
VivaAerobus VB 587 Non-stop Airbus A320 (320) 3:55 Effective 2025-03-01 through 2025-03-08
The flight arrives 1 day after departure.
Tous les jours 23:20 Oakland (OAK) 1 05:15 Guadalajara (GDL) 1
VivaAerobus VB 587 Non-stop Airbus A320 (320) 3:55 Effective 2024-12-02 through 2025-02-28
The flight arrives 1 day after departure.
Tous les jours 17:59 Oakland (OAK) 1 23:45 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A321 (321) 3:46 Effective 2024-11-03 through 2025-03-08
Lun,Mar,Jeu,Dim 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A321neo (32Q) 3:51 Valid until 2024-09-03
Lun-Sam 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A321neo (32Q) 3:51 Effective 2024-09-04 through 2024-09-28
Dim 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A320neo (32N) 3:51 Operates only on 2024-09-08
Dim 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A320 (320) 3:51 Operates only on 2024-09-15
Dim 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A320neo (32N) 3:51 Operates only on 2024-09-22
Tous les jours 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A321neo (32Q) 3:51 Effective 2024-09-29 through 2024-11-02
Tous les jours 18:39 Oakland (OAK) 1 23:30 Guadalajara (GDL) 1
Volaris Y4 1771 Non-stop Airbus A320neo (32N) 3:51 Effective from 2025-03-09
Tous les jours 23:05 Oakland (OAK) 1 04:51 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A321 (321) 3:46 Effective 2024-11-03 through 2025-03-08
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 1 04:21 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A321neo (32Q) 3:51 Valid until 2024-09-22
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 1 04:21 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A320neo (32N) 3:51 Operates only on 2024-09-29
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 1 04:21 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A321neo (32Q) 3:51 Effective 2024-10-06 through 2024-10-27
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 1 04:21 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A320neo (32N) 3:51 Effective from 2025-03-09
The flight arrives 1 day after departure.
Mar,Jeu 23:59 Oakland (OAK) 1 04:50 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A321neo (32Q) 3:51 Valid until 2024-09-03
The flight arrives 1 day after departure.
Lun 23:59 Oakland (OAK) 1 04:50 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A320neo (32N) 3:51 Effective 2024-09-02 through 2024-09-30
The flight arrives 1 day after departure.
Mar-Sam 23:59 Oakland (OAK) 1 04:50 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A321neo (32Q) 3:51 Effective 2024-09-04 through 2024-10-05
The flight arrives 1 day after departure.
Lun-Sam 23:59 Oakland (OAK) 1 04:50 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A321neo (32Q) 3:51 Effective 2024-10-07 through 2024-11-02
The flight arrives 1 day after departure.
Lun-Sam 23:59 Oakland (OAK) 1 04:50 Guadalajara (GDL) 1
Volaris Y4 1773 Non-stop Airbus A320neo (32N) 3:51 Effective from 2025-03-10
The flight arrives 1 day after departure.
Vols directs en partage de code:
Tous les jours 23:05 Oakland (OAK) 04:51 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:46 Effective 2024-11-03 through 2025-03-08
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 04:21 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A321 (321) 3:51 Valid until 2024-09-22
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 04:21 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:51 Operates only on 2024-09-29
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 04:21 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A321 (321) 3:51 Effective 2024-10-06 through 2024-10-27
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Dim 23:30 Oakland (OAK) 04:21 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:51 Effective 2025-03-09 through 2025-04-20
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Lun,Mer,Ven,Sam 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:51 Valid until 2024-09-02
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Mar,Jeu 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A321 (321) 3:51 Valid until 2024-09-03
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Mar-Sam 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A321 (321) 3:51 Effective 2024-09-04 through 2024-10-05
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Lun 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:51 Effective 2024-09-09 through 2024-09-30
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Lun-Sam 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A321 (321) 3:51 Effective 2024-10-07 through 2024-10-31
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Ven,Sam 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:51 Effective 2024-11-01 through 2024-11-02
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Lun-Sam 23:59 Oakland (OAK) 04:50 Guadalajara (GDL)
Frontier Airlines F9 6773 Non-stop Airbus A320 (320) 3:51 Effective 2025-03-10 through 2025-04-21
Codeshare flight, operated by Volaris.(Y4 1773)
The flight arrives 1 day after departure.
Tous les jours 17:59 Oakland (OAK) 23:45 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A320 (320) 3:46 Effective 2024-11-03 through 2025-03-08
Codeshare flight, operated by Volaris.(Y4 1771)
Lun,Mar,Jeu,Dim 18:39 Oakland (OAK) 23:30 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A321 (321) 3:51 Valid until 2024-09-03
Codeshare flight, operated by Volaris.(Y4 1771)
Lun-Sam 18:39 Oakland (OAK) 23:30 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A321 (321) 3:51 Effective 2024-09-04 through 2024-09-28
Codeshare flight, operated by Volaris.(Y4 1771)
Dim 18:39 Oakland (OAK) 23:30 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A320 (320) 3:51 Effective 2024-09-08 through 2024-09-22
Codeshare flight, operated by Volaris.(Y4 1771)
Tous les jours 18:39 Oakland (OAK) 23:30 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A321 (321) 3:51 Effective 2024-09-29 through 2024-10-31
Codeshare flight, operated by Volaris.(Y4 1771)
Ven,Sam 18:39 Oakland (OAK) 23:30 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A320 (320) 3:51 Effective 2024-11-01 through 2024-11-02
Codeshare flight, operated by Volaris.(Y4 1771)
Tous les jours 18:39 Oakland (OAK) 23:30 Guadalajara (GDL)
Frontier Airlines F9 6971 Non-stop Airbus A320 (320) 3:51 Effective 2025-03-09 through 2025-04-21
Codeshare flight, operated by Volaris.(Y4 1771)


Toutes les compagnies reliant Oakland (OAK) à Guadalajara (GDL).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Effective 2025-03-10 through 2025-05-31
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:55, non-stop
Airbus A320 (320)

23:05

05:00(+1)
Effective 2025-03-01 through 2025-03-08
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:55, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

23:20

05:15(+1)
Effective 2024-12-02 through 2025-02-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:55, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2024-11-03 through 2025-03-08
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:46, non-stop
Airbus A321 (321)

Valid until 2024-09-03
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A321neo (32Q)

Effective 2024-09-04 through 2024-09-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:51, non-stop
Airbus A321neo (32Q)

Operates only on 2024-09-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A320neo (32N)

Operates only on 2024-09-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A320 (320)

Operates only on 2024-09-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A320neo (32N)

Effective 2024-09-29 through 2024-11-02
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:51, non-stop
Airbus A321neo (32Q)

Effective from 2025-03-09
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:51, non-stop
Airbus A320neo (32N)

23:05

04:51(+1)
Effective 2024-11-03 through 2025-03-08
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:46, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

23:30

04:21(+1)
Valid until 2024-09-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:30

04:21(+1)
Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:30

04:21(+1)
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:30

04:21(+1)
Effective from 2025-03-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:51, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:59

04:50(+1)
Valid until 2024-09-03
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:51, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:59

04:50(+1)
Effective 2024-09-02 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:51, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

23:59

04:50(+1)
Effective 2024-09-04 through 2024-10-05
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:51, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:59

04:50(+1)
Effective 2024-10-07 through 2024-11-02
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:51, non-stop
Airbus A321neo (32Q)
The flight arrives 1 day after departure.

23:59

04:50(+1)
Effective from 2025-03-10
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Duration: 3:51, non-stop
Airbus A320neo (32N)
The flight arrives 1 day after departure.

Vols directs en partage de code:

Effective 2024-11-03 through 2025-03-08
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:46, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Valid until 2024-09-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Effective 2025-03-09 through 2025-04-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Valid until 2024-09-02
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Valid until 2024-09-03
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Effective 2024-09-04 through 2024-10-05
Lun
-
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Effective 2024-09-09 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2024-10-07 through 2024-10-31
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A321 (321)
The flight arrives 1 day after departure.

Effective 2024-11-01 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2025-03-10 through 2025-04-21
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1773)
Duration: 3:51, non-stop
Airbus A320 (320)
The flight arrives 1 day after departure.

Effective 2024-11-03 through 2025-03-08
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:46, non-stop
Airbus A320 (320)

Valid until 2024-09-03
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:51, non-stop
Airbus A321 (321)

Effective 2024-09-04 through 2024-09-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:51, non-stop
Airbus A321 (321)

Effective 2024-09-08 through 2024-09-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:51, non-stop
Airbus A320 (320)

Effective 2024-09-29 through 2024-10-31
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:51, non-stop
Airbus A321 (321)

Effective 2024-11-01 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:51, non-stop
Airbus A320 (320)

Effective 2025-03-09 through 2025-04-21
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Volaris. (Y4 1771)
Duration: 3:51, non-stop
Airbus A320 (320)
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Oakland, United States (OAK) et à destination de l'aéroport de Guadalajara, Mexico (GDL).
  • La distance est de 2639 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-8 , et le fuseau horaire de l'aéroport d'arrivée est UTC-6 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 3:46 et 3:55.