Toutes les compagnies reliant Midway, Chicago (MDW) à Pittsburgh (PIT).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven,Dim 08:05 Midway, Chicago (MDW) 10:30 Pittsburgh (PIT)
Southwest Airlines WN 1796 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-20 through 2025-01-02
Dim 08:05 Midway, Chicago (MDW) 10:30 Pittsburgh (PIT)
Southwest Airlines WN 1796 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-01-05
Sam 11:10 Midway, Chicago (MDW) 13:30 Pittsburgh (PIT)
Southwest Airlines WN 1865 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-23 through 2024-11-30
Sam 11:10 Midway, Chicago (MDW) 13:30 Pittsburgh (PIT)
Southwest Airlines WN 1865 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-21 through 2025-01-04
Sam 20:30 Midway, Chicago (MDW) 22:50 Pittsburgh (PIT)
Southwest Airlines WN 2273 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-23 through 2024-11-30
Sam 20:30 Midway, Chicago (MDW) 22:50 Pittsburgh (PIT)
Southwest Airlines WN 2273 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-21 through 2025-01-04
Dim 13:55 Midway, Chicago (MDW) 16:15 Pittsburgh (PIT)
Southwest Airlines WN 2343 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-09-01
Dim 14:05 Midway, Chicago (MDW) 16:25 Pittsburgh (PIT)
Southwest Airlines WN 2343 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-09-08 through 2024-09-29
Lun,Jeu,Ven,Dim 13:40 Midway, Chicago (MDW) 16:00 Pittsburgh (PIT)
Southwest Airlines WN 2503 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 13:40 Midway, Chicago (MDW) 16:00 Pittsburgh (PIT)
Southwest Airlines WN 2503 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-21 through 2025-03-02
Lun-Mer 13:10 Midway, Chicago (MDW) 15:30 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-04 through 2024-11-06
Mar,Mer 13:10 Midway, Chicago (MDW) 15:30 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-12 through 2024-11-20
Mar-Ven 13:10 Midway, Chicago (MDW) 15:30 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 13:10 Midway, Chicago (MDW) 15:30 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-09 through 2024-12-18
Mar,Mer 13:10 Midway, Chicago (MDW) 15:30 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-24 through 2025-01-01
Lun 13:10 Midway, Chicago (MDW) 15:30 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-01-06
Lun-Jeu 13:20 Midway, Chicago (MDW) 15:40 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 13:20 Midway, Chicago (MDW) 15:40 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-20 through 2025-01-02
Dim 13:20 Midway, Chicago (MDW) 15:40 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-05
Lun-Ven 13:45 Midway, Chicago (MDW) 16:05 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 13:45 Midway, Chicago (MDW) 16:05 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-19 through 2025-01-24
Lun-Ven 13:45 Midway, Chicago (MDW) 16:05 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 13:45 Midway, Chicago (MDW) 16:05 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-09 through 2025-02-12
Mar,Mer 13:45 Midway, Chicago (MDW) 16:05 Pittsburgh (PIT)
Southwest Airlines WN 2544 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-19 through 2025-03-05
Lun-Ven 17:10 Midway, Chicago (MDW) 19:30 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 17:10 Midway, Chicago (MDW) 19:30 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-19 through 2025-01-24
Lun-Ven 17:10 Midway, Chicago (MDW) 19:30 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 17:10 Midway, Chicago (MDW) 19:30 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-09 through 2025-02-12
Mar,Mer 17:10 Midway, Chicago (MDW) 19:30 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-19 through 2025-03-05
Lun-Mer 18:25 Midway, Chicago (MDW) 20:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-04 through 2024-11-06
Mar,Mer 18:25 Midway, Chicago (MDW) 20:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-12 through 2024-11-20
Mar-Ven 18:25 Midway, Chicago (MDW) 20:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 18:25 Midway, Chicago (MDW) 20:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-09 through 2024-12-18
Mar,Mer 18:25 Midway, Chicago (MDW) 20:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-24 through 2025-01-01
Lun 18:25 Midway, Chicago (MDW) 20:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-06
Jeu,Ven,Dim 19:00 Midway, Chicago (MDW) 21:25 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-12 through 2025-01-17
Lun,Dim 19:00 Midway, Chicago (MDW) 21:25 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 19:00 Midway, Chicago (MDW) 21:25 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-02 through 2025-02-07
Lun 19:00 Midway, Chicago (MDW) 21:25 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-02-10
Lun,Mar,Jeu 19:00 Midway, Chicago (MDW) 21:25 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 19:00 Midway, Chicago (MDW) 21:25 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-03-03
Jeu,Ven,Dim 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-11-11 through 2024-11-25
Lun-Mer 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-11-26 through 2024-12-02
Ven,Dim 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-12-08 through 2024-12-15
Jeu 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2024-12-19
Lun,Jeu,Ven,Dim 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Effective 2024-12-20 through 2025-01-02
Ven 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-01-03
Dim 20:25 Midway, Chicago (MDW) 22:45 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-800 (73H) 1:20 Operates only on 2025-01-05
Lun,Jeu,Ven,Dim 20:25 Midway, Chicago (MDW) 22:50 Pittsburgh (PIT)
Southwest Airlines WN 2597 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-13 through 2025-02-17
prev   1 2 3   next


Toutes les compagnies reliant Midway, Chicago (MDW) à Pittsburgh (PIT).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)
prev        Page 2 / 3        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Midway, Chicago (MDW) et à destination de l'aéroport de Pittsburgh (PIT).
  • La distance est de 645 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-6 , et le fuseau horaire de l'aéroport d'arrivée est UTC-5 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 1:20 et 1:25.