Toutes les compagnies reliant Fuzhou (FOC) à Songshan, Taipei (TSA).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Mar,Mer,Ven 09:45 Fuzhou (FOC) 11:25 Songshan, Taipei (TSA) 1
Mandarin Airlines AE 212 Non-stop Boeing 737-800 (738) 1:40 Valid until 2024-10-25
Mar,Mer,Ven 09:45 Fuzhou (FOC) 11:25 Songshan, Taipei (TSA) 1
Mandarin Airlines AE 212 Non-stop Boeing 737-800 (738) 1:40 Effective from 2025-04-01
Mar,Mer,Ven 10:05 Fuzhou (FOC) 11:45 Songshan, Taipei (TSA) 1
Mandarin Airlines AE 212 Non-stop Boeing 737-800 (738) 1:40 Effective 2024-10-29 through 2025-03-28
Lun-Jeu,Sam,Dim 18:10 Fuzhou (FOC) 19:45 Songshan, Taipei (TSA) 1
Xiamen Airlines MF 883 Non-stop Boeing 737-800 (738) 1:35 Effective from 2025-03-30
Lun-Jeu,Sam,Dim 18:15 Fuzhou (FOC) 19:45 Songshan, Taipei (TSA) 1
Xiamen Airlines MF 883 Non-stop Boeing 737-800 (738) 1:30 Valid until 2024-10-26
Lun-Jeu,Sam,Dim 18:20 Fuzhou (FOC) 19:45 Songshan, Taipei (TSA) 1
Xiamen Airlines MF 883 Non-stop Boeing 737-800 (738) 1:25 Effective 2024-10-27 through 2025-03-29
Vols directs en partage de code:
Lun-Jeu,Sam,Dim 18:15 Fuzhou (FOC) 19:45 Songshan, Taipei (TSA) 1
Mandarin Airlines AE 5106 Non-stop Boeing 737-800 (738) 1:30 Valid until 2024-10-26
Codeshare flight, operated by Xiamen Airlines.(MF 883)
Mar,Mer,Ven 09:45 Fuzhou (FOC) 11:25 Songshan, Taipei (TSA) 1
Xiamen Airlines MF 9030 Non-stop Boeing 737-800 (738) 1:40
Codeshare flight, operated by Mandarin Airlines.(AE 212)


Toutes les compagnies reliant Fuzhou (FOC) à Songshan, Taipei (TSA).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Valid until 2024-10-25
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective from 2025-04-01
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective 2024-10-29 through 2025-03-28
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-800 (738)

Effective from 2025-03-30
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
Duration: 1:35, non-stop
Boeing 737-800 (738)

Valid until 2024-10-26
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
Duration: 1:30, non-stop
Boeing 737-800 (738)

Effective 2024-10-27 through 2025-03-29
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
Duration: 1:25, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Valid until 2024-10-26
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
Codeshare flight, operated by Xiamen Airlines. (MF 883)
Duration: 1:30, non-stop
Boeing 737-800 (738)

Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Mandarin Airlines. (AE 212)
Duration: 1:40, non-stop
Boeing 737-800 (738)
  • Il s'agit d'une ligne internationale au départ de l'aéroport de Fuzhou, China (FOC) et à destination de l'aéroport de Songshan, Taipei, Taiwan (TSA).
  • La distance est de 212 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+8 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 1:25 et 1:40.