Toutes les compagnies reliant Cairo (CAI) à Sharm el-Sheikh (SSH).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Dim 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-15 through 2024-09-29
This is a Non-scheduled Passenger flight.
Ven 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-09-27 through 2024-10-04
This is a Non-scheduled Passenger flight.
Ven,Dim 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A220-300 (223) 1:00 Effective 2024-10-06 through 2024-10-25
This is a Non-scheduled Passenger flight.
Lun-Mer 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-03-31 through 2025-04-23
This is a Non-scheduled Passenger flight.
Jeu 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective 2025-04-03 through 2025-04-24
This is a Non-scheduled Passenger flight.
Ven,Dim 10:00 Cairo (CAI) 3 11:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A320 (320) 1:00 Effective from 2025-04-25
This is a Non-scheduled Passenger flight.
Jeu 10:30 Cairo (CAI) 3 11:30 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-05
This is a Non-scheduled Passenger flight.
Mar 10:30 Cairo (CAI) 3 11:30 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-01
This is a Non-scheduled Passenger flight.
Mar,Mer 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-04 through 2024-09-11
This is a Non-scheduled Passenger flight.
Mar-Jeu 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-12 through 2024-09-18
This is a Non-scheduled Passenger flight.
Jeu 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-19 through 2024-09-26
This is a Non-scheduled Passenger flight.
Mar,Mer 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-24 through 2024-09-25
This is a Non-scheduled Passenger flight.
Mar-Jeu 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-02 through 2024-10-09
This is a Non-scheduled Passenger flight.
Jeu 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-10-10 through 2024-10-24
This is a Non-scheduled Passenger flight.
Mar,Mer 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-15 through 2024-10-23
This is a Non-scheduled Passenger flight.
Lun-Mer 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-28
This is a Non-scheduled Passenger flight.
Jeu 11:00 Cairo (CAI) 3 12:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 222 Non-stop Airbus A320neo (32N) 1:00 Effective from 2025-05-01
This is a Non-scheduled Passenger flight.
Dim 17:35 Cairo (CAI) 3 18:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Airbus A320neo (32N) 1:00 Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Sam 17:35 Cairo (CAI) 3 18:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Boeing 737-800 (738) 1:00 Effective 2025-04-05 through 2025-04-19
This is a Non-scheduled Passenger flight.
Sam 18:35 Cairo (CAI) 3 19:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Boeing 737-800 (738) 1:00 Valid until 2024-09-21
This is a Non-scheduled Passenger flight.
Dim 18:35 Cairo (CAI) 3 19:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Airbus A320neo (32N) 1:00 Valid until 2024-10-20
This is a Non-scheduled Passenger flight.
Sam 18:35 Cairo (CAI) 3 19:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-10-05 through 2024-10-26
This is a Non-scheduled Passenger flight.
Sam 18:35 Cairo (CAI) 3 19:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Boeing 737-800 (738) 1:00 Effective from 2025-04-26
This is a Non-scheduled Passenger flight.
Dim 18:35 Cairo (CAI) 3 19:35 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Airbus A320neo (32N) 1:00 Effective from 2025-04-27
This is a Non-scheduled Passenger flight.
Sam 19:10 Cairo (CAI) 3 20:10 Sharm el-Sheikh (SSH) 1
EgyptAir MS 226 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-28
This is a Non-scheduled Passenger flight.
Dim 21:50 Cairo (CAI) 3 22:50 Sharm el-Sheikh (SSH) 1
EgyptAir MS 228 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-27
Mer 09:30 Cairo (CAI) 3 10:30 Sharm el-Sheikh (SSH) 1
EgyptAir MS 232 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-11-06 through 2025-03-26
This is a Non-scheduled Passenger flight.
Mer 10:30 Cairo (CAI) 3 11:30 Sharm el-Sheikh (SSH) 1
EgyptAir MS 232 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-10-30
This is a Non-scheduled Passenger flight.
Dim 17:10 Cairo (CAI) 3 18:10 Sharm el-Sheikh (SSH) 1
EgyptAir MS 255 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-11-10
This is a Non-scheduled Passenger flight.
Mer,Ven 20:10 Cairo (CAI) 3 21:10 Sharm el-Sheikh (SSH) 1
EgyptAir MS 322 Non-stop Boeing 737-800 (738) 1:00 Effective 2024-09-04 through 2024-09-06
This is a Non-scheduled Passenger flight.
Dim 02:15 Cairo (CAI) 3 03:15 Sharm el-Sheikh (SSH) 1
EgyptAir MS 324 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-15
This is a Non-scheduled Passenger flight.
Dim 04:00 Cairo (CAI) 3 05:00 Sharm el-Sheikh (SSH) 1
EgyptAir MS 324 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-22
This is a Non-scheduled Passenger flight.
Ven 05:30 Cairo (CAI) 3 06:30 Sharm el-Sheikh (SSH) 1
EgyptAir MS 324 Non-stop Boeing 737-800 (738) 1:00 Operates only on 2024-09-06
This is a Non-scheduled Passenger flight.
Vols directs en partage de code:
Lun-Ven,Dim 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Airbus A320neo (32N) 1:00 Valid until 2024-09-05
Codeshare flight, operated by EgyptAir.(MS 20)
Mer,Ven 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:00 Effective 2024-09-06 through 2024-09-13
Codeshare flight, operated by EgyptAir.(MS 20)
Lun,Mar,Jeu,Sam,Dim 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-07 through 2024-09-17
Codeshare flight, operated by EgyptAir.(MS 20)
Tous les jours 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-18 through 2024-09-28
Codeshare flight, operated by EgyptAir.(MS 20)
Dim 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:00 Operates only on 2024-09-29
Codeshare flight, operated by EgyptAir.(MS 20)
Tous les jours 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Airbus A320neo (32N) 1:00 Effective 2024-09-30 through 2024-10-26
Codeshare flight, operated by EgyptAir.(MS 20)
Dim 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:00 Operates only on 2024-10-27
Codeshare flight, operated by EgyptAir.(MS 20)
Tous les jours 00:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:00 Effective from 2025-04-26
Codeshare flight, operated by EgyptAir.(MS 20)
Tous les jours 22:30 Cairo (CAI) 3 23:35 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:05 Effective 2024-11-01 through 2025-03-29
Codeshare flight, operated by EgyptAir.(MS 20)
Lun-Mer 23:30 Cairo (CAI) 3 00:35 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:05 Effective 2024-10-28 through 2024-10-30
Codeshare flight, operated by EgyptAir.(MS 20)
The flight arrives 1 day after departure.
Jeu 23:30 Cairo (CAI) 3 23:35 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 0:05 Operates only on 2024-10-31
Codeshare flight, operated by EgyptAir.(MS 20)
Tous les jours 23:30 Cairo (CAI) 3 00:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:00 Effective 2025-03-30 through 2025-04-23
Codeshare flight, operated by EgyptAir.(MS 20)
The flight arrives 1 day after departure.
Jeu 23:30 Cairo (CAI) 3 01:30 Sharm el-Sheikh (SSH) 1
Air Canada AC 2859 Non-stop Boeing 737-800 (73H) 1:00 Operates only on 2025-04-24
Codeshare flight, operated by EgyptAir.(MS 20)
The flight arrives 1 day after departure.
Dim 07:15 Cairo (CAI) 3 08:20 Sharm el-Sheikh (SSH) 1
Air Canada AC 2863 Non-stop Airbus A320neo (32N) 1:05 Operates only on 2024-10-27
Codeshare flight, operated by EgyptAir.(MS 22)
Ven,Dim 06:15 Cairo (CAI) 3 07:20 Sharm el-Sheikh (SSH) 1
Air Canada AC 2866 Non-stop Airbus A320neo (32N) 1:05 Effective 2024-11-01 through 2025-03-28
Codeshare flight, operated by EgyptAir.(MS 22)
Lun-Jeu,Sam 06:15 Cairo (CAI) 3 07:20 Sharm el-Sheikh (SSH) 1
Air Canada AC 2866 Non-stop Boeing 737-800 (73H) 1:05 Effective 2024-11-02 through 2024-12-18
Codeshare flight, operated by EgyptAir.(MS 22)
Mar,Mer,Sam 06:15 Cairo (CAI) 3 07:20 Sharm el-Sheikh (SSH) 1
Air Canada AC 2866 Non-stop Boeing 737-800 (73H) 1:05 Effective 2024-12-21 through 2025-02-19
Codeshare flight, operated by EgyptAir.(MS 22)
prev   1 2 3 4 5 6   next


Toutes les compagnies reliant Cairo (CAI) à Sharm el-Sheikh (SSH).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Effective 2024-09-15 through 2024-09-29
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-27 through 2024-10-04
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2024-10-06 through 2024-10-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:00, non-stop
Airbus A220-300 (223)

Effective 2025-03-31 through 2025-04-23
This is a Non-scheduled Passenger flight.
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2025-04-03 through 2025-04-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective from 2025-04-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:00, non-stop
Airbus A320 (320)

Operates only on 2024-09-05
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-04 through 2024-09-11
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-12 through 2024-09-18
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-19 through 2024-09-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-09-24 through 2024-09-25
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-10-02 through 2024-10-09
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-10-10 through 2024-10-24
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-10-15 through 2024-10-23
This is a Non-scheduled Passenger flight.
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-04-28
This is a Non-scheduled Passenger flight.
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-05-01
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2025-03-30 through 2025-04-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2025-04-05 through 2025-04-19
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Valid until 2024-09-21
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Valid until 2024-10-20
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-10-05 through 2024-10-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-04-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective from 2025-04-27
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Airbus A320neo (32N)

Operates only on 2024-09-28
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-11-06 through 2025-03-26
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-10-30
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-11-10
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Effective 2024-09-04 through 2024-09-06
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-15
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-22
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:00, non-stop
Boeing 737-800 (738)

Operates only on 2024-09-06
This is a Non-scheduled Passenger flight.
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-800 (738)

Vols directs en partage de code:

Valid until 2024-09-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-09-06 through 2024-09-13
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2024-09-07 through 2024-09-17
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Airbus A320neo (32N)

Effective 2024-09-18 through 2024-09-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Airbus A320neo (32N)

Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2024-09-30 through 2024-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Airbus A320neo (32N)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Boeing 737-800 (73H)

Effective 2024-11-01 through 2025-03-29
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:05, non-stop
Boeing 737-800 (73H)

23:30

00:35(+1)
Effective 2024-10-28 through 2024-10-30
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:05, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 0:05, non-stop
Boeing 737-800 (73H)

23:30

00:30(+1)
Effective 2025-03-30 through 2025-04-23
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

23:30

01:30(+1)
Operates only on 2025-04-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by EgyptAir. (MS 20)
Duration: 1:00, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by EgyptAir. (MS 22)
Duration: 1:05, non-stop
Airbus A320neo (32N)

Effective 2024-11-01 through 2025-03-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by EgyptAir. (MS 22)
Duration: 1:05, non-stop
Airbus A320neo (32N)

Effective 2024-11-02 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by EgyptAir. (MS 22)
Duration: 1:05, non-stop
Boeing 737-800 (73H)

Effective 2024-12-21 through 2025-02-19
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by EgyptAir. (MS 22)
Duration: 1:05, non-stop
Boeing 737-800 (73H)
prev        Page 3 / 6        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Cairo (CAI) et à destination de l'aéroport de Sharm el-Sheikh (SSH).
  • La distance est de 377 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+2 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 0:05 et 1:30.