Qatar Airways vols de Gold Coast (OOL) à Melbourne (MEL).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Tous les jours 14:55 Gold Coast (OOL) 1 18:20 Melbourne (MEL) 3
Qatar Airways QR 8494 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 742)
Ven 15:55 Gold Coast (OOL) 1 18:20 Melbourne (MEL) 3
Qatar Airways QR 8494 Non-stop Boeing 737-700 (73G) 2:25 Valid until 2024-10-04
Codeshare flight, operated by Virgin Australia.(VA 744)
Lun-Jeu,Sam,Dim 15:55 Gold Coast (OOL) 1 18:20 Melbourne (MEL) 3
Qatar Airways QR 8494 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 744)
Lun-Jeu,Sam 17:25 Gold Coast (OOL) 1 19:50 Melbourne (MEL) 3
Qatar Airways QR 8494 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-07
Codeshare flight, operated by Virgin Australia.(VA 746)
Ven,Dim 20:55 Gold Coast (OOL) 1 23:20 Melbourne (MEL) 3
Qatar Airways QR 8494 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 754)
Sam 12:00 Gold Coast (OOL) 1 15:20 Melbourne (MEL) 3
Qatar Airways QR 8504 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-02 through 2024-12-14
Codeshare flight, operated by Virgin Australia.(VA 736)
Sam 12:00 Gold Coast (OOL) 1 15:20 Melbourne (MEL) 3
Qatar Airways QR 8504 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-28 through 2025-01-18
Codeshare flight, operated by Virgin Australia.(VA 736)
Sam 12:00 Gold Coast (OOL) 1 15:20 Melbourne (MEL) 3
Qatar Airways QR 8504 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-08 through 2025-04-05
Codeshare flight, operated by Virgin Australia.(VA 736)
Ven,Dim 19:55 Gold Coast (OOL) 1 23:20 Melbourne (MEL) 3
Qatar Airways QR 8506 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-25
Codeshare flight, operated by Virgin Australia.(VA 752)
Ven 21:10 Gold Coast (OOL) 1 00:30 Melbourne (MEL) 3
Qatar Airways QR 8508 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-15 through 2024-11-29
Codeshare flight, operated by Virgin Australia.(VA 754)
The flight arrives 1 day after departure.
Sam 13:55 Gold Coast (OOL) 1 16:20 Melbourne (MEL) 3
Qatar Airways QR 8516 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-12
Codeshare flight, operated by Virgin Australia.(VA 740)
Dim 17:25 Gold Coast (OOL) 1 19:50 Melbourne (MEL) 3
Qatar Airways QR 8516 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-09-29
Codeshare flight, operated by Virgin Australia.(VA 746)
Dim 20:55 Gold Coast (OOL) 1 00:20 Melbourne (MEL) 3
Qatar Airways QR 8516 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-06 through 2024-10-20
Codeshare flight, operated by Virgin Australia.(VA 754)
The flight arrives 1 day after departure.
Dim 20:25 Gold Coast (OOL) 1 22:50 Melbourne (MEL) 3
Qatar Airways QR 8518 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2024-09-22
Codeshare flight, operated by Virgin Australia.(VA 754)
Dim 20:25 Gold Coast (OOL) 1 22:50 Melbourne (MEL) 3
Qatar Airways QR 8518 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-09-29
Codeshare flight, operated by Virgin Australia.(VA 754)
Sam 13:55 Gold Coast (OOL) 1 16:20 Melbourne (MEL) 3
Qatar Airways QR 8520 Non-stop Boeing 737-800 (73H) 2:25 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 740)
Sam 11:55 Gold Coast (OOL) 1 15:20 Melbourne (MEL) 3
Qatar Airways QR 8524 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 736)
Ven 17:25 Gold Coast (OOL) 1 19:50 Melbourne (MEL) 3
Qatar Airways QR 8524 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-13 through 2024-10-04
Codeshare flight, operated by Virgin Australia.(VA 746)
Ven 17:25 Gold Coast (OOL) 1 19:50 Melbourne (MEL) 3
Qatar Airways QR 8524 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-11
Codeshare flight, operated by Virgin Australia.(VA 746)
Sam 12:55 Gold Coast (OOL) 1 16:20 Melbourne (MEL) 3
Qatar Airways QR 8526 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 738)
Sam 07:50 Gold Coast (OOL) 1 11:10 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-23 through 2024-12-14
Codeshare flight, operated by Virgin Australia.(VA 728)
Dim 13:55 Gold Coast (OOL) 1 16:20 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:25 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 740)
Lun,Sam,Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-27 through 2024-11-04
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun-Mer,Sam,Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-05 through 2024-11-11
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun,Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-17 through 2024-12-02
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun-Mer,Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-03 through 2024-12-09
Codeshare flight, operated by Virgin Australia.(VA 750)
Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-12-15
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun-Jeu,Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-27 through 2025-02-05
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun,Ven-Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-07 through 2025-02-10
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun,Ven-Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-15 through 2025-03-03
Codeshare flight, operated by Virgin Australia.(VA 750)
Lun,Sam,Dim 18:40 Gold Coast (OOL) 1 22:00 Melbourne (MEL) 3
Qatar Airways QR 8530 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-03-08 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 750)
Sam 12:55 Gold Coast (OOL) 1 15:20 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-09-07
Codeshare flight, operated by Virgin Australia.(VA 738)
Sam 12:55 Gold Coast (OOL) 1 15:20 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-14 through 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 738)
Sam 13:55 Gold Coast (OOL) 1 17:20 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 740)
Dim 21:10 Gold Coast (OOL) 1 00:30 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 754)
The flight arrives 1 day after departure.
Dim 21:10 Gold Coast (OOL) 1 00:30 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-10 through 2025-01-19
Codeshare flight, operated by Virgin Australia.(VA 754)
The flight arrives 1 day after departure.
Dim 21:10 Gold Coast (OOL) 1 00:30 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-09 through 2025-03-02
Codeshare flight, operated by Virgin Australia.(VA 754)
The flight arrives 1 day after departure.
Dim 21:10 Gold Coast (OOL) 1 00:30 Melbourne (MEL) 3
Qatar Airways QR 8532 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-03-16 through 2025-03-23
Codeshare flight, operated by Virgin Australia.(VA 754)
The flight arrives 1 day after departure.
Sam 17:25 Gold Coast (OOL) 1 19:50 Melbourne (MEL) 3
Qatar Airways QR 8534 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-09-14 through 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 746)
Sam 06:05 Gold Coast (OOL) 1 09:25 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-11-02 through 2024-11-16
Codeshare flight, operated by Virgin Australia.(VA 726)
Sam 06:05 Gold Coast (OOL) 1 09:25 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-01 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 726)
Dim 09:00 Gold Coast (OOL) 1 12:20 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 732)
Sam,Dim 09:00 Gold Coast (OOL) 1 12:20 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-21 through 2025-01-26
Codeshare flight, operated by Virgin Australia.(VA 732)
Lun-Ven 11:20 Gold Coast (OOL) 1 14:40 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-10-28 through 2024-12-31
Codeshare flight, operated by Virgin Australia.(VA 734)
Lun,Mar,Jeu,Ven 11:20 Gold Coast (OOL) 1 14:40 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-02 through 2025-01-28
Codeshare flight, operated by Virgin Australia.(VA 734)
Lun-Ven 11:20 Gold Coast (OOL) 1 14:40 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-01-29 through 2025-02-24
Codeshare flight, operated by Virgin Australia.(VA 734)
Lun-Ven 11:20 Gold Coast (OOL) 1 14:40 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:20 Effective 2025-02-26 through 2025-03-28
Codeshare flight, operated by Virgin Australia.(VA 734)
Sam 19:55 Gold Coast (OOL) 1 23:20 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-10-12
Codeshare flight, operated by Virgin Australia.(VA 752)
Sam 19:55 Gold Coast (OOL) 1 23:20 Melbourne (MEL) 3
Qatar Airways QR 8536 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 752)
Dim 13:00 Gold Coast (OOL) 1 16:20 Melbourne (MEL) 3
Qatar Airways QR 8538 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-12-22 through 2025-01-26
Codeshare flight, operated by Virgin Australia.(VA 738)
prev   1 2 3 4 5 6   next


Qatar Airways vols de Gold Coast (OOL) à Melbourne (MEL).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

Effective 2024-10-06 through 2024-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 742)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 744)
Duration: 2:25, non-stop
Boeing 737-700 (73G)

Valid until 2024-10-05
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 744)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-07
Lun
Mar
Mer
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 746)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-11-02 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 736)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-28 through 2025-01-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 736)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-08 through 2025-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 736)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 752)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

21:10

00:30(+1)
Effective 2024-11-15 through 2024-11-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Effective from 2025-04-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 740)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 746)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

20:55

00:20(+1)
Effective 2024-10-06 through 2024-10-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:25, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Operates only on 2024-09-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 740)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-12 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 736)
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-13 through 2024-10-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 746)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 746)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-12 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 738)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-11-23 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 728)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 740)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-27 through 2024-11-04
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-05 through 2024-11-11
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-11-17 through 2024-12-02
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-03 through 2024-12-09
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-07 through 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-15 through 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-03-08 through 2025-03-29
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 750)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-09-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 738)
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Effective 2024-09-14 through 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 738)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-10-12 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 740)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

21:10

00:30(+1)
Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

21:10

00:30(+1)
Effective 2024-11-10 through 2025-01-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

21:10

00:30(+1)
Effective 2025-02-09 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

21:10

00:30(+1)
Effective 2025-03-16 through 2025-03-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 754)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Effective 2024-09-14 through 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 746)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-11-02 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 726)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-01 through 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 726)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 732)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-12-21 through 2025-01-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 732)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2024-10-28 through 2024-12-31
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 734)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-02 through 2025-01-28
Lun
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 734)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-01-29 through 2025-02-24
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 734)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Effective 2025-02-26 through 2025-03-28
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 734)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 752)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 752)
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Effective 2024-12-22 through 2025-01-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 738)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
prev        Page 5 / 6        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Gold Coast (OOL) et à destination de l'aéroport de Melbourne (MEL).
  • La distance est de 1329 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+10 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 2:20 et 2:25.