Qatar Airways vols de Melbourne (MEL) à Gold Coast (OOL).

Sélectionnez la date du vol:  Show Calendar
HORAIRES DES VOLS
Vols directs en partage de code:
Lun-Ven,Dim 20:20 Melbourne (MEL) 3 21:30 Gold Coast (OOL) 1
Qatar Airways QR 6343 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-27 through 2025-03-28
Codeshare flight, operated by Virgin Australia.(VA 761)
Ven,Dim 20:20 Melbourne (MEL) 3 22:25 Gold Coast (OOL) 1
Qatar Airways QR 6343 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 761)
Lun-Ven,Dim 20:50 Melbourne (MEL) 3 22:00 Gold Coast (OOL) 1
Qatar Airways QR 6343 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-03-30 through 2025-04-04
Codeshare flight, operated by Virgin Australia.(VA 761)
Dim 11:10 Melbourne (MEL) 3 12:15 Gold Coast (OOL) 1
Qatar Airways QR 6375 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Effective 2024-10-13 through 2024-10-20
Codeshare flight, operated by Virgin Australia.(VA 739)
Dim 10:10 Melbourne (MEL) 3 12:15 Gold Coast (OOL) 1
Qatar Airways QR 6377 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-09-15 through 2024-09-29
Codeshare flight, operated by Virgin Australia.(VA 735)
Sam 09:30 Melbourne (MEL) 3 10:40 Gold Coast (OOL) 1
Qatar Airways QR 7103 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-21 through 2025-01-18
Codeshare flight, operated by Virgin Australia.(VA 733)
Mar-Ven,Dim 20:20 Melbourne (MEL) 3 22:25 Gold Coast (OOL) 1
Qatar Airways QR 7109 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-09-20 through 2024-09-29
Codeshare flight, operated by Virgin Australia.(VA 761)
Lun-Ven 20:20 Melbourne (MEL) 3 22:25 Gold Coast (OOL) 1
Qatar Airways QR 7109 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-09-30 through 2024-10-04
Codeshare flight, operated by Virgin Australia.(VA 761)
Sam 11:10 Melbourne (MEL) 3 12:20 Gold Coast (OOL) 1
Qatar Airways QR 7129 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-11-23 through 2024-11-30
Codeshare flight, operated by Virgin Australia.(VA 739)
Sam 11:10 Melbourne (MEL) 3 12:20 Gold Coast (OOL) 1
Qatar Airways QR 7129 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-21 through 2025-01-25
Codeshare flight, operated by Virgin Australia.(VA 739)
Sam 06:00 Melbourne (MEL) 3 07:10 Gold Coast (OOL) 1
Qatar Airways QR 7145 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-11-23 through 2024-12-14
Codeshare flight, operated by Virgin Australia.(VA 725)
Mar,Jeu 06:00 Melbourne (MEL) 3 07:10 Gold Coast (OOL) 1
Qatar Airways QR 7145 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-17 through 2024-12-19
Codeshare flight, operated by Virgin Australia.(VA 725)
Mar,Jeu 06:00 Melbourne (MEL) 3 07:10 Gold Coast (OOL) 1
Qatar Airways QR 7145 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-02 through 2025-01-09
Codeshare flight, operated by Virgin Australia.(VA 725)
Mar,Jeu 06:00 Melbourne (MEL) 3 07:10 Gold Coast (OOL) 1
Qatar Airways QR 7145 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-21 through 2025-01-23
Codeshare flight, operated by Virgin Australia.(VA 725)
Sam 19:20 Melbourne (MEL) 3 20:30 Gold Coast (OOL) 1
Qatar Airways QR 7163 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-21 through 2025-01-25
Codeshare flight, operated by Virgin Australia.(VA 759)
Sam 19:20 Melbourne (MEL) 3 20:30 Gold Coast (OOL) 1
Qatar Airways QR 7163 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2025-03-08
Codeshare flight, operated by Virgin Australia.(VA 759)
Dim 10:10 Melbourne (MEL) 3 11:15 Gold Coast (OOL) 1
Qatar Airways QR 7171 Non-stop Boeing 737 MAX 8 (7M8) 2:05 Operates only on 2024-10-06
Codeshare flight, operated by Virgin Australia.(VA 731)
Sam 11:10 Melbourne (MEL) 3 13:15 Gold Coast (OOL) 1
Qatar Airways QR 7177 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 739)
Sam 20:20 Melbourne (MEL) 3 21:30 Gold Coast (OOL) 1
Qatar Airways QR 7191 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-11-02 through 2024-11-30
Codeshare flight, operated by Virgin Australia.(VA 761)
Sam 20:20 Melbourne (MEL) 3 21:30 Gold Coast (OOL) 1
Qatar Airways QR 7191 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-21 through 2024-12-28
Codeshare flight, operated by Virgin Australia.(VA 761)
Sam 20:20 Melbourne (MEL) 3 21:30 Gold Coast (OOL) 1
Qatar Airways QR 7191 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2025-01-11
Codeshare flight, operated by Virgin Australia.(VA 761)
Sam 20:20 Melbourne (MEL) 3 21:30 Gold Coast (OOL) 1
Qatar Airways QR 7191 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-08 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 761)
Tous les jours 09:10 Melbourne (MEL) 3 10:15 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-06 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 733)
Lun-Ven,Dim 10:10 Melbourne (MEL) 3 11:20 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-10-28 through 2024-12-15
Codeshare flight, operated by Virgin Australia.(VA 735)
Mar-Jeu 10:10 Melbourne (MEL) 3 11:20 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-14 through 2025-01-16
Codeshare flight, operated by Virgin Australia.(VA 735)
Lun-Ven,Dim 10:10 Melbourne (MEL) 3 11:20 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-27 through 2025-04-04
Codeshare flight, operated by Virgin Australia.(VA 735)
Lun-Ven,Dim 10:10 Melbourne (MEL) 3 12:15 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 735)
Lun-Ven,Dim 18:50 Melbourne (MEL) 3 20:55 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2024-09-13
Codeshare flight, operated by Virgin Australia.(VA 755)
Tous les jours 18:50 Melbourne (MEL) 3 20:55 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-09-14 through 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 755)
Dim 20:20 Melbourne (MEL) 3 21:30 Gold Coast (OOL) 1
Qatar Airways QR 7193 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 761)
Dim 09:30 Melbourne (MEL) 3 10:40 Gold Coast (OOL) 1
Qatar Airways QR 7209 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-22 through 2025-01-19
Codeshare flight, operated by Virgin Australia.(VA 733)
Dim 10:10 Melbourne (MEL) 3 11:20 Gold Coast (OOL) 1
Qatar Airways QR 7209 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 735)
Dim 11:10 Melbourne (MEL) 3 13:15 Gold Coast (OOL) 1
Qatar Airways QR 7213 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2025-04-06
Codeshare flight, operated by Virgin Australia.(VA 739)
Lun,Jeu-Dim 19:10 Melbourne (MEL) 3 20:15 Gold Coast (OOL) 1
Qatar Airways QR 7229 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-06 through 2024-10-13
Codeshare flight, operated by Virgin Australia.(VA 759)
Ven-Dim 19:10 Melbourne (MEL) 3 20:15 Gold Coast (OOL) 1
Qatar Airways QR 7229 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-18 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 759)
Dim 19:20 Melbourne (MEL) 3 20:30 Gold Coast (OOL) 1
Qatar Airways QR 7229 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 759)
Sam 13:10 Melbourne (MEL) 3 15:15 Gold Coast (OOL) 1
Qatar Airways QR 8481 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2024-10-05
Codeshare flight, operated by Virgin Australia.(VA 743)
Sam 11:10 Melbourne (MEL) 3 13:15 Gold Coast (OOL) 1
Qatar Airways QR 8485 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2025-04-12
Codeshare flight, operated by Virgin Australia.(VA 739)
Dim 11:10 Melbourne (MEL) 3 12:20 Gold Coast (OOL) 1
Qatar Airways QR 8491 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-11-03 through 2024-12-15
Codeshare flight, operated by Virgin Australia.(VA 739)
Dim 11:10 Melbourne (MEL) 3 12:20 Gold Coast (OOL) 1
Qatar Airways QR 8491 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-02 through 2025-03-30
Codeshare flight, operated by Virgin Australia.(VA 739)
Sam 13:10 Melbourne (MEL) 3 15:15 Gold Coast (OOL) 1
Qatar Airways QR 8493 Non-stop Boeing 737-800 (73H) 2:05 Effective from 2025-04-12
Codeshare flight, operated by Virgin Australia.(VA 743)
Dim 07:10 Melbourne (MEL) 3 08:20 Gold Coast (OOL) 1
Qatar Airways QR 8497 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-27
Codeshare flight, operated by Virgin Australia.(VA 729)
Lun,Ven-Dim 07:10 Melbourne (MEL) 3 08:20 Gold Coast (OOL) 1
Qatar Airways QR 8497 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-16 through 2024-12-23
Codeshare flight, operated by Virgin Australia.(VA 729)
Tous les jours 07:10 Melbourne (MEL) 3 08:20 Gold Coast (OOL) 1
Qatar Airways QR 8497 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-24 through 2024-12-31
Codeshare flight, operated by Virgin Australia.(VA 729)
Lun,Ven-Dim 07:10 Melbourne (MEL) 3 08:20 Gold Coast (OOL) 1
Qatar Airways QR 8497 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-03 through 2025-01-26
Codeshare flight, operated by Virgin Australia.(VA 729)
Sam 16:50 Melbourne (MEL) 3 18:00 Gold Coast (OOL) 1
Qatar Airways QR 8497 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-11-02 through 2024-12-14
Codeshare flight, operated by Virgin Australia.(VA 751)
Sam 16:50 Melbourne (MEL) 3 18:00 Gold Coast (OOL) 1
Qatar Airways QR 8497 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-08 through 2025-03-29
Codeshare flight, operated by Virgin Australia.(VA 751)
Sam 11:10 Melbourne (MEL) 3 12:15 Gold Coast (OOL) 1
Qatar Airways QR 8499 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia.(VA 739)
Sam 11:10 Melbourne (MEL) 3 12:20 Gold Coast (OOL) 1
Qatar Airways QR 8499 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-11-02 through 2024-11-16
Codeshare flight, operated by Virgin Australia.(VA 739)
Sam 11:10 Melbourne (MEL) 3 12:20 Gold Coast (OOL) 1
Qatar Airways QR 8499 Non-stop Boeing 737-800 (73H) 2:10 Effective 2024-12-07 through 2024-12-14
Codeshare flight, operated by Virgin Australia.(VA 739)
prev   1 2 3   next


Qatar Airways vols de Melbourne (MEL) à Gold Coast (OOL).
Sélectionnez la date du vol:  Show Calendar
HORAIRES DES VOLS
Vols directs en partage de code:

Effective 2025-01-27 through 2025-03-28
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2025-03-30 through 2025-04-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-10-13 through 2024-10-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Effective 2024-09-15 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 735)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-12-21 through 2025-01-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 733)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-09-20 through 2024-09-29
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-09-30 through 2024-10-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-21 through 2025-01-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-11-23 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 725)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-17 through 2024-12-19
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 725)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-01-02 through 2025-01-09
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 725)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-01-21 through 2025-01-23
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 725)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-21 through 2025-01-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 759)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Operates only on 2025-03-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 759)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 731)
Duration: 2:05, non-stop
Boeing 737 MAX 8 (7M8)

Valid until 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-02 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-21 through 2024-12-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Operates only on 2025-01-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-02-08 through 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 733)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-10-28 through 2024-12-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 735)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-01-14 through 2025-01-16
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 735)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-01-27 through 2025-04-04
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 735)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 735)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Valid until 2024-09-13
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 755)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-09-14 through 2024-10-05
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 755)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 761)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-22 through 2025-01-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 733)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 735)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-10-06 through 2024-10-13
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 759)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-10-18 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 759)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 759)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Valid until 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 743)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-03 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-02-02 through 2025-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective from 2025-04-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 743)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia. (VA 729)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-16 through 2024-12-23
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 729)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-24 through 2024-12-31
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 729)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-01-03 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia. (VA 729)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-11-02 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 751)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2025-02-08 through 2025-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 751)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-10-12 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Effective 2024-11-02 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia. (VA 739)
Duration: 2:10, non-stop
Boeing 737-800 (73H)
prev        Page 2 / 3        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Melbourne (MEL) et à destination de l'aéroport de Gold Coast (OOL).
  • La distance est de 1329 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+10 (plus 1 h d'heure d'été). Dans les deux aéroports, il est actuellement 5:29am.
  • Pour les vols directs, le temps de vol varie entre 2:05 et 2:10.