Qatar Airways vols de O.R. Tambo, Johannesburg (JNB) à Ndola (NLA).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:35 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:20 Operates only on 2024-06-09
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-06-10 through 2024-06-14
Codeshare flight, operated by Airlink.(4Z 150)
Jeu 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 140 (ERD) 2:15 Operates only on 2024-06-13
Codeshare flight, operated by Airlink.(4Z 150)
Jeu-Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-06-15 through 2024-06-21
Codeshare flight, operated by Airlink.(4Z 150)
Lun-Mer,Sam 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:15 Effective 2024-06-17 through 2024-06-26
Codeshare flight, operated by Airlink.(4Z 150)
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 140 (ERD) 2:15 Operates only on 2024-06-23
Codeshare flight, operated by Airlink.(4Z 150)
Jeu-Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:15 Effective 2024-06-27 through 2024-07-04
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-07-01 through 2024-07-12
Codeshare flight, operated by Airlink.(4Z 150)
Mar 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-07-02 through 2024-07-30
Codeshare flight, operated by Airlink.(4Z 150)
Jeu,Sam 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:15 Effective 2024-07-06 through 2024-08-01
Codeshare flight, operated by Airlink.(4Z 150)
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:35 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:20 Operates only on 2024-07-14
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-07-15 through 2024-07-24
Codeshare flight, operated by Airlink.(4Z 150)
Ven 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 140 (ERD) 2:15 Operates only on 2024-07-26
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-07-28 through 2024-08-02
Codeshare flight, operated by Airlink.(4Z 150)
Mar,Sam,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-08-03 through 2024-08-06
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-08-05 through 2024-08-16
Codeshare flight, operated by Airlink.(4Z 150)
Jeu,Sam 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:15 Effective 2024-08-08 through 2024-09-19
Codeshare flight, operated by Airlink.(4Z 150)
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:35 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:20 Operates only on 2024-08-11
Codeshare flight, operated by Airlink.(4Z 150)
Mar 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-08-13 through 2024-08-27
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-08-18 through 2024-08-30
Codeshare flight, operated by Airlink.(4Z 150)
Mar,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-09-01 through 2024-09-03
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-09-02 through 2024-09-08
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mar 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-09-09 through 2024-09-10
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-09-11 through 2024-09-20
Codeshare flight, operated by Airlink.(4Z 150)
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:35 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:20 Operates only on 2024-09-15
Codeshare flight, operated by Airlink.(4Z 150)
Mar,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-09-17 through 2024-09-24
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Sam 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-09-21 through 2024-09-27
Codeshare flight, operated by Airlink.(4Z 150)
Jeu,Sam 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:15 Effective 2024-09-26 through 2024-10-24
Codeshare flight, operated by Airlink.(4Z 150)
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 140 (ERD) 2:15 Operates only on 2024-09-29
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-09-30 through 2024-10-11
Codeshare flight, operated by Airlink.(4Z 150)
Mar 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer ERJ 135 (ER3) 2:15 Effective 2024-10-01 through 2024-10-22
Codeshare flight, operated by Airlink.(4Z 150)
Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:35 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 170 / EMB 175 (E70) 2:20 Operates only on 2024-10-13
Codeshare flight, operated by Airlink.(4Z 150)
Lun,Mer,Ven,Dim 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Effective 2024-10-14 through 2024-10-25
Codeshare flight, operated by Airlink.(4Z 150)
Sam 10:15 O.R. Tambo, Johannesburg (JNB) B 12:30 Ndola (NLA)
Qatar Airways QR 5742 Non-stop Embraer EMB 190 / EMB 195 (E90) 2:15 Operates only on 2024-10-26
Codeshare flight, operated by Airlink.(4Z 150)
prev   1 2


Qatar Airways vols de O.R. Tambo, Johannesburg (JNB) à Ndola (NLA).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

Operates only on 2024-06-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:20, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-06-10 through 2024-06-14
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Operates only on 2024-06-13
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 140 (ERD)

Effective 2024-06-15 through 2024-06-21
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-06-17 through 2024-06-26
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 170 / EMB 175 (E70)

Operates only on 2024-06-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 140 (ERD)

Effective 2024-06-27 through 2024-07-04
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 170 / EMB 175 (E70)

Effective 2024-07-01 through 2024-07-12
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-07-02 through 2024-07-30
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-07-06 through 2024-08-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 170 / EMB 175 (E70)

Operates only on 2024-07-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:20, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-07-15 through 2024-07-24
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Operates only on 2024-07-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 140 (ERD)

Effective 2024-07-28 through 2024-08-02
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-08-03 through 2024-08-06
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-08-05 through 2024-08-16
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-08-08 through 2024-09-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 170 / EMB 175 (E70)

Operates only on 2024-08-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:20, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-08-13 through 2024-08-27
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-08-18 through 2024-08-30
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-09-01 through 2024-09-03
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-09-02 through 2024-09-08
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-09-09 through 2024-09-10
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-09-11 through 2024-09-20
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Operates only on 2024-09-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:20, non-stop
Embraer EMB 170 / EMB 175 (E70)

Effective 2024-09-17 through 2024-09-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Effective 2024-09-21 through 2024-09-27
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-09-26 through 2024-10-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 170 / EMB 175 (E70)

Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 140 (ERD)

Effective 2024-09-30 through 2024-10-11
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Effective 2024-10-01 through 2024-10-22
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer ERJ 135 (ER3)

Operates only on 2024-10-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:20, non-stop
Embraer EMB 170 / EMB 175 (E70)

Effective 2024-10-14 through 2024-10-25
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)

Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Airlink. (4Z 150)
Duration: 2:15, non-stop
Embraer EMB 190 / EMB 195 (E90)
prev        Page 2 / 2
  • Il s'agit d'une ligne internationale au départ de l'aéroport de O.R. Tambo, Johannesburg, South Africa (JNB) et à destination de l'aéroport de Ndola, Zambia (NLA).
  • La distance est de 1464 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+2 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 2:15 et 2:20.