Qatar Airways vols de Cairns (CNS) à Brisbane (BNE).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Ven 20:50 Cairns (CNS) 2 23:05 Brisbane (BNE) D
Qatar Airways QR 4232 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-06-14 through 2024-06-28
Codeshare flight, operated by Virgin Australia International.(VA 792)
Sam 14:40 Cairns (CNS) 2 17:00 Brisbane (BNE) D
Qatar Airways QR 4235 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-01-06
Codeshare flight, operated by Virgin Australia International.(VA 784)
Sam 14:40 Cairns (CNS) 2 17:00 Brisbane (BNE) D
Qatar Airways QR 4238 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-03 through 2024-02-10
Codeshare flight, operated by Virgin Australia International.(VA 784)
Sam 14:40 Cairns (CNS) 2 17:00 Brisbane (BNE) D
Qatar Airways QR 4238 Non-stop Boeing 737-700 (73W) 2:20 Operates only on 2024-02-17
Codeshare flight, operated by Virgin Australia International.(VA 784)
Sam 14:40 Cairns (CNS) 2 17:00 Brisbane (BNE) D
Qatar Airways QR 4238 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-24 through 2024-03-23
Codeshare flight, operated by Virgin Australia International.(VA 784)
Mar 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6302 Non-stop Boeing 737-700 (73W) 2:15 Operates only on 2024-04-02
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mar 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6302 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-10-08 through 2024-10-22
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mar 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6302 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2024-10-29
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mar 16:40 Cairns (CNS) 2 18:55 Brisbane (BNE) D
Qatar Airways QR 6304 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-07-02 through 2024-10-01
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mar 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6304 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-04-09 through 2024-06-25
Codeshare flight, operated by Virgin Australia International.(VA 786)
Sam 13:50 Cairns (CNS) 2 16:05 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-800 (73H) 2:15 Operates only on 2024-04-06
Codeshare flight, operated by Virgin Australia International.(VA 782)
Sam 13:50 Cairns (CNS) 2 16:05 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-10-12 through 2024-10-26
Codeshare flight, operated by Virgin Australia International.(VA 782)
Mar,Mer 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-700 (73W) 2:20 Valid until 2024-01-24
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mar,Mer 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-30 through 2024-03-27
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mer 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-700 (73W) 2:15 Operates only on 2024-04-03
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mer 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-10-09 through 2024-10-23
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mer 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6312 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-10-30
Codeshare flight, operated by Virgin Australia International.(VA 786)
Sam 13:50 Cairns (CNS) 2 16:05 Brisbane (BNE) D
Qatar Airways QR 6318 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-13 through 2024-10-05
Codeshare flight, operated by Virgin Australia International.(VA 782)
Lun,Mer-Ven,Dim 16:40 Cairns (CNS) 2 18:55 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-07-01 through 2024-10-04
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-01-01
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Jeu,Ven,Dim 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-01-04 through 2024-01-19
Codeshare flight, operated by Virgin Australia International.(VA 786)
Dim 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73G) 2:20 Operates only on 2024-01-21
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Jeu,Ven,Dim 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73W) 2:20 Effective 2024-01-22 through 2024-01-28
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Jeu,Ven,Dim 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-29 through 2024-03-29
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Jeu,Ven,Dim 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-03-31 through 2024-04-08
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Mer-Ven,Dim 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-04-10 through 2024-06-30
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Jeu,Ven,Dim 16:50 Cairns (CNS) 2 19:05 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-700 (73W) 2:15 Effective 2024-10-06 through 2024-10-25
Codeshare flight, operated by Virgin Australia International.(VA 786)
Lun,Jeu,Ven,Dim 16:50 Cairns (CNS) 2 19:10 Brisbane (BNE) D
Qatar Airways QR 6379 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2024-10-27
Codeshare flight, operated by Virgin Australia International.(VA 786)
Mar 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7115 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-30 through 2024-03-12
Codeshare flight, operated by Virgin Australia International.(VA 770)
Ven 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7116 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-03-29
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mar 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7118 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-03-19 through 2024-03-26
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mar 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7118 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-09 through 2024-09-24
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mar 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7129 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-01-23
Codeshare flight, operated by Virgin Australia International.(VA 770)
Jeu 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7139 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-02-01 through 2024-03-14
Codeshare flight, operated by Virgin Australia International.(VA 770)
Sam 14:40 Cairns (CNS) 2 17:00 Brisbane (BNE) D
Qatar Airways QR 7147 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-13 through 2024-01-27
Codeshare flight, operated by Virgin Australia International.(VA 784)
Sam 14:40 Cairns (CNS) 2 17:00 Brisbane (BNE) D
Qatar Airways QR 7147 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-03-30
Codeshare flight, operated by Virgin Australia International.(VA 784)
Mer 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7158 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-01-31 through 2024-03-13
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mer 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7172 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-01-24
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mer 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7172 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-03-20 through 2024-03-27
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mer 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7172 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-10 through 2024-04-24
Codeshare flight, operated by Virgin Australia International.(VA 770)
Mer 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7172 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-06-19 through 2024-09-25
Codeshare flight, operated by Virgin Australia International.(VA 770)
Jeu 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7179 Non-stop Boeing 737-800 (73H) 2:20 Effective 2024-03-21 through 2024-03-28
Codeshare flight, operated by Virgin Australia International.(VA 770)
Jeu 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7179 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-11 through 2024-09-26
Codeshare flight, operated by Virgin Australia International.(VA 770)
Jeu 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7186 Non-stop Boeing 737-800 (73H) 2:20 Valid until 2024-01-25
Codeshare flight, operated by Virgin Australia International.(VA 770)
Sam 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7192 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-03-30
Codeshare flight, operated by Virgin Australia International.(VA 770)
Ven,Sam 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7192 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-12 through 2024-04-20
Codeshare flight, operated by Virgin Australia International.(VA 770)
Sam 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7192 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-04-27 through 2024-06-08
Codeshare flight, operated by Virgin Australia International.(VA 770)
Ven 06:00 Cairns (CNS) 2 08:15 Brisbane (BNE) D
Qatar Airways QR 7192 Non-stop Boeing 737-800 (73H) 2:15 Effective 2024-06-21 through 2024-09-27
Codeshare flight, operated by Virgin Australia International.(VA 770)
Lun-Sam 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7192 Non-stop Boeing 737-800 (73H) 2:20 Effective from 2024-10-28
Codeshare flight, operated by Virgin Australia International.(VA 770)
Sam 06:00 Cairns (CNS) 2 08:20 Brisbane (BNE) D
Qatar Airways QR 7202 Non-stop Boeing 737-800 (73H) 2:20 Operates only on 2024-03-23
Codeshare flight, operated by Virgin Australia International.(VA 770)
1 2   next


Qatar Airways vols de Cairns (CNS) à Brisbane (BNE).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

20:50

23:05
Effective 2024-06-14 through 2024-06-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 792)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

14:40

17:00
Valid until 2024-01-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 784)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

14:40

17:00
Effective 2024-02-03 through 2024-02-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 784)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

14:40

17:00
Operates only on 2024-02-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 784)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

14:40

17:00
Effective 2024-02-24 through 2024-03-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 784)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

16:50

19:05
Operates only on 2024-04-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:05
Effective 2024-10-08 through 2024-10-22
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:10
Effective from 2024-10-29
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

16:40

18:55
Effective 2024-07-02 through 2024-10-01
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:05
Effective 2024-04-09 through 2024-06-25
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

13:50

16:05
Operates only on 2024-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 782)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

13:50

16:05
Effective 2024-10-12 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 782)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

16:50

19:10
Valid until 2024-01-24
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

16:50

19:10
Effective 2024-01-30 through 2024-03-27
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

16:50

19:05
Operates only on 2024-04-03
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:05
Effective 2024-10-09 through 2024-10-23
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:10
Operates only on 2024-10-30
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

13:50

16:05
Effective 2024-04-13 through 2024-10-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 782)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

16:40

18:55
Effective 2024-07-01 through 2024-10-04
Lun
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:10
Operates only on 2024-01-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

16:50

19:10
Effective 2024-01-04 through 2024-01-19
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

16:50

19:10
Operates only on 2024-01-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-700 (73G)

16:50

19:10
Effective 2024-01-22 through 2024-01-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-700 (73W)

16:50

19:10
Effective 2024-01-29 through 2024-03-29
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

16:50

19:05
Effective 2024-03-31 through 2024-04-08
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:05
Effective 2024-04-10 through 2024-06-30
Lun
Mar
-
Mer
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:05
Effective 2024-10-06 through 2024-10-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:15, non-stop
Boeing 737-700 (73W)

16:50

19:10
Effective from 2024-10-27
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 786)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective 2024-01-30 through 2024-03-12
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Valid until 2024-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective 2024-03-19 through 2024-03-26
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-04-09 through 2024-09-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:20
Valid until 2024-01-23
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective 2024-02-01 through 2024-03-14
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

14:40

17:00
Effective 2024-01-13 through 2024-01-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 784)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

14:40

17:00
Operates only on 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 784)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective 2024-01-31 through 2024-03-13
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Valid until 2024-01-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective 2024-03-20 through 2024-03-27
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-04-10 through 2024-04-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-06-19 through 2024-09-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective 2024-03-21 through 2024-03-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-04-11 through 2024-09-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:20
Valid until 2024-01-25
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Operates only on 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-04-12 through 2024-04-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-04-27 through 2024-06-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:15
Effective 2024-06-21 through 2024-09-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:15, non-stop
Boeing 737-800 (73H)

06:00

08:20
Effective from 2024-10-28
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)

06:00

08:20
Operates only on 2024-03-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 770)
Duration: 2:20, non-stop
Boeing 737-800 (73H)
Page 1 / 2        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Cairns (CNS) et à destination de l'aéroport de Brisbane (BNE).
  • La distance est de 1393 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+10 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol varie entre 2:15 et 2:20.