Qatar Airways vols de Canberra (CBR) à Melbourne (MEL).

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4223 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-10
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 07:15 Canberra (CBR) 08:25 Melbourne (MEL) 3
Qatar Airways QR 4228 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-04-05
Codeshare flight, operated by Virgin Australia International.(VA 254)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4229 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-26
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4230 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-03-18 through 2024-03-25
Codeshare flight, operated by Virgin Australia International.(VA 274)
Jeu 06:45 Canberra (CBR) 07:55 Melbourne (MEL) 3
Qatar Airways QR 4232 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-01
Codeshare flight, operated by Virgin Australia International.(VA 252)
Mar 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4234 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-23
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4237 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-01-14 through 2024-01-21
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4237 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-01-29 through 2024-02-05
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-07
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4241 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-12
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4242 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-01-05 through 2024-01-12
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4243 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-19
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4243 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-28
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4244 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-04
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4245 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-02-19 through 2024-02-26
Codeshare flight, operated by Virgin Australia International.(VA 274)
Jeu 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4251 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-25
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4252 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-17
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun-Jeu 07:15 Canberra (CBR) 08:25 Melbourne (MEL) 3
Qatar Airways QR 4253 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-04-01 through 2024-04-04
Codeshare flight, operated by Virgin Australia International.(VA 254)
Lun-Ven 07:15 Canberra (CBR) 08:25 Melbourne (MEL) 3
Qatar Airways QR 4253 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-04-08 through 2024-04-24
Codeshare flight, operated by Virgin Australia International.(VA 254)
Mar,Mer,Ven 07:15 Canberra (CBR) 08:25 Melbourne (MEL) 3
Qatar Airways QR 4253 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-04-26 through 2024-05-01
Codeshare flight, operated by Virgin Australia International.(VA 254)
Mar,Mer 07:15 Canberra (CBR) 08:25 Melbourne (MEL) 3
Qatar Airways QR 4253 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-05-07 through 2024-06-26
Codeshare flight, operated by Virgin Australia International.(VA 254)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4257 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-11
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4258 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-01-22
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4258 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-03
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4261 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-09
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4261 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-25
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4263 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-04
Codeshare flight, operated by Virgin Australia International.(VA 274)
Dim 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 4265 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-18
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6301 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-02
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6305 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-23
Codeshare flight, operated by Virgin Australia International.(VA 274)
Sam 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6306 Non-stop Boeing 737-800 (73H) 1:10 Valid until 2024-03-30
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 08:20 Canberra (CBR) 09:30 Melbourne (MEL) 3
Qatar Airways QR 6307 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-02-09 through 2024-02-16
Codeshare flight, operated by Virgin Australia International.(VA 256)
Lun,Ven 08:20 Canberra (CBR) 09:30 Melbourne (MEL) 3
Qatar Airways QR 6307 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-02-19 through 2024-03-15
Codeshare flight, operated by Virgin Australia International.(VA 256)
Ven 08:20 Canberra (CBR) 09:30 Melbourne (MEL) 3
Qatar Airways QR 6307 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-22
Codeshare flight, operated by Virgin Australia International.(VA 256)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6311 Non-stop Boeing 737-800 (73H) 1:10 Valid until 2024-01-15
Codeshare flight, operated by Virgin Australia International.(VA 274)
Lun 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6311 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-11
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6313 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-02-16
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6314 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-03-01 through 2024-03-08
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6322 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-15
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6325 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-22
Codeshare flight, operated by Virgin Australia International.(VA 274)
Sam 15:10 Canberra (CBR) 16:20 Melbourne (MEL) 3
Qatar Airways QR 6331 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-04-06
Codeshare flight, operated by Virgin Australia International.(VA 274)
Tous les jours 15:10 Canberra (CBR) 16:20 Melbourne (MEL) 3
Qatar Airways QR 6331 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-07-01 through 2024-10-26
Codeshare flight, operated by Virgin Australia International.(VA 274)
Mar-Jeu 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6331 Non-stop Boeing 737-800 (73H) 1:10 Valid until 2024-01-18
Codeshare flight, operated by Virgin Australia International.(VA 274)
Mar,Mer 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6331 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-01-24 through 2024-01-31
Codeshare flight, operated by Virgin Australia International.(VA 274)
Mar-Jeu 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6331 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-02-01 through 2024-03-28
Codeshare flight, operated by Virgin Australia International.(VA 274)
Tous les jours 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6331 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-04-07 through 2024-06-30
Codeshare flight, operated by Virgin Australia International.(VA 274)
Ven 15:15 Canberra (CBR) 16:25 Melbourne (MEL) 3
Qatar Airways QR 6336 Non-stop Boeing 737-800 (73H) 1:10 Operates only on 2024-03-29
Codeshare flight, operated by Virgin Australia International.(VA 274)
Mar 08:25 Canberra (CBR) 09:35 Melbourne (MEL) 3
Qatar Airways QR 6349 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-07-02 through 2024-10-22
Codeshare flight, operated by Virgin Australia International.(VA 256)
Jeu 08:20 Canberra (CBR) 09:30 Melbourne (MEL) 3
Qatar Airways QR 6364 Non-stop Boeing 737-800 (73H) 1:10 Effective from 2024-10-31
Codeshare flight, operated by Virgin Australia International.(VA 256)
Jeu 08:25 Canberra (CBR) 09:35 Melbourne (MEL) 3
Qatar Airways QR 6364 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-05-02 through 2024-10-24
Codeshare flight, operated by Virgin Australia International.(VA 256)
1 2   next


Qatar Airways vols de Canberra (CBR) à Melbourne (MEL).
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs en partage de code:

Operates only on 2024-03-10
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 254)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-03-18 through 2024-03-25
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-01
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 252)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-23
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-01-14 through 2024-01-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-01-29 through 2024-02-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-01-05 through 2024-01-12
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-19
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-04
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-02-19 through 2024-02-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-25
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-17
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-04-01 through 2024-04-04
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 254)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-04-08 through 2024-04-24
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 254)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-04-26 through 2024-05-01
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 254)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-05-07 through 2024-06-26
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 254)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-11
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-01-22
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-23
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Valid until 2024-03-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-02-09 through 2024-02-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 256)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-02-19 through 2024-03-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 256)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 256)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Valid until 2024-01-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-11
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-02-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-03-01 through 2024-03-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-04-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-07-01 through 2024-10-26
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Valid until 2024-01-18
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-01-24 through 2024-01-31
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-02-01 through 2024-03-28
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-04-07 through 2024-06-30
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Operates only on 2024-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 274)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-07-02 through 2024-10-22
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 256)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective from 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 256)
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Effective 2024-05-02 through 2024-10-24
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Codeshare flight, operated by Virgin Australia International. (VA 256)
Duration: 1:10, non-stop
Boeing 737-800 (73H)
Page 1 / 2        next
  • Il s'agit d'une ligne intérieure au départ de l'aéroport de Canberra (CBR) et à destination de l'aéroport de Melbourne (MEL).
  • La distance est de 469 km.
  • Le fuseau horaire de l'aéroport de départ et de l'aéroport d'arrivée est UTC+10 . Dans les deux aéroports, il est actuellement (loading...).
  • Pour les vols directs, le temps de vol est de 1:10.