Volaris vol Y4 1831: Fresno - Guadalajara

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Mar,Jeu,Sam 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:26 Valid until 2024-09-14
Lun 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A321neo (32Q) 3:26 Effective 2024-09-16 through 2024-09-30
Mar 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:26 Effective 2024-09-17 through 2024-09-24
Jeu,Sam 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320 (320) 3:26 Effective 2024-09-19 through 2024-09-26
Mar,Jeu,Sam 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:26 Effective 2024-09-28 through 2024-10-05
Lun,Mar,Jeu,Sam 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:26 Effective 2024-10-07 through 2024-11-02
Lun,Mar,Jeu,Sam 01:50 Fresno (FAT) 07:15 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:25 Effective 2024-11-04 through 2025-03-08
Dim 01:50 Fresno (FAT) 07:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:26 Operates only on 2025-03-09
Tous les jours 01:50 Fresno (FAT) 06:16 Guadalajara (GDL) 1
Y4 1831 Non-stop Airbus A320neo (32N) 3:26 Effective from 2025-03-10
Volaris vol Y4 1831:
Fresno - Guadalajara
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Volaris Y41831
Valid until 2024-09-14
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 3:26, non-stop
Airbus A320neo (32N)

Volaris Y41831
Effective 2024-09-16 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:26, non-stop
Airbus A321neo (32Q)

Volaris Y41831
Effective 2024-09-17 through 2024-09-24
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:26, non-stop
Airbus A320neo (32N)

Volaris Y41831
Effective 2024-09-19 through 2024-09-26
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 3:26, non-stop
Airbus A320 (320)

Volaris Y41831
Effective 2024-09-28 through 2024-10-05
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 3:26, non-stop
Airbus A320neo (32N)

Volaris Y41831
Effective 2024-10-07 through 2024-11-02
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 3:26, non-stop
Airbus A320neo (32N)

Volaris Y41831
Effective 2024-11-04 through 2025-03-08
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 3:25, non-stop
Airbus A320neo (32N)

Volaris Y41831
Operates only on 2025-03-09
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:26, non-stop
Airbus A320neo (32N)

Volaris Y41831
Effective from 2025-03-10
Lun
Mar
Mer
Jeu
Ven
Sam
Dim
Duration: 3:26, non-stop
Airbus A320neo (32N)
  • Y4 1831 est un vol international au départ de l'aéroport de Fresno, United States (FAT) et à destination de l'aéroport de Guadalajara, Mexico (GDL).
  • La distance est de 2405 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-8 , et le fuseau horaire de l'aéroport d'arrivée est UTC-6 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol varie entre 3:25 et 3:26.