VivaAerobus vol VB 7240: Guadalajara - Tulum via Felipe Angeles Intl., Mexico City

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Mer,Ven,Dim 06:15 Guadalajara (GDL) 1 07:30 Felipe Angeles Intl., Mexico City (NLU)
VB 7240 Non-stop Airbus A320 (320) 1:15 Effective 2024-01-08 through 2024-02-28
Lun,Mer 08:00 Felipe Angeles Intl., Mexico City (NLU) 11:15 Tulum (TQO)
VB 7240 Non-stop Airbus A320 (320) 2:15 Operates only on 2024-01-08
Lun,Mer,Ven,Dim 08:00 Felipe Angeles Intl., Mexico City (NLU) 11:10 Tulum (TQO)
VB 7240 Non-stop Airbus A320 (320) 2:10 Effective 2024-01-10 through 2024-01-31
Lun,Mer,Ven,Dim 08:00 Felipe Angeles Intl., Mexico City (NLU) 11:15 Tulum (TQO)
VB 7240 Non-stop Airbus A320 (320) 2:15 Effective 2024-02-02 through 2024-02-28
Vols indirects:
Lun,Mer 06:15 Guadalajara (GDL) 1 11:15 Tulum (TQO)
VB 7240 1-stop Airbus A320 (320) 4:00 Operates only on 2024-01-08
Lun,Mer,Ven,Dim 06:15 Guadalajara (GDL) 1 11:10 Tulum (TQO)
VB 7240 1-stop Airbus A320 (320) 3:55 Effective 2024-01-10 through 2024-01-31
Lun,Mer,Ven,Dim 06:15 Guadalajara (GDL) 1 11:15 Tulum (TQO)
VB 7240 1-stop Airbus A320 (320) 4:00 Effective 2024-02-02 through 2024-02-28
VivaAerobus vol VB 7240:
Guadalajara - Tulum via Felipe Angeles Intl., Mexico City
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

VivaAerobus VB7240
Effective 2024-01-08 through 2024-02-28
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Airbus A320 (320)

VivaAerobus VB7240
Operates only on 2024-01-08
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:15, non-stop
Airbus A320 (320)

VivaAerobus VB7240
Effective 2024-01-10 through 2024-01-31
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Airbus A320 (320)

VivaAerobus VB7240
Effective 2024-02-02 through 2024-02-28
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Airbus A320 (320)

Vols indirects:

VivaAerobus VB7240
Operates only on 2024-01-08
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:00, 1-stop
Airbus A320 (320)

VivaAerobus VB7240
Effective 2024-01-10 through 2024-01-31
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 3:55, 1-stop
Airbus A320 (320)

VivaAerobus VB7240
Effective 2024-02-02 through 2024-02-28
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 4:00, 1-stop
Airbus A320 (320)
  • VB 7240 est un vol intérieur au départ de l'aéroport de Guadalajara (GDL) et à destination de l'aéroport de Tulum (TQO).
  • Le vol s'effectue via Felipe Angeles Intl., Mexico City (NLU).
  • La distance est de 1630 km.
  • Le fuseau horaire de l'aéroport de départ est UTC-6 , et le fuseau horaire de l'aéroport d'arrivée est UTC-5 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.