HORAIRES DES VOLS |
---|
Vols directs en partage de code: |
Mar-Dim
18:59
Memphis (MEM)
21:24
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:25 Valid until 2024-01-05 Codeshare flight, operated by Delta Air Lines.(DL 1350) |
Lun,Mer-Ven
18:59
Memphis (MEM)
21:25
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:26 Effective 2024-01-08 through 2024-01-19 Codeshare flight, operated by Delta Air Lines.(DL 913) |
Lun,Mer-Ven,Dim
18:59
Memphis (MEM)
21:25
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:26 Effective 2024-01-21 through 2024-02-05 Codeshare flight, operated by Delta Air Lines.(DL 913) |
Lun,Mer-Ven
18:59
Memphis (MEM)
21:27
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:28 Effective 2024-02-07 through 2024-02-12 Codeshare flight, operated by Delta Air Lines.(DL 913) |
Lun,Mer-Ven
18:59
Memphis (MEM)
21:27
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:28 Effective 2024-02-15 through 2024-02-23 Codeshare flight, operated by Delta Air Lines.(DL 913) |
Lun,Mer-Ven,Dim
18:59
Memphis (MEM)
21:27
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:28 Effective 2024-02-25 through 2024-03-08 Codeshare flight, operated by Delta Air Lines.(DL 913) |
Lun,Mer-Ven,Dim
19:20
Memphis (MEM)
21:50
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:30 Effective 2024-03-10 through 2024-04-05 Codeshare flight, operated by Delta Air Lines.(DL 1350) |
Lun,Sam,Dim
19:20
Memphis (MEM)
21:50
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:30 Effective 2024-04-06 through 2024-04-08 Codeshare flight, operated by Delta Air Lines.(DL 1350) |
Lun-Sam
19:20
Memphis (MEM)
21:30
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:10 Effective 2024-04-09 through 2024-09-07 Codeshare flight, operated by Delta Air Lines.(DL 1350) |
Lun-Ven,Dim
19:20
Memphis (MEM)
21:40
Los Angeles (LAX) 3 VS 2229 Non-stop Boeing 737-800 (738) 4:20 Effective from 2024-09-09 Codeshare flight, operated by Delta Air Lines.(DL 2082) |