TAP vol TP 433: Orly, Paris - Lisbon

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Ven-Dim 12:35 Orly, Paris (ORY) 1 14:05 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective from 2024-10-27
Mar-Jeu 12:35 Orly, Paris (ORY) 1 14:05 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective from 2024-10-29
Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Operates only on 2024-03-31
Lun,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-04-01 through 2024-04-07
Mar-Jeu,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-04-02 through 2024-04-06
Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Operates only on 2024-04-05
Lun,Mer,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-04-08 through 2024-04-13
Mar 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Operates only on 2024-04-09
Mar,Jeu,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-04-11 through 2024-04-18
Lun 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Operates only on 2024-04-15
Mar,Mer 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-04-17 through 2024-04-23
Mer,Ven,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-04-19 through 2024-04-24
Lun,Jeu,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-04-21 through 2024-05-05
Mar,Mer,Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-04-26 through 2024-05-01
Ven,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-04-27 through 2024-05-04
Lun,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-05-06 through 2024-05-13
Mar,Mer 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-05-07 through 2024-05-21
Jeu,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-05-09 through 2024-05-16
Mer,Ven,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-05-17 through 2024-05-22
Lun,Jeu,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-05-19 through 2024-05-30
Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-05-25 through 2024-06-01
Mar,Mer,Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-05-28 through 2024-05-31
Mar,Jeu,Sam,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-06-02 through 2024-06-13
Lun 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-06-03 through 2024-06-10
Mer 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-06-05 through 2024-06-12
Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Operates only on 2024-06-07
Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Operates only on 2024-06-14
Lun,Mar,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-06-15 through 2024-06-22
Mer,Jeu,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-06-16 through 2024-06-23
Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321 (321) 2:30 Operates only on 2024-06-21
Lun,Mer,Jeu,Sam,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-06-24 through 2024-06-30
Lun,Mar,Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-06-25 through 2024-07-01
Mar 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Operates only on 2024-07-02
Lun-Mer,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-07-03 through 2024-07-09
Mer,Jeu 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-07-04 through 2024-07-17
Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-07-06 through 2024-07-13
Mar,Jeu,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-07-12 through 2024-07-21
Lun,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Effective 2024-07-15 through 2024-07-20
Lun,Jeu,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-07-22 through 2024-09-02
Mar 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Effective 2024-07-23 through 2024-07-30
Mer 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-07-24 through 2024-09-25
Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-07-26 through 2024-08-04
Mar,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-08-06 through 2024-09-03
Mar,Jeu,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-09-05 through 2024-09-10
Lun,Jeu,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-09-07 through 2024-09-30
Mar,Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-09-13 through 2024-09-29
Mar 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-10-01 through 2024-10-15
Mer,Jeu,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-10-02 through 2024-10-10
Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A319 (319) 2:30 Operates only on 2024-10-04
Lun,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Effective 2024-10-05 through 2024-10-14
Ven,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-10-11 through 2024-10-13
Mar,Mer,Ven,Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-10-16 through 2024-10-22
Jeu 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Operates only on 2024-10-17
Lun,Mer,Dim 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-10-20 through 2024-10-23
Jeu,Ven 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-10-24 through 2024-10-25
Sam 14:40 Orly, Paris (ORY) 1 16:10 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Operates only on 2024-10-26
Dim 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Valid until 2024-01-07
Lun,Mar 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Valid until 2024-01-02
Mar,Mer 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-01-03 through 2024-01-09
Lun,Mer,Jeu,Sam 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-01-04 through 2024-01-13
Mar 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321 (321) 2:30 Effective 2024-01-16 through 2024-02-06
Mer,Sam 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-01-17 through 2024-02-03
Jeu 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-01-18 through 2024-02-08
Dim 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Operates only on 2024-01-21
Lun,Mer,Sam 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-02-05 through 2024-02-10
Mar,Jeu 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320neo (32N) 2:30 Effective 2024-02-13 through 2024-03-28
Lun,Mer,Sam 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-02-14 through 2024-02-24
Dim 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A320 (320) 2:30 Operates only on 2024-02-18
Lun,Mer,Sam,Dim 15:20 Orly, Paris (ORY) 1 16:50 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Effective 2024-02-25 through 2024-03-30
Ven 15:30 Orly, Paris (ORY) 1 17:00 Lisbon (LIS) 1
TP 433 Non-stop Airbus A321neo (32Q) 2:30 Valid until 2024-03-29
TAP vol TP 433:
Orly, Paris - Lisbon
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

TAP TP433
Effective from 2024-10-27
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective from 2024-10-29
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Operates only on 2024-03-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-04-01 through 2024-04-07
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-04-02 through 2024-04-06
Lun
-
Mar
Mer
Jeu
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Operates only on 2024-04-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Effective 2024-04-08 through 2024-04-13
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Operates only on 2024-04-09
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-04-11 through 2024-04-18
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Operates only on 2024-04-15
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Effective 2024-04-17 through 2024-04-23
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-04-19 through 2024-04-24
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-04-21 through 2024-05-05
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-04-26 through 2024-05-01
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-04-27 through 2024-05-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-05-06 through 2024-05-13
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-05-07 through 2024-05-21
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-05-09 through 2024-05-16
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-05-17 through 2024-05-22
Lun
-
Mar
-
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-05-19 through 2024-05-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-05-25 through 2024-06-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-05-28 through 2024-05-31
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-06-02 through 2024-06-13
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-06-03 through 2024-06-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-06-05 through 2024-06-12
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Operates only on 2024-06-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Operates only on 2024-06-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-06-15 through 2024-06-22
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-06-16 through 2024-06-23
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Operates only on 2024-06-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A321 (321)

TAP TP433
Effective 2024-06-24 through 2024-06-30
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-06-25 through 2024-07-01
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Operates only on 2024-07-02
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Effective 2024-07-03 through 2024-07-09
Lun
Mar
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-07-04 through 2024-07-17
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-07-06 through 2024-07-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-07-12 through 2024-07-21
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-07-15 through 2024-07-20
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Effective 2024-07-22 through 2024-09-02
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-07-23 through 2024-07-30
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Effective 2024-07-24 through 2024-09-25
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-07-26 through 2024-08-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-08-06 through 2024-09-03
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-09-05 through 2024-09-10
Lun
-
Mar
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-09-07 through 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-09-13 through 2024-09-29
Lun
-
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-10-01 through 2024-10-15
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-10-02 through 2024-10-10
Lun
-
Mar
-
Mer
Jeu
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Operates only on 2024-10-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A319 (319)

TAP TP433
Effective 2024-10-05 through 2024-10-14
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-10-11 through 2024-10-13
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-10-16 through 2024-10-22
Lun
-
Mar
Mer
Jeu
-
Ven
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Operates only on 2024-10-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-10-20 through 2024-10-23
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-10-24 through 2024-10-25
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Operates only on 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Valid until 2024-01-07
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Valid until 2024-01-02
Lun
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-01-03 through 2024-01-09
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-01-04 through 2024-01-13
Lun
Mar
-
Mer
Jeu
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-01-16 through 2024-02-06
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A321 (321)

TAP TP433
Effective 2024-01-17 through 2024-02-03
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-01-18 through 2024-02-08
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Operates only on 2024-01-21
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-02-05 through 2024-02-10
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Effective 2024-02-13 through 2024-03-28
Lun
-
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A320neo (32N)

TAP TP433
Effective 2024-02-14 through 2024-02-24
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Operates only on 2024-02-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Airbus A320 (320)

TAP TP433
Effective 2024-02-25 through 2024-03-30
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
Dim
Duration: 2:30, non-stop
Airbus A321neo (32Q)

TAP TP433
Valid until 2024-03-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Airbus A321neo (32Q)
  • TP 433 est un vol international au départ de l'aéroport de Orly, Paris, France (ORY) et à destination de l'aéroport de Lisbon, Portugal (LIS).
  • La distance est de 1436 km.
  • Le fuseau horaire de l'aéroport de départ est UTC+1 , et le fuseau horaire de l'aéroport d'arrivée est UTC+0 . Il est actuellement (loading...) au point de départ et (loading...) au point d'arrivée. Il y a un décalage horaire de (loading...) heure(s) entre les aéroports.
  • Pour les vols directs, le temps de vol est de 2:30.