Southwest Airlines vol WN 595: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven 06:00 Sacramento (SMF) B 07:30 San Diego (SAN) 1
WN 595 Non-stop Boeing 737-700 (73W) 1:30 Valid until 2024-09-30
Jeu 08:00 Midway, Chicago (MDW) 09:40 Colorado Springs (COS)
WN 595 Non-stop Boeing 737-800 (73H) 2:40 Operates only on 2024-11-28
Sam 08:00 Midway, Chicago (MDW) 09:45 Colorado Springs (COS)
WN 595 Non-stop Boeing 737-800 (73H) 2:45 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven,Dim 08:30 Midway, Chicago (MDW) 10:15 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 08:30 Midway, Chicago (MDW) 10:15 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:45 Effective 2025-02-21 through 2025-03-02
Sam 08:40 Midway, Chicago (MDW) 10:20 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-11-09 through 2024-11-16
Sam 08:40 Midway, Chicago (MDW) 10:20 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-12-07 through 2024-12-14
Dim 09:45 Love Field, Dallas (DAL) 1 11:25 Nashville (BNA)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Operates only on 2024-12-01
Jeu,Ven,Dim 10:30 Midway, Chicago (MDW) 12:10 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 10:30 Midway, Chicago (MDW) 12:10 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-11-11 through 2024-11-25
Ven,Dim 10:30 Midway, Chicago (MDW) 12:10 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Effective 2024-12-08 through 2024-12-15
Jeu 10:30 Midway, Chicago (MDW) 12:10 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2024-12-19
Ven 10:30 Midway, Chicago (MDW) 12:10 Colorado Springs (COS)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:40 Operates only on 2025-01-03
Mar,Mer 11:50 Love Field, Dallas (DAL) 1 12:50 Denver (DEN)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Valid until 2024-10-01
Mer 12:00 Love Field, Dallas (DAL) 1 13:00 Denver (DEN)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Operates only on 2024-10-02
Dim 12:15 Nashville (BNA) 15:00 Baltimore (BWI)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2024-12-01
Dim 12:55 Austin (AUS) 17:00 Baltimore (BWI)
WN 595 Non-stop Boeing 737-700 (73W) 3:05 Effective 2024-10-06 through 2024-10-27
Lun-Mer 13:00 Saint Louis (STL) 2 15:25 Phoenix Sky Harbor (PHX) 4
WN 595 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 13:00 Saint Louis (STL) 2 15:25 Phoenix Sky Harbor (PHX) 4
WN 595 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-11-12 through 2024-11-20
Mar-Ven 13:00 Saint Louis (STL) 2 15:25 Phoenix Sky Harbor (PHX) 4
WN 595 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 13:00 Saint Louis (STL) 2 15:25 Phoenix Sky Harbor (PHX) 4
WN 595 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-12-09 through 2024-12-18
Mar,Mer 13:00 Saint Louis (STL) 2 15:25 Phoenix Sky Harbor (PHX) 4
WN 595 Non-stop Boeing 737-700 (73W) 3:25 Effective 2024-12-24 through 2025-01-01
Lun 13:00 Saint Louis (STL) 2 15:25 Phoenix Sky Harbor (PHX) 4
WN 595 Non-stop Boeing 737-700 (73W) 3:25 Operates only on 2025-01-06
Lun-Ven 13:05 Salt Lake City (SLC) 19:10 Baltimore (BWI)
WN 595 Non-stop Boeing 737-800 (73H) 4:05 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 13:05 Salt Lake City (SLC) 19:10 Baltimore (BWI)
WN 595 Non-stop Boeing 737-800 (73H) 4:05 Effective 2025-01-19 through 2025-01-24
Lun-Ven 13:05 Salt Lake City (SLC) 19:10 Baltimore (BWI)
WN 595 Non-stop Boeing 737-800 (73H) 4:05 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 13:05 Salt Lake City (SLC) 19:10 Baltimore (BWI)
WN 595 Non-stop Boeing 737-800 (73H) 4:05 Effective 2025-02-09 through 2025-02-12
Mar,Mer 13:05 Salt Lake City (SLC) 19:10 Baltimore (BWI)
WN 595 Non-stop Boeing 737-800 (73H) 4:05 Effective 2025-02-19 through 2025-03-05
Sam 13:50 Midway, Chicago (MDW) 15:25 Colorado Springs (COS)
WN 595 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-11-23 through 2024-11-30
Sam 13:50 Midway, Chicago (MDW) 15:25 Colorado Springs (COS)
WN 595 Non-stop Boeing 737-800 (73H) 2:35 Effective 2024-12-21 through 2025-01-04
Sam 15:25 Austin (AUS) 19:30 Baltimore (BWI)
WN 595 Non-stop Boeing 737 MAX 8 (7M8) 3:05 Effective 2024-10-05 through 2024-11-02
Mar,Mer 15:40 Austin (AUS) 19:45 Baltimore (BWI)
WN 595 Non-stop Boeing 737-800 (73H) 3:05 Effective 2024-10-08 through 2024-10-30
Jeu 15:55 Austin (AUS) 20:00 Baltimore (BWI)
WN 595 Non-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-10-31
Lun,Jeu,Ven 16:20 Austin (AUS) 20:25 Baltimore (BWI)
WN 595 Non-stop Boeing 737-700 (73W) 3:05 Effective 2024-10-03 through 2024-10-28
Ven 16:20 Austin (AUS) 20:25 Baltimore (BWI)
WN 595 Non-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-11-01
Sam 16:40 Sacramento (SMF) B 18:10 San Diego (SAN) 1
WN 595 Non-stop Boeing 737-700 (73W) 1:30 Valid until 2024-09-28
Jeu,Ven,Dim 19:55 Love Field, Dallas (DAL) 1 23:20 Orlando (MCO)
WN 595 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-12 through 2025-01-17
Lun,Dim 19:55 Love Field, Dallas (DAL) 1 23:20 Orlando (MCO)
WN 595 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 19:55 Love Field, Dallas (DAL) 1 23:20 Orlando (MCO)
WN 595 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-02-02 through 2025-02-07
Lun 19:55 Love Field, Dallas (DAL) 1 23:20 Orlando (MCO)
WN 595 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2025-02-10
Lun,Mar,Jeu 19:55 Love Field, Dallas (DAL) 1 23:20 Orlando (MCO)
WN 595 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-02-18 through 2025-02-24
Lun 19:55 Love Field, Dallas (DAL) 1 23:20 Orlando (MCO)
WN 595 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2025-03-03
Lun-Mer 20:10 Nashville (BNA) 22:15 Love Field, Dallas (DAL) 1
WN 595 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 20:10 Nashville (BNA) 22:15 Love Field, Dallas (DAL) 1
WN 595 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-12-20 through 2025-01-02
Dim 20:10 Nashville (BNA) 22:15 Love Field, Dallas (DAL) 1
WN 595 Non-stop Boeing 737-800 (73H) 2:05 Operates only on 2025-01-05
Jeu 21:05 Baltimore (BWI) 22:30 Manchester (MHT)
WN 595 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-10-03
Lun,Jeu,Ven 21:10 Baltimore (BWI) 22:35 Manchester (MHT)
WN 595 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-04 through 2024-10-28
Ven 21:10 Baltimore (BWI) 22:35 Manchester (MHT)
WN 595 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-11-01
Vols indirects:
Dim 09:45 Love Field, Dallas (DAL) 1 15:00 Baltimore (BWI)
WN 595 1-stop Boeing 737 MAX 8 (7M8) 4:15 Operates only on 2024-12-01
Jeu 16:20 Austin (AUS) 22:30 Manchester (MHT)
WN 595 1-stop Boeing 737-700 (73W) 5:10 Operates only on 2024-10-03
Lun,Jeu,Ven 16:20 Austin (AUS) 22:35 Manchester (MHT)
WN 595 1-stop Boeing 737-700 (73W) 5:15 Effective 2024-10-04 through 2024-10-28
Ven 16:20 Austin (AUS) 22:35 Manchester (MHT)
WN 595 1-stop Boeing 737-700 (73W) 5:15 Operates only on 2024-11-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 595: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN595
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:45, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Valid until 2024-10-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Operates only on 2024-10-02
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 4:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 4:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 4:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN595
Operates only on 2024-10-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-10-04 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN595
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:15, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN595
Operates only on 2024-10-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 5:10, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Effective 2024-10-04 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 5:15, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN595
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 5:15, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Austin (AUS) - Baltimore (BWI)
  • Austin (AUS) - Manchester (MHT)
  • Baltimore (BWI) - Manchester (MHT)
  • Love Field, Dallas (DAL) - Baltimore (BWI)
  • Love Field, Dallas (DAL) - Denver (DEN)
  • Love Field, Dallas (DAL) - Nashville (BNA)
  • Love Field, Dallas (DAL) - Orlando (MCO)
  • Midway, Chicago (MDW) - Colorado Springs (COS)
  • Nashville (BNA) - Baltimore (BWI)
  • Sacramento (SMF) - San Diego (SAN)
  • Saint Louis (STL) - Phoenix Sky Harbor (PHX)
  • Salt Lake City (SLC) - Baltimore (BWI)