Southwest Airlines vol WN 5008: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu,Ven,Dim 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-01-12 through 2025-01-17
Lun,Dim 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-02-02 through 2025-02-07
Lun 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2025-02-10
Lun,Mar,Jeu 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2025-02-18 through 2025-02-24
Lun 05:30 Las Vegas Harry Reid (LAS) 1 08:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2025-03-03
Lun,Jeu,Ven,Dim 10:20 Las Vegas Harry Reid (LAS) 1 13:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 10:20 Las Vegas Harry Reid (LAS) 1 13:15 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-21 through 2025-03-02
Lun-Ven 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-19 through 2025-01-24
Lun-Ven 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-09 through 2025-02-12
Mar,Mer 10:45 Las Vegas Harry Reid (LAS) 1 13:40 Denver (DEN)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-19 through 2025-03-05
Sam 11:20 Las Vegas Harry Reid (LAS) 1 14:15 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2025-02-15 through 2025-03-01
Lun-Mer 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-04 through 2024-11-06
Mar,Mer 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-12 through 2024-11-20
Mar-Ven 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-09 through 2024-12-18
Mar,Mer 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-24 through 2025-01-01
Lun 11:25 Las Vegas Harry Reid (LAS) 1 14:20 Denver (DEN)
WN 5008 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2025-01-06
Jeu,Ven,Dim 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-11 through 2024-11-25
Ven,Dim 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-12-08 through 2024-12-15
Jeu 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-12-19
Ven 11:30 Las Vegas Harry Reid (LAS) 1 14:25 Denver (DEN)
WN 5008 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2025-01-03
Dim 13:05 Norfolk (ORF) 15:15 Orlando (MCO)
WN 5008 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-12-01
Dim 14:10 Love Field, Dallas (DAL) 1 15:55 Destin/Fort Walton Beach (VPS)
WN 5008 Non-stop Boeing 737-700 (73W) 1:45 Effective 2024-10-06 through 2024-10-20
Dim 14:10 Love Field, Dallas (DAL) 1 15:55 Destin/Fort Walton Beach (VPS)
WN 5008 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2024-10-27
Sam 14:55 Denver (DEN) 19:15 Grand Rapids (GRR)
WN 5008 Non-stop Boeing 737-700 (73W) 2:20 Effective 2025-02-15 through 2025-03-01
Dim 16:00 Orlando (MCO) 16:40 Birmingham (BHM)
WN 5008 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2024-12-01
Vols indirects:
Sam 11:20 Las Vegas Harry Reid (LAS) 1 19:15 Grand Rapids (GRR)
WN 5008 1-stop Boeing 737-700 (73W) 4:55 Effective 2025-02-15 through 2025-03-01
Dim 13:05 Norfolk (ORF) 16:40 Birmingham (BHM)
WN 5008 1-stop Boeing 737-800 (73H) 4:35 Operates only on 2024-12-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 5008: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN5008
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN5008
Effective 2024-10-06 through 2024-10-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN5008
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Vols indirects:

Southwest Airlines WN5008
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN5008
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:35, 1-stop
Boeing 737-800 (73H)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Grand Rapids (GRR)
  • Las Vegas Harry Reid (LAS) - Denver (DEN)
  • Las Vegas Harry Reid (LAS) - Grand Rapids (GRR)
  • Love Field, Dallas (DAL) - Destin/Fort Walton Beach (VPS)
  • Norfolk (ORF) - Birmingham (BHM)
  • Norfolk (ORF) - Orlando (MCO)
  • Orlando (MCO) - Birmingham (BHM)