Southwest Airlines vol WN 4810: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu,Ven,Dim 05:20 San Antonio (SAT) A 08:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 05:20 San Antonio (SAT) A 08:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-11-11 through 2024-11-25
Ven,Dim 05:20 San Antonio (SAT) A 08:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Effective 2024-12-08 through 2024-12-15
Jeu 05:20 San Antonio (SAT) A 08:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-12-19
Ven 05:20 San Antonio (SAT) A 08:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2025-01-03
Lun,Jeu,Ven,Dim 05:45 San Antonio (SAT) A 09:15 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 05:45 San Antonio (SAT) A 09:15 Orlando (MCO)
WN 4810 Non-stop Boeing 737-800 (73H) 2:30 Effective 2025-02-21 through 2025-03-02
Jeu,Ven,Dim 05:50 San Antonio (SAT) A 09:20 Orlando (MCO)
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-12 through 2025-01-17
Lun,Dim 05:50 San Antonio (SAT) A 09:20 Orlando (MCO)
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 05:50 San Antonio (SAT) A 09:20 Orlando (MCO)
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-02 through 2025-02-07
Lun 05:50 San Antonio (SAT) A 09:20 Orlando (MCO)
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2025-02-10
Lun,Mar,Jeu 05:50 San Antonio (SAT) A 09:20 Orlando (MCO)
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Effective 2025-02-18 through 2025-02-24
Lun 05:50 San Antonio (SAT) A 09:20 Orlando (MCO)
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 2:30 Operates only on 2025-03-03
Sam 06:20 San Antonio (SAT) A 09:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-11-09 through 2024-11-16
Sam 06:20 San Antonio (SAT) A 09:50 Orlando (MCO)
WN 4810 Non-stop Boeing 737-700 (73W) 2:30 Effective 2024-12-07 through 2024-12-14
Jeu 06:40 San Antonio (SAT) A 10:10 Orlando (MCO)
WN 4810 Non-stop Boeing 737-700 (73W) 2:30 Operates only on 2024-11-28
Lun,Jeu,Ven 08:05 Grand Rapids (GRR) 08:55 Denver (DEN)
WN 4810 Non-stop Boeing 737-700 (73W) 2:50 Effective 2024-10-03 through 2024-10-28
Ven 08:05 Grand Rapids (GRR) 08:55 Denver (DEN)
WN 4810 Non-stop Boeing 737-700 (73W) 2:50 Operates only on 2024-11-01
Dim 20:55 Pittsburgh (PIT) 21:35 Saint Louis (STL) 2
WN 4810 Non-stop Boeing 737-700 (73W) 1:40 Operates only on 2024-09-29
Dim 21:00 Pittsburgh (PIT) 21:45 Saint Louis (STL) 2
WN 4810 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Effective 2024-09-08 through 2024-09-22
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4810: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4810
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4810
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4810
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4810
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4810
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4810
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4810
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4810
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4810
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4810
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4810
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4810
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4810
Operates only on 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4810
Effective 2024-09-08 through 2024-09-22
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Grand Rapids (GRR) - Denver (DEN)
  • Pittsburgh (PIT) - Saint Louis (STL)
  • San Antonio (SAT) - Orlando (MCO)