Southwest Airlines vol WN 4285: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 09:00 San Jose (SJC) B 10:25 San Diego (SAN) 1
WN 4285 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-05 through 2024-11-02
Sam 11:05 San Diego (SAN) 1 12:30 Tucson (TUS)
WN 4285 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-05 through 2024-11-02
Sam 13:05 Tucson (TUS) 16:00 Denver (DEN)
WN 4285 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-05 through 2024-11-02
Dim 13:40 Tucson (TUS) 16:35 Denver (DEN)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-10-06 through 2024-10-27
Lun-Mer 13:40 Boston Logan (BOS) B 15:30 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 13:40 Boston Logan (BOS) B 15:30 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Effective 2024-12-20 through 2025-01-02
Dim 13:40 Boston Logan (BOS) B 15:30 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:50 Operates only on 2025-01-05
Lun,Jeu,Ven 14:55 San Diego (SAN) 1 16:15 Tucson (TUS)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-10-03 through 2024-10-28
Ven 14:55 San Diego (SAN) 1 16:15 Tucson (TUS)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2024-11-01
Mar,Mer 15:20 Tucson (TUS) 18:10 Denver (DEN)
WN 4285 Non-stop Boeing 737-700 (73W) 1:50 Effective 2024-10-08 through 2024-10-30
Lun,Jeu,Ven 17:05 Tucson (TUS) 20:00 Denver (DEN)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-10-03 through 2024-10-28
Ven 17:05 Tucson (TUS) 20:00 Denver (DEN)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2024-11-01
Jeu,Ven,Dim 19:45 Boston Logan (BOS) B 21:40 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 19:45 Boston Logan (BOS) B 21:40 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-11-11 through 2024-11-25
Ven,Dim 19:45 Boston Logan (BOS) B 21:40 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-12-08 through 2024-12-15
Jeu 19:45 Boston Logan (BOS) B 21:40 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Operates only on 2024-12-19
Ven 19:45 Boston Logan (BOS) B 21:40 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Operates only on 2025-01-03
Sam 19:55 Boston Logan (BOS) B 21:50 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-11-23 through 2024-11-30
Sam 19:55 Boston Logan (BOS) B 21:50 Nashville (BNA)
WN 4285 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-12-21 through 2025-01-04
Dim 20:05 Boston Logan (BOS) B 22:00 Nashville (BNA)
WN 4285 Non-stop Boeing 737-700 (73W) 2:55 Operates only on 2024-12-01
Dim 22:45 Nashville (BNA) 01:30 Los Angeles (LAX) 1
WN 4285 Non-stop Boeing 737-700 (73W) 4:45 Operates only on 2024-12-01
The flight arrives 1 day after departure.
Vols indirects:
Sam 09:00 San Jose (SJC) B 12:30 Tucson (TUS)
WN 4285 1-stop Boeing 737-700 (73W) 3:30 Effective 2024-10-05 through 2024-11-02
Sam 11:05 San Diego (SAN) 1 16:00 Denver (DEN)
WN 4285 1-stop Boeing 737-700 (73W) 3:55 Effective 2024-10-05 through 2024-11-02
Lun,Jeu,Ven 14:55 San Diego (SAN) 1 20:00 Denver (DEN)
WN 4285 1-stop Boeing 737 MAX 8 (7M8) 4:05 Effective 2024-10-03 through 2024-10-28
Ven 14:55 San Diego (SAN) 1 20:00 Denver (DEN)
WN 4285 1-stop Boeing 737 MAX 8 (7M8) 4:05 Operates only on 2024-11-01
Dim 20:05 Boston Logan (BOS) B 01:30 Los Angeles (LAX) 1
WN 4285 1-stop Boeing 737-700 (73W) 8:25 Operates only on 2024-12-01
The flight arrives 1 day after departure.
Sam 09:00 San Jose (SJC) B 16:00 Denver (DEN)
WN 4285 2-stop Boeing 737-700 (73W) 6:00 Effective 2024-10-05 through 2024-11-02
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4285: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4285
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:45, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Vols indirects:

Southwest Airlines WN4285
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN4285
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:05, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 4:05, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4285
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 8:25, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN4285
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:00, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Boston Logan (BOS) - Los Angeles (LAX)
  • Boston Logan (BOS) - Nashville (BNA)
  • Nashville (BNA) - Los Angeles (LAX)
  • San Diego (SAN) - Denver (DEN)
  • San Diego (SAN) - Tucson (TUS)
  • San Jose (SJC) - Denver (DEN)
  • San Jose (SJC) - San Diego (SAN)
  • San Jose (SJC) - Tucson (TUS)
  • Tucson (TUS) - Denver (DEN)