Southwest Airlines vol WN 4213: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Mer 09:00 Minneapolis/Saint Paul (MSP) 2 10:40 Midway, Chicago (MDW)
WN 4213 Non-stop Boeing 737-700 (73W) 1:40 Operates only on 2024-09-18
Sam 16:30 Miami (MIA) 17:50 Nashville (BNA)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-10-05 through 2024-11-02
Jeu 17:25 Miami (MIA) 18:50 Nashville (BNA)
WN 4213 Non-stop Boeing 737-700 (73W) 2:25 Operates only on 2024-10-31
Sam 17:30 Sacramento (SMF) B 18:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-15 through 2025-03-01
Sam 17:45 Sacramento (SMF) B 19:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-09 through 2024-11-16
Sam 17:45 Sacramento (SMF) B 19:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-07 through 2024-12-14
Sam 18:25 Sacramento (SMF) B 19:50 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-11 through 2025-02-08
Jeu,Ven,Dim 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-11 through 2024-11-25
Ven,Dim 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-08 through 2024-12-15
Jeu 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-12-19
Ven 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-01-03
Lun,Jeu,Ven,Dim 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 19:15 Sacramento (SMF) B 20:40 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-21 through 2025-03-02
Dim 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-12-01
Jeu,Ven,Dim 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-12 through 2025-01-17
Lun,Dim 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-02 through 2025-02-07
Lun 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-02-10
Sam 19:30 Long Beach (LGB) 20:40 Las Vegas Harry Reid (LAS) 1
WN 4213 Non-stop Boeing 737-700 (73W) 1:10 Effective 2025-02-15 through 2025-03-01
Lun,Mar,Jeu 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 19:30 Sacramento (SMF) B 20:55 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-03-03
Lun-Ven 19:40 Sacramento (SMF) B 21:05 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 19:40 Sacramento (SMF) B 21:05 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-19 through 2025-01-24
Lun-Ven 19:40 Sacramento (SMF) B 21:05 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 19:40 Sacramento (SMF) B 21:05 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-09 through 2025-02-12
Mar,Mer 19:40 Sacramento (SMF) B 21:05 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-19 through 2025-03-05
Lun-Mer 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-12 through 2024-11-20
Sam 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-23 through 2024-11-30
Lun-Mer 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-26 through 2024-12-02
Mar-Ven 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-09 through 2024-12-18
Lun,Jeu,Ven,Dim 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-20 through 2025-01-02
Sam 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-21 through 2025-01-04
Mar,Mer 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-24 through 2025-01-01
Dim 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-01-05
Lun 19:45 Sacramento (SMF) B 21:10 Long Beach (LGB)
WN 4213 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-01-06
Lun,Jeu,Ven 21:25 Atlanta (ATL) N 23:15 Baltimore (BWI)
WN 4213 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Valid until 2024-09-30
Vols indirects:
Sam 17:30 Sacramento (SMF) B 20:40 Las Vegas Harry Reid (LAS) 1
WN 4213 1-stop Boeing 737-700 (73W) 3:10 Effective 2025-02-15 through 2025-03-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 4213: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN4213
Operates only on 2024-09-18
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4213
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4213
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4213
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4213
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4213
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN4213
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN4213
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN4213
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Southwest Airlines WN4213
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:10, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Atlanta (ATL) - Baltimore (BWI)
  • Long Beach (LGB) - Las Vegas Harry Reid (LAS)
  • Miami (MIA) - Nashville (BNA)
  • Minneapolis/Saint Paul (MSP) - Midway, Chicago (MDW)
  • Sacramento (SMF) - Las Vegas Harry Reid (LAS)
  • Sacramento (SMF) - Long Beach (LGB)