Southwest Airlines vol WN 3823: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun-Mer 06:40 San Diego (SAN) 1 08:05 Las Vegas Harry Reid (LAS) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 06:40 San Diego (SAN) 1 08:05 Las Vegas Harry Reid (LAS) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-20 through 2025-01-02
Dim 06:40 San Diego (SAN) 1 08:05 Las Vegas Harry Reid (LAS) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-01-05
Dim 09:15 Nashville (BNA) 11:25 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 4:10 Operates only on 2024-09-01
Lun,Jeu,Ven 10:55 Albuquerque (ABQ) 12:00 Long Beach (LGB)
WN 3823 Non-stop Boeing 737-800 (73H) 2:05 Valid until 2024-09-30
Dim 11:20 Montrose (MTJ) 12:15 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Effective 2024-10-06 through 2024-10-27
Mar,Mer 11:40 Montrose (MTJ) 12:35 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Effective 2024-10-08 through 2024-10-30
Lun,Jeu,Ven 12:20 Montrose (MTJ) 13:15 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Effective 2024-10-03 through 2024-10-28
Ven 12:20 Montrose (MTJ) 13:15 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 0:55 Operates only on 2024-11-01
Jeu 12:45 San Jose (SJC) B 14:10 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2024-11-28
Dim 13:50 Albuquerque (ABQ) 14:50 Long Beach (LGB)
WN 3823 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-09-08 through 2024-09-29
Jeu 14:05 Montrose (MTJ) 15:05 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 1:00 Operates only on 2024-10-31
Sam 14:25 Montrose (MTJ) 15:25 Denver (DEN)
WN 3823 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-10-05 through 2024-11-02
Dim 15:25 Long Beach (LGB) 16:35 San Jose (SJC) B
WN 3823 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-09-08 through 2024-09-29
Sam 17:05 San Jose (SJC) B 18:30 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-15 through 2025-03-01
Sam 17:15 San Jose (SJC) B 18:40 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-09 through 2024-11-16
Sam 17:15 San Jose (SJC) B 18:40 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-07 through 2024-12-14
Lun-Ven 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-19 through 2025-01-24
Lun-Ven 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-01-27 through 2025-02-05
Mar-Ven,Dim 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-09 through 2025-02-16
Lun,Mer,Ven,Dim 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-17 through 2025-02-23
Mar-Ven,Dim 18:00 San Jose (SJC) B 19:20 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:20 Effective 2025-02-25 through 2025-03-05
Sam 18:20 San Jose (SJC) B 19:40 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-800 (73H) 1:20 Effective 2025-01-11 through 2025-02-08
Lun,Mer 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-12 through 2024-11-20
Mar-Ven 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-09 through 2024-12-18
Mar,Mer 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-24 through 2025-01-01
Lun,Dim 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-06 through 2025-01-12
Lun,Jeu,Ven 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-16 through 2025-01-20
Dim 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-26 through 2025-02-02
Lun,Jeu,Ven 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-06 through 2025-02-10
Lun,Mar,Jeu 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 18:30 San Jose (SJC) B 19:55 San Diego (SAN) 1
WN 3823 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2025-03-03
Sam 19:20 San Diego (SAN) 1 22:20 Salt Lake City (SLC)
WN 3823 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven,Dim 19:55 San Diego (SAN) 1 00:30 San Antonio (SAT) A
WN 3823 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-13 through 2025-02-17
The flight arrives 1 day after departure.
Jeu,Ven,Dim 19:55 San Diego (SAN) 1 00:30 San Antonio (SAT) A
WN 3823 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-21 through 2025-03-02
The flight arrives 1 day after departure.
Vols indirects:
Dim 13:50 Albuquerque (ABQ) 16:35 San Jose (SJC) B
WN 3823 1-stop Boeing 737-700 (73W) 3:45 Effective 2024-09-08 through 2024-09-29
Sam 17:05 San Jose (SJC) B 22:20 Salt Lake City (SLC)
WN 3823 1-stop Boeing 737 MAX 8 (7M8) 4:15 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven,Dim 18:00 San Jose (SJC) B 00:30 San Antonio (SAT) A
WN 3823 1-stop Boeing 737-700 (73W) 4:30 Effective 2025-02-13 through 2025-02-17
The flight arrives 1 day after departure.
Jeu,Ven,Dim 18:00 San Jose (SJC) B 00:30 San Antonio (SAT) A
WN 3823 1-stop Boeing 737-700 (73W) 4:30 Effective 2025-02-21 through 2025-03-02
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 3823: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN3823
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 0:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-09 through 2025-02-16
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-17 through 2025-02-23
Lun
Mar
-
Mer
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-25 through 2025-03-05
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:20, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3823
Effective 2024-11-04 through 2024-11-06
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-06 through 2025-01-12
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-16 through 2025-01-20
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-01-26 through 2025-02-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-06 through 2025-02-10
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
19:55

00:30(+1)
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3823
19:55

00:30(+1)
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:35, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Vols indirects:

Southwest Airlines WN3823
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3823
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:15, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3823
18:00

00:30(+1)
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:30, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN3823
18:00

00:30(+1)
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:30, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Albuquerque (ABQ) - Long Beach (LGB)
  • Albuquerque (ABQ) - San Jose (SJC)
  • Long Beach (LGB) - San Jose (SJC)
  • Montrose (MTJ) - Denver (DEN)
  • Nashville (BNA) - San Diego (SAN)
  • San Diego (SAN) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Salt Lake City (SLC)
  • San Diego (SAN) - San Antonio (SAT)
  • San Jose (SJC) - Salt Lake City (SLC)
  • San Jose (SJC) - San Antonio (SAT)
  • San Jose (SJC) - San Diego (SAN)