Southwest Airlines vol WN 3726: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 06:45 Minneapolis/Saint Paul (MSP) 2 09:20 Love Field, Dallas (DAL) 1
WN 3726 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-11-23 through 2024-11-30
Sam 06:45 Minneapolis/Saint Paul (MSP) 2 09:20 Love Field, Dallas (DAL) 1
WN 3726 Non-stop Boeing 737 MAX 8 (7M8) 2:35 Effective 2024-12-21 through 2025-01-04
Mar,Mer 09:00 Austin (AUS) 09:55 San Diego (SAN) 1
WN 3726 Non-stop Boeing 737-700 (73W) 2:55 Valid until 2024-10-02
Sam 09:25 Albuquerque (ABQ) 10:15 San Diego (SAN) 1
WN 3726 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2024-09-28
Jeu 09:35 Tampa (TPA) 11:05 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-800 (73H) 2:30 Operates only on 2024-10-31
Lun,Jeu,Ven 10:00 San Diego (SAN) 1 11:25 San Jose (SJC) B
WN 3726 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2024-09-30
Mar,Mer 10:30 San Diego (SAN) 1 11:55 San Jose (SJC) B
WN 3726 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2024-10-02
Sam 10:50 San Diego (SAN) 1 12:15 San Jose (SJC) B
WN 3726 Non-stop Boeing 737-700 (73W) 1:25 Valid until 2024-09-28
Dim 11:45 San Diego (SAN) 1 13:15 San Jose (SJC) B
WN 3726 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-09-01
Dim 13:25 San Diego (SAN) 1 14:50 San Jose (SJC) B
WN 3726 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-09-08 through 2024-09-29
Dim 13:55 San Jose (SJC) B 16:25 Boise (BOI)
WN 3726 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-09-01
Jeu,Ven,Dim 14:40 Houston Hobby (HOU) 18:15 Pittsburgh (PIT)
WN 3726 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-01-12 through 2025-01-17
Lun,Dim 14:40 Houston Hobby (HOU) 18:15 Pittsburgh (PIT)
WN 3726 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 14:40 Houston Hobby (HOU) 18:15 Pittsburgh (PIT)
WN 3726 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-02 through 2025-02-07
Lun 14:40 Houston Hobby (HOU) 18:15 Pittsburgh (PIT)
WN 3726 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-02-10
Lun,Mar,Jeu 14:40 Houston Hobby (HOU) 18:15 Pittsburgh (PIT)
WN 3726 Non-stop Boeing 737-700 (73W) 2:35 Effective 2025-02-18 through 2025-02-24
Lun 14:40 Houston Hobby (HOU) 18:15 Pittsburgh (PIT)
WN 3726 Non-stop Boeing 737-700 (73W) 2:35 Operates only on 2025-03-03
Lun-Mer 17:00 Minneapolis/Saint Paul (MSP) 2 19:20 Love Field, Dallas (DAL) 1
WN 3726 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 17:00 Minneapolis/Saint Paul (MSP) 2 19:20 Love Field, Dallas (DAL) 1
WN 3726 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Effective 2024-12-20 through 2025-01-02
Dim 17:00 Minneapolis/Saint Paul (MSP) 2 19:20 Love Field, Dallas (DAL) 1
WN 3726 Non-stop Boeing 737 MAX 8 (7M8) 2:20 Operates only on 2025-01-05
Mar,Mer 18:00 Tampa (TPA) 19:25 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-29 through 2024-10-30
Mar,Mer 18:05 Tampa (TPA) 19:30 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-08 through 2024-10-23
Sam 19:00 Tampa (TPA) 20:25 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-10-05 through 2024-11-02
Lun,Jeu,Ven 20:15 Tampa (TPA) 21:40 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-10-03 through 2024-10-28
Ven 20:15 Tampa (TPA) 21:40 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-800 (73H) 2:25 Operates only on 2024-11-01
Dim 21:55 Tampa (TPA) 23:20 Saint Louis (STL) 2
WN 3726 Non-stop Boeing 737-700 (73W) 2:25 Effective 2024-10-06 through 2024-10-27
Vols indirects:
Mar,Mer 09:00 Austin (AUS) 11:55 San Jose (SJC) B
WN 3726 1-stop Boeing 737-700 (73W) 4:55 Valid until 2024-10-02
Sam 09:25 Albuquerque (ABQ) 12:15 San Jose (SJC) B
WN 3726 1-stop Boeing 737-700 (73W) 3:50 Valid until 2024-09-28
Dim 11:45 San Diego (SAN) 1 16:25 Boise (BOI)
WN 3726 1-stop Boeing 737-700 (73W) 3:40 Operates only on 2024-09-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 3726: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN3726
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3726
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3726
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3726
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
13:55

16:25
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3726
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3726
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3726
Effective 2024-10-29 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3726
Effective 2024-10-08 through 2024-10-23
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3726
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3726
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3726
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN3726
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:50, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3726
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:40, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Albuquerque (ABQ) - San Diego (SAN)
  • Albuquerque (ABQ) - San Jose (SJC)
  • Austin (AUS) - San Diego (SAN)
  • Austin (AUS) - San Jose (SJC)
  • Houston Hobby (HOU) - Pittsburgh (PIT)
  • Minneapolis/Saint Paul (MSP) - Love Field, Dallas (DAL)
  • San Diego (SAN) - Boise (BOI)
  • San Diego (SAN) - San Jose (SJC)
  • San Jose (SJC) - Boise (BOI)
  • Tampa (TPA) - Saint Louis (STL)