Southwest Airlines vol WN 3538: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu 05:35 Nashville (BNA) 08:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-11-28
Sam 06:00 Nashville (BNA) 09:00 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 2:00 Effective 2025-02-15 through 2025-03-01
Sam 06:20 Nashville (BNA) 09:15 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-11 through 2025-02-08
Lun,Jeu,Ven,Dim 06:30 Nashville (BNA) 09:25 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 06:30 Nashville (BNA) 09:25 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-21 through 2025-03-02
Mar 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-11-05
Sam 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-11-09 through 2024-11-16
Sam 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-12-07 through 2024-12-14
Jeu,Ven,Dim 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-12 through 2025-01-17
Lun,Dim 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-02 through 2025-02-07
Lun 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2025-02-10
Lun,Mar,Jeu 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-18 through 2025-02-24
Lun 06:35 Nashville (BNA) 09:30 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2025-03-03
Lun,Mer 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-04 through 2024-11-06
Mar,Mer 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-12 through 2024-11-20
Mar-Ven 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-09 through 2024-12-18
Mar,Mer 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-24 through 2025-01-01
Lun 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2025-01-06
Lun-Ven 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-19 through 2025-01-24
Lun-Ven 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-09 through 2025-02-12
Mar,Mer 06:40 Nashville (BNA) 09:35 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2025-02-19 through 2025-03-05
Jeu,Ven,Dim 09:00 Nashville (BNA) 11:55 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 09:00 Nashville (BNA) 11:55 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-11-11 through 2024-11-25
Ven,Dim 09:00 Nashville (BNA) 11:55 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-12-08 through 2024-12-15
Jeu 09:00 Nashville (BNA) 11:55 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2024-12-19
Ven 09:00 Nashville (BNA) 11:55 Orlando (MCO)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2025-01-03
Dim 09:25 Kansas City (MCI) 11:15 Portland (PDX)
WN 3538 Non-stop Boeing 737-700 (73W) 3:50 Operates only on 2024-09-01
Dim 10:10 Midway, Chicago (MDW) 11:40 Kansas City (MCI)
WN 3538 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-09-08 through 2024-09-29
Dim 14:55 Nashville (BNA) 17:35 Richmond (RIC)
WN 3538 Non-stop Boeing 737-800 (73H) 1:40 Operates only on 2024-10-06
Dim 15:05 Nashville (BNA) 17:45 Richmond (RIC)
WN 3538 Non-stop Boeing 737-800 (73H) 1:40 Effective 2024-10-13 through 2024-10-27
Sam 15:20 Saint Louis (STL) 2 17:20 Portland (PDX)
WN 3538 Non-stop Boeing 737-700 (73W) 4:00 Valid until 2024-09-28
Mar,Mer 16:00 Midway, Chicago (MDW) 18:00 Albuquerque (ABQ)
WN 3538 Non-stop Boeing 737-800 (73H) 3:00 Effective 2024-10-08 through 2024-10-30
Sam 17:55 Portland (PDX) 19:45 San Jose (SJC) B
WN 3538 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2024-09-28
Dim 18:30 Richmond (RIC) 19:20 Baltimore (BWI)
WN 3538 Non-stop Boeing 737-800 (73H) 0:50 Effective 2024-10-06 through 2024-10-27
Jeu 19:00 Oakland (OAK) 2 21:00 Spokane (GEG)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Operates only on 2024-10-31
Sam 19:15 San Antonio (SAT) A 20:10 Las Vegas Harry Reid (LAS) 1
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-11-23 through 2024-11-30
Sam 19:15 San Antonio (SAT) A 20:10 Las Vegas Harry Reid (LAS) 1
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Effective 2024-12-21 through 2025-01-04
Sam 19:50 Midway, Chicago (MDW) 21:50 Albuquerque (ABQ)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-10-05 through 2024-10-26
Sam 19:50 Midway, Chicago (MDW) 21:50 Albuquerque (ABQ)
WN 3538 Non-stop Boeing 737-700 (73W) 3:00 Operates only on 2024-11-02
Jeu 22:10 Midway, Chicago (MDW) 00:10 Albuquerque (ABQ)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2024-10-03
The flight arrives 1 day after departure.
Lun,Jeu,Ven 22:20 Midway, Chicago (MDW) 00:20 Albuquerque (ABQ)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Effective 2024-10-04 through 2024-10-28
The flight arrives 1 day after departure.
Ven 22:20 Midway, Chicago (MDW) 00:20 Albuquerque (ABQ)
WN 3538 Non-stop Boeing 737 MAX 8 (7M8) 3:00 Operates only on 2024-11-01
The flight arrives 1 day after departure.
Vols indirects:
Dim 14:55 Nashville (BNA) 19:20 Baltimore (BWI)
WN 3538 1-stop Boeing 737-800 (73H) 3:25 Operates only on 2024-10-06
Dim 15:05 Nashville (BNA) 19:20 Baltimore (BWI)
WN 3538 1-stop Boeing 737-800 (73H) 3:15 Effective 2024-10-13 through 2024-10-27
Sam 15:20 Saint Louis (STL) 2 19:45 San Jose (SJC) B
WN 3538 1-stop Boeing 737-700 (73W) 6:25 Valid until 2024-09-28
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 3538: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN3538
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2024-11-05
Lun
-
Mar
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-11-04 through 2024-11-06
Lun
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Operates only on 2024-10-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Effective 2024-10-13 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 0:50, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Effective 2024-10-05 through 2024-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3538
Operates only on 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3538
Operates only on 2024-10-03
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN3538
Effective 2024-10-04 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN3538
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:00, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Vols indirects:

Southwest Airlines WN3538
Operates only on 2024-10-06
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:25, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Effective 2024-10-13 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:15, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3538
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 6:25, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Kansas City (MCI) - Portland (PDX)
  • Midway, Chicago (MDW) - Albuquerque (ABQ)
  • Midway, Chicago (MDW) - Kansas City (MCI)
  • Nashville (BNA) - Baltimore (BWI)
  • Nashville (BNA) - Orlando (MCO)
  • Nashville (BNA) - Richmond (RIC)
  • Oakland (OAK) - Spokane (GEG)
  • Portland (PDX) - San Jose (SJC)
  • Richmond (RIC) - Baltimore (BWI)
  • Saint Louis (STL) - Portland (PDX)
  • Saint Louis (STL) - San Jose (SJC)
  • San Antonio (SAT) - Las Vegas Harry Reid (LAS)