Southwest Airlines vol WN 3524: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 08:50 Houston Hobby (HOU) 10:25 Midland (MAF)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Effective 2025-01-11 through 2025-02-08
Sam 08:55 Phoenix Sky Harbor (PHX) 4 10:25 Long Beach (LGB)
WN 3524 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-10-05 through 2024-11-02
Mar,Mer 09:05 Phoenix Sky Harbor (PHX) 4 10:35 Long Beach (LGB)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2024-10-08 through 2024-10-30
Sam 11:10 Midland (MAF) 11:35 Las Vegas Harry Reid (LAS) 1
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-01-11 through 2025-02-08
Sam 12:10 Long Beach (LGB) 20:10 Orlando (MCO)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 5:00 Valid until 2024-09-28
Lun-Mer 16:30 Las Vegas Harry Reid (LAS) 1 17:55 Santa Barbara (SBA)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 16:30 Las Vegas Harry Reid (LAS) 1 17:55 Santa Barbara (SBA)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-20 through 2025-01-02
Dim 16:30 Las Vegas Harry Reid (LAS) 1 17:55 Santa Barbara (SBA)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-01-05
Jeu,Ven,Dim 17:10 Tucson (TUS) 17:30 San Diego (SAN) 1
WN 3524 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 17:10 Tucson (TUS) 17:30 San Diego (SAN) 1
WN 3524 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-11 through 2024-11-25
Ven,Dim 17:10 Tucson (TUS) 17:30 San Diego (SAN) 1
WN 3524 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-08 through 2024-12-15
Jeu 17:10 Tucson (TUS) 17:30 San Diego (SAN) 1
WN 3524 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-12-19
Ven 17:10 Tucson (TUS) 17:30 San Diego (SAN) 1
WN 3524 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-01-03
Jeu,Ven,Dim 18:15 San Diego (SAN) 1 23:45 Saint Louis (STL) 2
WN 3524 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 18:15 San Diego (SAN) 1 23:45 Saint Louis (STL) 2
WN 3524 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-11-11 through 2024-11-25
Ven,Dim 18:15 San Diego (SAN) 1 23:45 Saint Louis (STL) 2
WN 3524 Non-stop Boeing 737-700 (73W) 3:30 Effective 2024-12-08 through 2024-12-15
Jeu 18:15 San Diego (SAN) 1 23:45 Saint Louis (STL) 2
WN 3524 Non-stop Boeing 737-700 (73W) 3:30 Operates only on 2024-12-19
Ven 18:15 San Diego (SAN) 1 23:45 Saint Louis (STL) 2
WN 3524 Non-stop Boeing 737-700 (73W) 3:30 Operates only on 2025-01-03
Sam 18:35 Santa Barbara (SBA) 19:45 Oakland (OAK) 2
WN 3524 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-11-23 through 2024-11-30
Sam 18:35 Santa Barbara (SBA) 19:45 Oakland (OAK) 2
WN 3524 Non-stop Boeing 737-800 (73H) 1:10 Effective 2024-12-21 through 2025-01-04
Lun-Mer 18:40 Santa Barbara (SBA) 19:50 Oakland (OAK) 2
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 18:40 Santa Barbara (SBA) 19:50 Oakland (OAK) 2
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Effective 2024-12-20 through 2025-01-02
Dim 18:40 Santa Barbara (SBA) 19:50 Oakland (OAK) 2
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2025-01-05
Dim 18:50 Santa Barbara (SBA) 20:00 Oakland (OAK) 2
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2024-12-01
Dim 20:50 Oakland (OAK) 2 23:35 Salt Lake City (SLC)
WN 3524 Non-stop Boeing 737 MAX 8 (7M8) 1:45 Operates only on 2024-12-01
Dim 21:55 Sacramento (SMF) B 23:25 Las Vegas Harry Reid (LAS) 1
WN 3524 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-09-08 through 2024-09-29
Vols indirects:
Sam 08:50 Houston Hobby (HOU) 11:35 Las Vegas Harry Reid (LAS) 1
WN 3524 1-stop Boeing 737 MAX 8 (7M8) 4:45 Effective 2025-01-11 through 2025-02-08
Lun-Mer 16:30 Las Vegas Harry Reid (LAS) 1 19:50 Oakland (OAK) 2
WN 3524 1-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 16:30 Las Vegas Harry Reid (LAS) 1 19:50 Oakland (OAK) 2
WN 3524 1-stop Boeing 737 MAX 8 (7M8) 3:20 Effective 2024-12-20 through 2025-01-02
Dim 16:30 Las Vegas Harry Reid (LAS) 1 19:50 Oakland (OAK) 2
WN 3524 1-stop Boeing 737 MAX 8 (7M8) 3:20 Operates only on 2025-01-05
Jeu,Ven,Dim 17:10 Tucson (TUS) 23:45 Saint Louis (STL) 2
WN 3524 1-stop Boeing 737-700 (73W) 5:35 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 17:10 Tucson (TUS) 23:45 Saint Louis (STL) 2
WN 3524 1-stop Boeing 737-700 (73W) 5:35 Effective 2024-11-11 through 2024-11-25
Ven,Dim 17:10 Tucson (TUS) 23:45 Saint Louis (STL) 2
WN 3524 1-stop Boeing 737-700 (73W) 5:35 Effective 2024-12-08 through 2024-12-15
Jeu 17:10 Tucson (TUS) 23:45 Saint Louis (STL) 2
WN 3524 1-stop Boeing 737-700 (73W) 5:35 Operates only on 2024-12-19
Ven 17:10 Tucson (TUS) 23:45 Saint Louis (STL) 2
WN 3524 1-stop Boeing 737-700 (73W) 5:35 Operates only on 2025-01-03
Dim 18:50 Santa Barbara (SBA) 23:35 Salt Lake City (SLC)
WN 3524 1-stop Boeing 737 MAX 8 (7M8) 3:45 Operates only on 2024-12-01
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 3524: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN3524
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3524
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 5:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3524
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3524
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:45, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Vols indirects:

Southwest Airlines WN3524
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:45, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:20, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3524
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 5:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN3524
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:45, 1-stop
Boeing 737 MAX 8 (7M8)
This flight number is listed as serving the following routes:
  • Houston Hobby (HOU) - Las Vegas Harry Reid (LAS)
  • Houston Hobby (HOU) - Midland (MAF)
  • Las Vegas Harry Reid (LAS) - Oakland (OAK)
  • Las Vegas Harry Reid (LAS) - Santa Barbara (SBA)
  • Long Beach (LGB) - Orlando (MCO)
  • Midland (MAF) - Las Vegas Harry Reid (LAS)
  • Oakland (OAK) - Salt Lake City (SLC)
  • Phoenix Sky Harbor (PHX) - Long Beach (LGB)
  • Sacramento (SMF) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Saint Louis (STL)
  • Santa Barbara (SBA) - Oakland (OAK)
  • Santa Barbara (SBA) - Salt Lake City (SLC)
  • Tucson (TUS) - Saint Louis (STL)
  • Tucson (TUS) - San Diego (SAN)