Southwest Airlines vol WN 3112: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun-Mer 10:45 Ronald Reagan Washington (DCA) 11:40 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 10:45 Ronald Reagan Washington (DCA) 11:40 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 1:55 Effective 2024-12-20 through 2025-01-02
Dim 10:45 Ronald Reagan Washington (DCA) 11:40 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2025-01-05
Lun-Mer 12:35 Nashville (BNA) 15:15 Long Beach (LGB)
WN 3112 Non-stop Boeing 737-800 (73H) 4:40 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 12:35 Nashville (BNA) 15:15 Long Beach (LGB)
WN 3112 Non-stop Boeing 737-800 (73H) 4:40 Effective 2024-12-20 through 2025-01-02
Dim 12:35 Nashville (BNA) 15:15 Long Beach (LGB)
WN 3112 Non-stop Boeing 737-800 (73H) 4:40 Operates only on 2025-01-05
Sam 12:55 Ronald Reagan Washington (DCA) 13:55 Nashville (BNA)
WN 3112 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-11-09 through 2024-11-16
Sam 12:55 Ronald Reagan Washington (DCA) 13:55 Nashville (BNA)
WN 3112 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2024-12-07 through 2024-12-14
Sam 12:55 Ronald Reagan Washington (DCA) 14:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:05 Effective 2025-02-15 through 2025-03-01
Lun,Jeu,Ven 13:05 Atlanta (ATL) N 14:30 Orlando (MCO)
WN 3112 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-03 through 2024-10-25
Lun,Ven 13:10 Atlanta (ATL) N 14:35 Orlando (MCO)
WN 3112 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-10-28 through 2024-11-01
Lun-Ven,Dim 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-11-03 through 2024-11-25
Sam 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-11-23 through 2024-11-30
Mar-Ven 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-11-29 through 2024-12-06
Dim 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Operates only on 2024-12-01
Lun-Ven,Dim 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-12-08 through 2024-12-19
Sam 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-700 (73W) 2:00 Effective 2024-12-21 through 2025-01-04
Mar,Mer 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:00 Effective 2024-12-24 through 2025-01-01
Lun,Ven 15:00 Ronald Reagan Washington (DCA) 16:00 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:00 Effective 2025-01-03 through 2025-01-06
Lun-Ven 15:00 Ronald Reagan Washington (DCA) 16:10 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 15:00 Ronald Reagan Washington (DCA) 16:10 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-19 through 2025-01-24
Lun-Ven 15:00 Ronald Reagan Washington (DCA) 16:10 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 15:00 Ronald Reagan Washington (DCA) 16:10 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-09 through 2025-02-12
Mar,Mer 15:00 Ronald Reagan Washington (DCA) 16:10 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-19 through 2025-03-05
Jeu,Ven,Dim 15:10 Ronald Reagan Washington (DCA) 16:20 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-12 through 2025-01-17
Lun,Dim 15:10 Ronald Reagan Washington (DCA) 16:20 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 15:10 Ronald Reagan Washington (DCA) 16:20 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-02 through 2025-02-07
Lun 15:10 Ronald Reagan Washington (DCA) 16:20 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2025-02-10
Lun,Mar,Jeu 15:10 Ronald Reagan Washington (DCA) 16:20 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-18 through 2025-02-24
Lun 15:10 Ronald Reagan Washington (DCA) 16:20 Nashville (BNA)
WN 3112 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2025-03-03
Dim 15:20 Charlotte (CLT) 16:25 Saint Louis (STL) 2
WN 3112 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-09-08 through 2024-09-29
Lun,Jeu,Ven,Dim 15:30 Ronald Reagan Washington (DCA) 16:45 Nashville (BNA)
WN 3112 Non-stop Boeing 737-700 (73W) 2:15 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 15:30 Ronald Reagan Washington (DCA) 16:45 Nashville (BNA)
WN 3112 Non-stop Boeing 737-700 (73W) 2:15 Effective 2025-02-21 through 2025-03-02
Lun-Mer 16:45 Nashville (BNA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 Non-stop Boeing 737-800 (73H) 4:10 Effective 2024-11-04 through 2024-11-06
Mar,Mer 16:45 Nashville (BNA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 Non-stop Boeing 737-800 (73H) 4:10 Effective 2024-11-12 through 2024-11-20
Mar-Ven 16:45 Nashville (BNA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 Non-stop Boeing 737-800 (73H) 4:10 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 16:45 Nashville (BNA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 Non-stop Boeing 737-800 (73H) 4:10 Effective 2024-12-09 through 2024-12-18
Mar,Mer 16:45 Nashville (BNA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 Non-stop Boeing 737-800 (73H) 4:10 Effective 2024-12-24 through 2025-01-01
Lun 16:45 Nashville (BNA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2025-01-06
Dim 16:50 Nashville (BNA) 19:40 Tampa (TPA)
WN 3112 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Operates only on 2024-12-01
Vols indirects:
Lun-Mer 10:45 Ronald Reagan Washington (DCA) 15:15 Long Beach (LGB)
WN 3112 1-stop Boeing 737-800 (73H) 7:30 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 10:45 Ronald Reagan Washington (DCA) 15:15 Long Beach (LGB)
WN 3112 1-stop Boeing 737-800 (73H) 7:30 Effective 2024-12-20 through 2025-01-02
Dim 10:45 Ronald Reagan Washington (DCA) 15:15 Long Beach (LGB)
WN 3112 1-stop Boeing 737-800 (73H) 7:30 Operates only on 2025-01-05
Lun-Mer 15:00 Ronald Reagan Washington (DCA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 1-stop Boeing 737-800 (73H) 6:55 Effective 2024-11-04 through 2024-11-06
Mar,Mer 15:00 Ronald Reagan Washington (DCA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 1-stop Boeing 737-800 (73H) 6:55 Effective 2024-11-12 through 2024-11-20
Mar-Ven 15:00 Ronald Reagan Washington (DCA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 1-stop Boeing 737-800 (73H) 6:55 Effective 2024-11-29 through 2024-12-06
Dim 15:00 Ronald Reagan Washington (DCA) 19:40 Tampa (TPA)
WN 3112 1-stop Boeing 737 MAX 8 (7M8) 4:40 Operates only on 2024-12-01
Lun-Jeu 15:00 Ronald Reagan Washington (DCA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 1-stop Boeing 737-800 (73H) 6:55 Effective 2024-12-09 through 2024-12-18
Mar,Mer 15:00 Ronald Reagan Washington (DCA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 1-stop Boeing 737-800 (73H) 6:55 Effective 2024-12-24 through 2025-01-01
Lun 15:00 Ronald Reagan Washington (DCA) 18:55 Las Vegas Harry Reid (LAS) 1
WN 3112 1-stop Boeing 737-800 (73H) 6:55 Operates only on 2025-01-06
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 3112: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN3112
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3112
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3112
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-10-03 through 2024-10-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2024-10-28 through 2024-11-01
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2024-11-03 through 2024-11-25
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3112
Effective 2024-12-08 through 2024-12-19
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-01-03 through 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:00, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN3112
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Southwest Airlines WN3112
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 7:30, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 7:30, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 7:30, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 6:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:40, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN3112
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 6:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:55, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN3112
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:55, 1-stop
Boeing 737-800 (73H)
This flight number is listed as serving the following routes:
  • Atlanta (ATL) - Orlando (MCO)
  • Charlotte (CLT) - Saint Louis (STL)
  • Nashville (BNA) - Las Vegas Harry Reid (LAS)
  • Nashville (BNA) - Long Beach (LGB)
  • Nashville (BNA) - Tampa (TPA)
  • Ronald Reagan Washington (DCA) - Las Vegas Harry Reid (LAS)
  • Ronald Reagan Washington (DCA) - Long Beach (LGB)
  • Ronald Reagan Washington (DCA) - Nashville (BNA)
  • Ronald Reagan Washington (DCA) - Tampa (TPA)