Southwest Airlines vol WN 2571: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Sam 05:10 Sacramento (SMF) B 08:00 Phoenix Sky Harbor (PHX) 4
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 1:50 Effective 2025-01-11 through 2025-02-08
Lun,Jeu,Ven,Dim 10:05 Denver (DEN) 13:05 Minneapolis/Saint Paul (MSP) 2
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 10:05 Denver (DEN) 13:05 Minneapolis/Saint Paul (MSP) 2
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Effective 2025-02-21 through 2025-03-02
Jeu 10:10 Sacramento (SMF) B 11:40 San Diego (SAN) 1
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2024-10-31
Sam 10:20 San Diego (SAN) 1 16:10 Nashville (BNA)
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 3:50 Effective 2024-10-05 through 2024-11-02
Lun,Jeu,Ven 11:30 Sacramento (SMF) B 13:00 San Diego (SAN) 1
WN 2571 Non-stop Boeing 737-700 (73W) 1:30 Effective 2024-10-03 through 2024-10-28
Ven 11:30 Sacramento (SMF) B 13:00 San Diego (SAN) 1
WN 2571 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-11-01
Jeu 12:30 San Diego (SAN) 1 14:00 Las Vegas Harry Reid (LAS) 1
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2024-10-31
Jeu 13:20 Charleston (CHS) 14:50 Baltimore (BWI)
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Operates only on 2024-11-28
Mar,Mer 13:30 San Diego (SAN) 1 19:20 Nashville (BNA)
WN 2571 Non-stop Boeing 737-700 (73W) 3:50 Effective 2024-10-08 through 2024-10-30
Lun,Jeu,Ven 13:45 San Diego (SAN) 1 19:35 Nashville (BNA)
WN 2571 Non-stop Boeing 737-700 (73W) 3:50 Effective 2024-10-03 through 2024-10-28
Ven 13:45 San Diego (SAN) 1 19:35 Nashville (BNA)
WN 2571 Non-stop Boeing 737-700 (73W) 3:50 Operates only on 2024-11-01
Sam 19:10 Las Vegas Harry Reid (LAS) 1 20:45 Sacramento (SMF) B
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 1:35 Valid until 2024-09-28
Lun,Jeu,Ven 19:55 Long Beach (LGB) 21:05 Las Vegas Harry Reid (LAS) 1
WN 2571 Non-stop Boeing 737-700 (73W) 1:10 Valid until 2024-09-30
Mar,Mer 20:20 Las Vegas Harry Reid (LAS) 1 21:55 Sacramento (SMF) B
WN 2571 Non-stop Boeing 737-800 (73H) 1:35 Valid until 2024-10-01
Mer 20:20 Las Vegas Harry Reid (LAS) 1 21:55 Sacramento (SMF) B
WN 2571 Non-stop Boeing 737-700 (73W) 1:35 Operates only on 2024-10-02
Dim 20:45 Las Vegas Harry Reid (LAS) 1 22:15 Sacramento (SMF) B
WN 2571 Non-stop Boeing 737 MAX 8 (7M8) 1:30 Effective 2024-09-08 through 2024-09-29
Dim 21:35 Las Vegas Harry Reid (LAS) 1 23:05 Sacramento (SMF) B
WN 2571 Non-stop Boeing 737-700 (73W) 1:30 Operates only on 2024-09-01
Lun,Jeu,Ven 21:45 Las Vegas Harry Reid (LAS) 1 23:15 Sacramento (SMF) B
WN 2571 Non-stop Boeing 737-700 (73W) 1:30 Valid until 2024-09-30
Vols indirects:
Jeu 10:10 Sacramento (SMF) B 14:00 Las Vegas Harry Reid (LAS) 1
WN 2571 1-stop Boeing 737 MAX 8 (7M8) 3:50 Operates only on 2024-10-31
Lun,Jeu,Ven 11:30 Sacramento (SMF) B 19:35 Nashville (BNA)
WN 2571 1-stop Boeing 737-700 (73W) 6:05 Effective 2024-10-03 through 2024-10-28
Ven 11:30 Sacramento (SMF) B 19:35 Nashville (BNA)
WN 2571 1-stop Boeing 737-700 (73W) 6:05 Operates only on 2024-11-01
Lun,Jeu,Ven 19:55 Long Beach (LGB) 23:15 Sacramento (SMF) B
WN 2571 1-stop Boeing 737-700 (73W) 3:20 Valid until 2024-09-30
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2571: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2571
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:50, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:35, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Valid until 2024-10-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2571
Operates only on 2024-10-02
Lun
-
Mar
-
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN2571
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:50, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2571
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 6:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 6:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2571
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:20, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Charleston (CHS) - Baltimore (BWI)
  • Denver (DEN) - Minneapolis/Saint Paul (MSP)
  • Las Vegas Harry Reid (LAS) - Sacramento (SMF)
  • Long Beach (LGB) - Las Vegas Harry Reid (LAS)
  • Long Beach (LGB) - Sacramento (SMF)
  • Sacramento (SMF) - Nashville (BNA)
  • Sacramento (SMF) - Phoenix Sky Harbor (PHX)
  • Sacramento (SMF) - San Diego (SAN)
  • San Diego (SAN) - Las Vegas Harry Reid (LAS)
  • San Diego (SAN) - Nashville (BNA)