Southwest Airlines vol WN 2568: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven,Dim 06:05 Tucson (TUS) 09:15 Houston Hobby (HOU)
WN 2568 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 06:05 Tucson (TUS) 09:15 Houston Hobby (HOU)
WN 2568 Non-stop Boeing 737-800 (73H) 2:10 Effective 2025-02-21 through 2025-03-02
Lun,Jeu,Ven 10:45 Denver (DEN) 12:40 Seattle-Tacoma (SEA)
WN 2568 Non-stop Boeing 737 MAX 8 (7M8) 2:55 Valid until 2024-09-30
Lun,Jeu,Ven 13:30 Seattle-Tacoma (SEA) 15:45 San Jose (SJC) B
WN 2568 Non-stop Boeing 737 MAX 8 (7M8) 2:15 Valid until 2024-09-30
Jeu,Ven,Dim 14:05 New Orleans (MSY) 15:55 Saint Louis (STL) 2
WN 2568 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-01-12 through 2025-01-17
Lun,Dim 14:05 New Orleans (MSY) 15:55 Saint Louis (STL) 2
WN 2568 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 14:05 New Orleans (MSY) 15:55 Saint Louis (STL) 2
WN 2568 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-02-02 through 2025-02-07
Lun 14:05 New Orleans (MSY) 15:55 Saint Louis (STL) 2
WN 2568 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-02-10
Lun,Mar,Jeu 14:05 New Orleans (MSY) 15:55 Saint Louis (STL) 2
WN 2568 Non-stop Boeing 737-700 (73W) 1:50 Effective 2025-02-18 through 2025-02-24
Lun 14:05 New Orleans (MSY) 15:55 Saint Louis (STL) 2
WN 2568 Non-stop Boeing 737-700 (73W) 1:50 Operates only on 2025-03-03
Jeu 14:45 Las Vegas Harry Reid (LAS) 1 17:55 Bozeman (BZN)
WN 2568 Non-stop Boeing 737-800 (73H) 2:10 Operates only on 2024-10-31
Sam 16:00 Las Vegas Harry Reid (LAS) 1 19:05 Bozeman (BZN)
WN 2568 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-10-05 through 2024-11-02
Lun,Jeu,Ven 16:40 Burbank (BUR) 17:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-10-03 through 2024-10-28
Ven 16:40 Burbank (BUR) 17:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-11-01
Jeu,Ven,Dim 17:35 Fresno (FAT) 18:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 17:35 Fresno (FAT) 18:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-11-11 through 2024-11-25
Ven,Dim 17:35 Fresno (FAT) 18:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-12-08 through 2024-12-15
Jeu 17:35 Fresno (FAT) 18:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2024-12-19
Ven 17:35 Fresno (FAT) 18:50 Las Vegas Harry Reid (LAS) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:15 Operates only on 2025-01-03
Lun,Jeu,Ven 18:30 Las Vegas Harry Reid (LAS) 1 21:35 Bozeman (BZN)
WN 2568 Non-stop Boeing 737-700 (73W) 2:05 Effective 2024-10-03 through 2024-10-28
Ven 18:30 Las Vegas Harry Reid (LAS) 1 21:35 Bozeman (BZN)
WN 2568 Non-stop Boeing 737-700 (73W) 2:05 Operates only on 2024-11-01
Jeu,Ven,Dim 19:30 Las Vegas Harry Reid (LAS) 1 20:40 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 19:30 Las Vegas Harry Reid (LAS) 1 20:40 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-11-11 through 2024-11-25
Ven,Dim 19:30 Las Vegas Harry Reid (LAS) 1 20:40 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Effective 2024-12-08 through 2024-12-15
Jeu 19:30 Las Vegas Harry Reid (LAS) 1 20:40 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2024-12-19
Ven 19:30 Las Vegas Harry Reid (LAS) 1 20:40 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-700 (73W) 1:10 Operates only on 2025-01-03
Dim 20:25 Las Vegas Harry Reid (LAS) 1 23:30 Bozeman (BZN)
WN 2568 Non-stop Boeing 737-800 (73H) 2:05 Effective 2024-10-06 through 2024-10-27
Lun-Mer 20:45 San Francisco (SFO) 1 22:15 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 20:45 San Francisco (SFO) 1 22:15 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-800 (73H) 1:30 Effective 2024-12-20 through 2025-01-02
Dim 20:45 San Francisco (SFO) 1 22:15 San Diego (SAN) 1
WN 2568 Non-stop Boeing 737-800 (73H) 1:30 Operates only on 2025-01-05
Jeu,Ven,Dim 21:15 San Diego (SAN) 1 23:35 Tucson (TUS)
WN 2568 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 21:15 San Diego (SAN) 1 23:35 Tucson (TUS)
WN 2568 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-11-11 through 2024-11-25
Ven,Dim 21:15 San Diego (SAN) 1 23:35 Tucson (TUS)
WN 2568 Non-stop Boeing 737-700 (73W) 1:20 Effective 2024-12-08 through 2024-12-15
Jeu 21:15 San Diego (SAN) 1 23:35 Tucson (TUS)
WN 2568 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2024-12-19
Ven 21:15 San Diego (SAN) 1 23:35 Tucson (TUS)
WN 2568 Non-stop Boeing 737-700 (73W) 1:20 Operates only on 2025-01-03
Vols indirects:
Lun,Jeu,Ven 10:45 Denver (DEN) 15:45 San Jose (SJC) B
WN 2568 1-stop Boeing 737 MAX 8 (7M8) 6:00 Valid until 2024-09-30
Lun,Jeu,Ven 16:40 Burbank (BUR) 21:35 Bozeman (BZN)
WN 2568 1-stop Boeing 737-700 (73W) 3:55 Effective 2024-10-03 through 2024-10-28
Ven 16:40 Burbank (BUR) 21:35 Bozeman (BZN)
WN 2568 1-stop Boeing 737-700 (73W) 3:55 Operates only on 2024-11-01
Jeu,Ven,Dim 17:35 Fresno (FAT) 20:40 San Diego (SAN) 1
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 17:35 Fresno (FAT) 20:40 San Diego (SAN) 1
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-11 through 2024-11-25
Ven,Dim 17:35 Fresno (FAT) 20:40 San Diego (SAN) 1
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-12-08 through 2024-12-15
Jeu 17:35 Fresno (FAT) 20:40 San Diego (SAN) 1
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-12-19
Ven 17:35 Fresno (FAT) 20:40 San Diego (SAN) 1
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2025-01-03
Jeu,Ven,Dim 19:30 Las Vegas Harry Reid (LAS) 1 23:35 Tucson (TUS)
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 19:30 Las Vegas Harry Reid (LAS) 1 23:35 Tucson (TUS)
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-11-11 through 2024-11-25
Ven,Dim 19:30 Las Vegas Harry Reid (LAS) 1 23:35 Tucson (TUS)
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Effective 2024-12-08 through 2024-12-15
Jeu 19:30 Las Vegas Harry Reid (LAS) 1 23:35 Tucson (TUS)
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-12-19
Ven 19:30 Las Vegas Harry Reid (LAS) 1 23:35 Tucson (TUS)
WN 2568 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2025-01-03
Jeu,Ven,Dim 17:35 Fresno (FAT) 23:35 Tucson (TUS)
WN 2568 2-stop Boeing 737-700 (73W) 5:00 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 17:35 Fresno (FAT) 23:35 Tucson (TUS)
WN 2568 2-stop Boeing 737-700 (73W) 5:00 Effective 2024-11-11 through 2024-11-25
Ven,Dim 17:35 Fresno (FAT) 23:35 Tucson (TUS)
WN 2568 2-stop Boeing 737-700 (73W) 5:00 Effective 2024-12-08 through 2024-12-15
Jeu 17:35 Fresno (FAT) 23:35 Tucson (TUS)
WN 2568 2-stop Boeing 737-700 (73W) 5:00 Operates only on 2024-12-19
Ven 17:35 Fresno (FAT) 23:35 Tucson (TUS)
WN 2568 2-stop Boeing 737-700 (73W) 5:00 Operates only on 2025-01-03
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2568: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2568
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2568
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2568
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 2:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:05, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:30, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2568
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN2568
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 6:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2568
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 5:00, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 5:00, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 5:00, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 5:00, 2-stop
Boeing 737-700 (73W)

Southwest Airlines WN2568
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 5:00, 2-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Burbank (BUR) - Bozeman (BZN)
  • Burbank (BUR) - Las Vegas Harry Reid (LAS)
  • Denver (DEN) - San Jose (SJC)
  • Denver (DEN) - Seattle-Tacoma (SEA)
  • Fresno (FAT) - Las Vegas Harry Reid (LAS)
  • Fresno (FAT) - San Diego (SAN)
  • Fresno (FAT) - Tucson (TUS)
  • Las Vegas Harry Reid (LAS) - Bozeman (BZN)
  • Las Vegas Harry Reid (LAS) - San Diego (SAN)
  • Las Vegas Harry Reid (LAS) - Tucson (TUS)
  • New Orleans (MSY) - Saint Louis (STL)
  • San Diego (SAN) - Tucson (TUS)
  • San Francisco (SFO) - San Diego (SAN)
  • Seattle-Tacoma (SEA) - San Jose (SJC)
  • Tucson (TUS) - Houston Hobby (HOU)