Southwest Airlines vol WN 2533: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Ven 07:45 Los Angeles (LAX) 1 08:55 Las Vegas Harry Reid (LAS) 1
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:10 Operates only on 2024-09-20
Dim 09:15 Nashville (BNA) 10:50 Midway, Chicago (MDW)
WN 2533 Non-stop Boeing 737-700 (73W) 1:35 Effective 2024-09-08 through 2024-09-29
Sam 09:30 Midway, Chicago (MDW) 11:45 Cleveland (CLE)
WN 2533 Non-stop Boeing 737-700 (73W) 1:15 Valid until 2024-09-28
Dim 10:45 Midway, Chicago (MDW) 13:00 Cleveland (CLE)
WN 2533 Non-stop Boeing 737-800 (73H) 1:15 Operates only on 2024-09-01
Dim 11:30 Midway, Chicago (MDW) 13:45 Cleveland (CLE)
WN 2533 Non-stop Boeing 737-700 (73W) 1:15 Effective 2024-09-08 through 2024-09-29
Sam 11:40 Love Field, Dallas (DAL) 1 13:05 Tucson (TUS)
WN 2533 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-11-09 through 2024-11-16
Sam 11:40 Love Field, Dallas (DAL) 1 13:05 Tucson (TUS)
WN 2533 Non-stop Boeing 737-800 (73H) 2:25 Effective 2024-12-07 through 2024-12-14
Lun-Mer 12:00 Love Field, Dallas (DAL) 1 13:25 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-04 through 2024-11-06
Mar,Mer 12:00 Love Field, Dallas (DAL) 1 13:25 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-12 through 2024-11-20
Mar-Ven 12:00 Love Field, Dallas (DAL) 1 13:25 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-11-29 through 2024-12-06
Lun-Jeu 12:00 Love Field, Dallas (DAL) 1 13:25 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-09 through 2024-12-18
Mar,Mer 12:00 Love Field, Dallas (DAL) 1 13:25 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2024-12-24 through 2025-01-01
Lun 12:00 Love Field, Dallas (DAL) 1 13:25 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Operates only on 2025-01-06
Sam 12:20 Love Field, Dallas (DAL) 1 13:45 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-01-11 through 2025-02-08
Lun-Ven 12:35 Love Field, Dallas (DAL) 1 14:00 Tucson (TUS)
WN 2533 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 12:35 Love Field, Dallas (DAL) 1 14:00 Tucson (TUS)
WN 2533 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-19 through 2025-01-24
Lun-Ven 12:35 Love Field, Dallas (DAL) 1 14:00 Tucson (TUS)
WN 2533 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 12:35 Love Field, Dallas (DAL) 1 14:00 Tucson (TUS)
WN 2533 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-02-09 through 2025-02-12
Mar,Mer 12:35 Love Field, Dallas (DAL) 1 14:00 Tucson (TUS)
WN 2533 Non-stop Boeing 737-700 (73W) 2:25 Effective 2025-02-19 through 2025-03-05
Mar,Mer 12:40 Midway, Chicago (MDW) 14:55 Cleveland (CLE)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:15 Valid until 2024-10-02
Dim 12:40 Denver (DEN) 14:40 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 2:00 Operates only on 2024-12-01
Sam 13:45 Saint Louis (STL) 2 15:10 Denver (DEN)
WN 2533 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-02-15 through 2025-03-01
Lun-Mer 15:00 Denver (DEN) 16:55 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 15:00 Denver (DEN) 16:55 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Effective 2024-12-20 through 2025-01-02
Dim 15:00 Denver (DEN) 16:55 Tucson (TUS)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:55 Operates only on 2025-01-05
Jeu 17:10 Fort Lauderdale (FLL) 1 19:15 Midway, Chicago (MDW)
WN 2533 Non-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-10-31
Lun-Mer 17:40 Tucson (TUS) 18:00 San Diego (SAN) 1
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 17:40 Tucson (TUS) 18:00 San Diego (SAN) 1
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Effective 2024-12-20 through 2025-01-02
Dim 17:40 Tucson (TUS) 18:00 San Diego (SAN) 1
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-01-05
Sam 17:50 Orlando (MCO) 19:45 Norfolk (ORF)
WN 2533 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-11-23 through 2024-11-30
Sam 17:50 Orlando (MCO) 19:45 Norfolk (ORF)
WN 2533 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-12-21 through 2025-01-04
Lun-Mer 18:55 San Diego (SAN) 1 00:50 Midway, Chicago (MDW)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Effective 2024-11-26 through 2024-12-02
The flight arrives 1 day after departure.
Lun,Jeu,Ven,Dim 18:55 San Diego (SAN) 1 00:50 Midway, Chicago (MDW)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Effective 2024-12-20 through 2025-01-02
The flight arrives 1 day after departure.
Dim 18:55 San Diego (SAN) 1 00:50 Midway, Chicago (MDW)
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Operates only on 2025-01-05
The flight arrives 1 day after departure.
Lun,Jeu,Ven 19:05 Midway, Chicago (MDW) 21:00 Las Vegas Harry Reid (LAS) 1
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Effective 2024-10-03 through 2024-10-28
Ven 19:05 Midway, Chicago (MDW) 21:00 Las Vegas Harry Reid (LAS) 1
WN 2533 Non-stop Boeing 737 MAX 8 (7M8) 3:55 Operates only on 2024-11-01
Sam 19:40 Midway, Chicago (MDW) 21:35 Las Vegas Harry Reid (LAS) 1
WN 2533 Non-stop Boeing 737-700 (73W) 3:55 Effective 2024-10-05 through 2024-11-02
Jeu 20:00 Midway, Chicago (MDW) 21:55 Las Vegas Harry Reid (LAS) 1
WN 2533 Non-stop Boeing 737-700 (73W) 3:55 Operates only on 2024-10-31
Sam 20:25 Norfolk (ORF) 21:25 Baltimore (BWI)
WN 2533 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-11-23 through 2024-11-30
Sam 20:25 Norfolk (ORF) 21:25 Baltimore (BWI)
WN 2533 Non-stop Boeing 737-700 (73W) 1:00 Effective 2024-12-21 through 2025-01-04
Mar,Mer 20:40 Midway, Chicago (MDW) 22:35 Las Vegas Harry Reid (LAS) 1
WN 2533 Non-stop Boeing 737-800 (73H) 3:55 Effective 2024-10-08 through 2024-10-30
Vols indirects:
Dim 09:15 Nashville (BNA) 13:45 Cleveland (CLE)
WN 2533 1-stop Boeing 737-700 (73W) 3:30 Effective 2024-09-08 through 2024-09-29
Lun-Mer 15:00 Denver (DEN) 18:00 San Diego (SAN) 1
WN 2533 1-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 15:00 Denver (DEN) 18:00 San Diego (SAN) 1
WN 2533 1-stop Boeing 737 MAX 8 (7M8) 4:00 Effective 2024-12-20 through 2025-01-02
Dim 15:00 Denver (DEN) 18:00 San Diego (SAN) 1
WN 2533 1-stop Boeing 737 MAX 8 (7M8) 4:00 Operates only on 2025-01-05
Jeu 17:10 Fort Lauderdale (FLL) 1 21:55 Las Vegas Harry Reid (LAS) 1
WN 2533 1-stop Boeing 737-700 (73W) 7:45 Operates only on 2024-10-31
Lun-Mer 17:40 Tucson (TUS) 00:50 Midway, Chicago (MDW)
WN 2533 1-stop Boeing 737 MAX 8 (7M8) 6:10 Effective 2024-11-26 through 2024-12-02
The flight arrives 1 day after departure.
Lun,Jeu,Ven,Dim 17:40 Tucson (TUS) 00:50 Midway, Chicago (MDW)
WN 2533 1-stop Boeing 737 MAX 8 (7M8) 6:10 Effective 2024-12-20 through 2025-01-02
The flight arrives 1 day after departure.
Dim 17:40 Tucson (TUS) 00:50 Midway, Chicago (MDW)
WN 2533 1-stop Boeing 737 MAX 8 (7M8) 6:10 Operates only on 2025-01-05
The flight arrives 1 day after departure.
Sam 17:50 Orlando (MCO) 21:25 Baltimore (BWI)
WN 2533 1-stop Boeing 737-700 (73W) 3:35 Effective 2024-11-23 through 2024-11-30
Sam 17:50 Orlando (MCO) 21:25 Baltimore (BWI)
WN 2533 1-stop Boeing 737-700 (73W) 3:35 Effective 2024-12-21 through 2025-01-04
Lun-Mer 15:00 Denver (DEN) 00:50 Midway, Chicago (MDW)
WN 2533 2-stop Boeing 737 MAX 8 (7M8) 8:50 Effective 2024-11-26 through 2024-12-02
The flight arrives 1 day after departure.
Lun,Jeu,Ven,Dim 15:00 Denver (DEN) 00:50 Midway, Chicago (MDW)
WN 2533 2-stop Boeing 737 MAX 8 (7M8) 8:50 Effective 2024-12-20 through 2025-01-02
The flight arrives 1 day after departure.
Dim 15:00 Denver (DEN) 00:50 Midway, Chicago (MDW)
WN 2533 2-stop Boeing 737 MAX 8 (7M8) 8:50 Operates only on 2025-01-05
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2533: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2533
Operates only on 2024-09-20
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:35, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Valid until 2024-09-28
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2533
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:15, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2533
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2533
Effective 2024-11-04 through 2024-11-06
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-11-12 through 2024-11-20
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-11-29 through 2024-12-06
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-12-09 through 2024-12-18
Lun
Mar
Mer
Jeu
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-12-24 through 2025-01-01
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2025-01-06
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:00, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2533
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 3:55, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:00, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:55, non-stop
Boeing 737-800 (73H)

Vols indirects:

Southwest Airlines WN2533
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:30, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 4:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:00, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2533
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 7:45, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:10, 1-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 6:10, 1-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:10, 1-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 3:35, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2533
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 8:50, 2-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 8:50, 2-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2533
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 8:50, 2-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Denver (DEN) - Midway, Chicago (MDW)
  • Denver (DEN) - San Diego (SAN)
  • Denver (DEN) - Tucson (TUS)
  • Fort Lauderdale (FLL) - Las Vegas Harry Reid (LAS)
  • Fort Lauderdale (FLL) - Midway, Chicago (MDW)
  • Los Angeles (LAX) - Las Vegas Harry Reid (LAS)
  • Love Field, Dallas (DAL) - Tucson (TUS)
  • Midway, Chicago (MDW) - Cleveland (CLE)
  • Midway, Chicago (MDW) - Las Vegas Harry Reid (LAS)
  • Nashville (BNA) - Cleveland (CLE)
  • Nashville (BNA) - Midway, Chicago (MDW)
  • Norfolk (ORF) - Baltimore (BWI)
  • Orlando (MCO) - Baltimore (BWI)
  • Orlando (MCO) - Norfolk (ORF)
  • Saint Louis (STL) - Denver (DEN)
  • San Diego (SAN) - Midway, Chicago (MDW)
  • Tucson (TUS) - Midway, Chicago (MDW)
  • Tucson (TUS) - San Diego (SAN)