Southwest Airlines vol WN 2528: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Lun,Jeu,Ven 06:25 Colorado Springs (COS) 07:15 Phoenix Sky Harbor (PHX) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:50 Valid until 2024-09-30
Dim 06:30 Saint Louis (STL) 2 07:45 Phoenix Sky Harbor (PHX) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2024-09-08 through 2024-09-29
Dim 06:40 Saint Louis (STL) 2 07:55 Phoenix Sky Harbor (PHX) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Operates only on 2024-09-01
Lun,Jeu,Ven 07:50 Phoenix Sky Harbor (PHX) 4 09:20 Burbank (BUR)
WN 2528 Non-stop Boeing 737-700 (73W) 1:30 Valid until 2024-09-30
Lun,Jeu,Ven 08:00 Saint Louis (STL) 2 10:55 Jacksonville (JAX)
WN 2528 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-03 through 2024-10-28
Ven 08:00 Saint Louis (STL) 2 10:55 Jacksonville (JAX)
WN 2528 Non-stop Boeing 737-700 (73W) 1:55 Operates only on 2024-11-01
Mar,Mer 08:25 Phoenix Sky Harbor (PHX) 4 09:55 Burbank (BUR)
WN 2528 Non-stop Boeing 737-700 (73W) 1:30 Valid until 2024-10-02
Mar,Mer 08:55 Saint Louis (STL) 2 11:50 Jacksonville (JAX)
WN 2528 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-08 through 2024-10-30
Jeu,Ven,Dim 09:15 Sacramento (SMF) B 10:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-03 through 2024-11-10
Lun,Jeu,Ven,Dim 09:15 Sacramento (SMF) B 10:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-11 through 2024-11-25
Ven,Dim 09:15 Sacramento (SMF) B 10:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-08 through 2024-12-15
Jeu 09:15 Sacramento (SMF) B 10:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2024-12-19
Ven 09:15 Sacramento (SMF) B 10:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-01-03
Jeu 12:00 Saint Louis (STL) 2 14:55 Jacksonville (JAX)
WN 2528 Non-stop Boeing 737-800 (73H) 1:55 Operates only on 2024-10-31
Sam 12:20 Saint Louis (STL) 2 15:15 Jacksonville (JAX)
WN 2528 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-05 through 2024-11-02
Lun-Ven 12:30 Sacramento (SMF) B 13:55 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-07 through 2025-01-15
Mar-Ven,Dim 12:30 Sacramento (SMF) B 13:55 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-19 through 2025-01-24
Lun-Ven 12:30 Sacramento (SMF) B 13:55 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-01-27 through 2025-02-05
Mar,Mer,Dim 12:30 Sacramento (SMF) B 13:55 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-09 through 2025-02-12
Mar,Mer 12:30 Sacramento (SMF) B 13:55 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-02-19 through 2025-03-05
Dim 13:15 Sacramento (SMF) B 14:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-12-01
Jeu 13:20 Sacramento (SMF) B 14:45 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Operates only on 2024-11-28
Sam 13:35 Sacramento (SMF) B 15:00 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-01-11 through 2025-02-08
Lun,Jeu,Ven,Dim 13:55 Sacramento (SMF) B 15:20 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-13 through 2025-02-17
Jeu,Ven,Dim 13:55 Sacramento (SMF) B 15:20 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-21 through 2025-03-02
Sam 14:10 Sacramento (SMF) B 15:35 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-11-09 through 2024-11-16
Sam 14:10 Sacramento (SMF) B 15:35 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-700 (73W) 1:25 Effective 2024-12-07 through 2024-12-14
Sam 14:15 Sacramento (SMF) B 15:40 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-02-15 through 2025-03-01
Jeu,Ven,Dim 15:00 Sacramento (SMF) B 16:25 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-12 through 2025-01-17
Lun,Dim 15:00 Sacramento (SMF) B 16:25 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-01-20 through 2025-01-26
Jeu,Ven,Dim 15:00 Sacramento (SMF) B 16:25 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-02 through 2025-02-07
Lun 15:00 Sacramento (SMF) B 16:25 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-02-10
Lun,Mar,Jeu 15:00 Sacramento (SMF) B 16:25 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2025-02-18 through 2025-02-24
Lun 15:00 Sacramento (SMF) B 16:25 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Operates only on 2025-03-03
Dim 15:15 Ontario, Los Angeles (ONT) 4 16:20 Las Vegas Harry Reid (LAS) 1
WN 2528 Non-stop Boeing 737-700 (73W) 1:05 Operates only on 2024-12-01
Dim 17:10 Las Vegas Harry Reid (LAS) 1 00:30 Buffalo (BUF)
WN 2528 Non-stop Boeing 737-700 (73W) 4:20 Operates only on 2024-12-01
The flight arrives 1 day after departure.
Sam 17:35 Sacramento (SMF) B 19:00 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-11-23 through 2024-11-30
Sam 17:35 Sacramento (SMF) B 19:00 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737-800 (73H) 1:25 Effective 2024-12-21 through 2025-01-04
Dim 17:55 Saint Louis (STL) 2 20:50 Jacksonville (JAX)
WN 2528 Non-stop Boeing 737-700 (73W) 1:55 Effective 2024-10-06 through 2024-10-27
Lun-Mer 20:50 Sacramento (SMF) B 22:15 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-11-26 through 2024-12-02
Lun,Jeu,Ven,Dim 20:50 Sacramento (SMF) B 22:15 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2024-12-20 through 2025-01-02
Dim 20:50 Sacramento (SMF) B 22:15 Ontario, Los Angeles (ONT) 4
WN 2528 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Operates only on 2025-01-05
Vols indirects:
Lun,Jeu,Ven 06:25 Colorado Springs (COS) 09:20 Burbank (BUR)
WN 2528 1-stop Boeing 737-700 (73W) 3:55 Valid until 2024-09-30
Dim 13:15 Sacramento (SMF) B 16:20 Las Vegas Harry Reid (LAS) 1
WN 2528 1-stop Boeing 737-700 (73W) 3:05 Operates only on 2024-12-01
Dim 15:15 Ontario, Los Angeles (ONT) 4 00:30 Buffalo (BUF)
WN 2528 1-stop Boeing 737-700 (73W) 6:15 Operates only on 2024-12-01
The flight arrives 1 day after departure.
Dim 13:15 Sacramento (SMF) B 00:30 Buffalo (BUF)
WN 2528 2-stop Boeing 737-700 (73W) 8:15 Operates only on 2024-12-01
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2528: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2528
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:50, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2024-09-08 through 2024-09-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2528
Operates only on 2024-09-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2528
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2024-10-03 through 2024-10-28
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Operates only on 2024-11-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Valid until 2024-10-02
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:30, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2024-10-08 through 2024-10-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2024-11-03 through 2024-11-10
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2024-11-11 through 2024-11-25
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2024-12-08 through 2024-12-15
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Operates only on 2024-12-19
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Operates only on 2025-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Operates only on 2024-10-31
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:55, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2024-10-05 through 2024-11-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-01-07 through 2025-01-15
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-01-19 through 2025-01-24
Lun
-
Mar
Mer
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-01-27 through 2025-02-05
Lun
Mar
Mer
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-02-09 through 2025-02-12
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-02-19 through 2025-03-05
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Operates only on 2024-11-28
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-01-11 through 2025-02-08
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2528
Effective 2025-02-13 through 2025-02-17
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2025-02-21 through 2025-03-02
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2024-11-09 through 2024-11-16
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2024-12-07 through 2024-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2025-02-15 through 2025-03-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2528
Effective 2025-01-12 through 2025-01-17
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2025-01-20 through 2025-01-26
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2025-02-02 through 2025-02-07
Lun
-
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Operates only on 2025-02-10
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2025-02-18 through 2025-02-24
Lun
Mar
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Operates only on 2025-03-03
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:05, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:20, non-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN2528
Effective 2024-11-23 through 2024-11-30
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2024-12-21 through 2025-01-04
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2528
Effective 2024-10-06 through 2024-10-27
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:55, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Effective 2024-11-26 through 2024-12-02
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2528
Effective 2024-12-20 through 2025-01-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2528
Operates only on 2025-01-05
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Vols indirects:

Southwest Airlines WN2528
Valid until 2024-09-30
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:55, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 3:05, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2528
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 6:15, 1-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.

Southwest Airlines WN2528
13:15

00:30(+1)
Operates only on 2024-12-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 8:15, 2-stop
Boeing 737-700 (73W)
The flight arrives 1 day after departure.
This flight number is listed as serving the following routes:
  • Colorado Springs (COS) - Burbank (BUR)
  • Colorado Springs (COS) - Phoenix Sky Harbor (PHX)
  • Las Vegas Harry Reid (LAS) - Buffalo (BUF)
  • Ontario, Los Angeles (ONT) - Buffalo (BUF)
  • Ontario, Los Angeles (ONT) - Las Vegas Harry Reid (LAS)
  • Phoenix Sky Harbor (PHX) - Burbank (BUR)
  • Sacramento (SMF) - Buffalo (BUF)
  • Sacramento (SMF) - Las Vegas Harry Reid (LAS)
  • Sacramento (SMF) - Ontario, Los Angeles (ONT)
  • Saint Louis (STL) - Jacksonville (JAX)
  • Saint Louis (STL) - Phoenix Sky Harbor (PHX)