Southwest Airlines vol WN 2525: Multiple routes

Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:
Jeu 05:50 Pittsburgh (PIT) 07:10 Baltimore (BWI)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 1:20 Operates only on 2025-11-27
Sam 07:35 Las Vegas Harry Reid (LAS) 1 14:45 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 4:10 Valid until 2025-05-31
Dim 07:40 Las Vegas Harry Reid (LAS) 1 14:50 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737-800 (73H) 4:10 Effective 2025-05-04 through 2025-05-18
Dim 07:40 Las Vegas Harry Reid (LAS) 1 14:50 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2025-06-01
Lun,Jeu,Ven 08:15 Las Vegas Harry Reid (LAS) 1 15:20 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 4:05 Valid until 2025-06-02
Mar,Mer 09:00 Houston Hobby (HOU) 10:15 San Diego (SAN) 1
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 3:15 Effective 2025-06-10 through 2025-07-30
Mar,Mer 11:00 San Diego (SAN) 1 12:25 San Jose (SJC) B
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 1:25 Effective 2025-06-10 through 2025-07-30
Sam 13:45 San Diego (SAN) 1 17:10 Denver (DEN)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-11-22 through 2025-11-29
Sam 13:45 San Diego (SAN) 1 17:10 Denver (DEN)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 2:25 Effective 2025-12-20 through 2026-01-03
Lun-Mer 13:50 San Diego (SAN) 1 17:15 Denver (DEN)
WN 2525 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-11-25 through 2025-12-01
Lun,Mar,Ven,Dim 13:50 San Diego (SAN) 1 17:15 Denver (DEN)
WN 2525 Non-stop Boeing 737-800 (73H) 2:25 Effective 2025-12-19 through 2026-01-04
Dim 16:10 Jacksonville (JAX) 17:45 Love Field, Dallas (DAL) 1
WN 2525 Non-stop Boeing 737-700 (Scimitar Winglets) 2:35 Effective 2025-10-05 through 2025-10-26
Mar,Mer 17:55 Las Vegas Harry Reid (LAS) 1 01:05 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 4:10 Valid until 2025-06-04
The flight arrives 1 day after departure.
Dim 18:00 Las Vegas Harry Reid (LAS) 1 01:10 Pittsburgh (PIT)
WN 2525 Non-stop Boeing 737-800 (73H) 4:10 Operates only on 2025-05-25
The flight arrives 1 day after departure.
Lun-Mer 18:00 Denver (DEN) 23:40 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:40 Effective 2025-11-25 through 2025-12-01
Lun,Mar,Ven,Dim 18:00 Denver (DEN) 23:40 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:40 Effective 2025-12-19 through 2026-01-04
Lun,Jeu,Ven,Dim 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Effective 2025-11-02 through 2025-11-16
Lun,Ven,Dim 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Effective 2025-11-21 through 2025-11-28
Ven,Dim 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Effective 2025-12-07 through 2025-12-14
Jeu 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2025-12-18
Lun 18:15 Denver (DEN) 23:50 Orlando (MCO)
WN 2525 Non-stop Boeing 737-800 (73H) 3:35 Operates only on 2026-01-05
Lun,Jeu,Ven 19:30 San Diego (SAN) 1 20:55 San Jose (SJC) B
WN 2525 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-06-05 through 2025-07-03
Lun,Jeu,Ven 19:30 San Diego (SAN) 1 20:55 San Jose (SJC) B
WN 2525 Non-stop Boeing 737-700 (73W) 1:25 Effective 2025-07-07 through 2025-08-04
Sam 21:05 San Jose (SJC) B 22:45 Portland (PDX)
WN 2525 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-06-07 through 2025-08-02
Dim 21:15 San Jose (SJC) B 22:55 Portland (PDX)
WN 2525 Non-stop Boeing 737 MAX 8 (7M8) 1:40 Effective 2025-06-08 through 2025-08-03
Lun,Jeu,Ven 21:30 San Jose (SJC) B 23:10 Portland (PDX)
WN 2525 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-06-05 through 2025-07-03
Lun,Jeu,Ven 21:30 San Jose (SJC) B 23:10 Portland (PDX)
WN 2525 Non-stop Boeing 737-700 (73W) 1:40 Effective 2025-07-07 through 2025-08-04
Vols indirects:
Mar,Mer 09:00 Houston Hobby (HOU) 12:25 San Jose (SJC) B
WN 2525 1-stop Boeing 737 MAX 8 (7M8) 5:25 Effective 2025-06-10 through 2025-07-30
Lun-Mer 13:50 San Diego (SAN) 1 23:40 Orlando (MCO)
WN 2525 1-stop Boeing 737-800 (73H) 6:50 Effective 2025-11-25 through 2025-12-01
Lun,Mar,Ven,Dim 13:50 San Diego (SAN) 1 23:40 Orlando (MCO)
WN 2525 1-stop Boeing 737-800 (73H) 6:50 Effective 2025-12-19 through 2026-01-04
Lun,Jeu,Ven 19:30 San Diego (SAN) 1 23:10 Portland (PDX)
WN 2525 1-stop Boeing 737-700 (73W) 3:40 Effective 2025-06-05 through 2025-07-03
Lun,Jeu,Ven 19:30 San Diego (SAN) 1 23:10 Portland (PDX)
WN 2525 1-stop Boeing 737-700 (73W) 3:40 Effective 2025-07-07 through 2025-08-04
This flight number is listed as serving the following routes:
Southwest Airlines vol WN 2525: Multiple routes
Sélectionnez la date du vol:
HORAIRES DES VOLS
Vols directs:

Southwest Airlines WN2525
Operates only on 2025-11-27
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 1:20, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Valid until 2025-05-31
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 4:10, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-05-04 through 2025-05-18
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Operates only on 2025-06-01
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:10, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Valid until 2025-06-02
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 4:05, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-06-10 through 2025-07-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:15, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-06-10 through 2025-07-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-11-22 through 2025-11-29
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-12-20 through 2026-01-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 2:25, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-11-25 through 2025-12-01
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-19 through 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 2:25, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-10-05 through 2025-10-26
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 2:35, non-stop
Boeing 737-700 (Scimitar Winglets)

Southwest Airlines WN2525
Valid until 2025-06-04
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 4:10, non-stop
Boeing 737 MAX 8 (7M8)
The flight arrives 1 day after departure.

Southwest Airlines WN2525
Operates only on 2025-05-25
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 4:10, non-stop
Boeing 737-800 (73H)
The flight arrives 1 day after departure.

Southwest Airlines WN2525
Effective 2025-11-25 through 2025-12-01
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-19 through 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:40, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-11-02 through 2025-11-16
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-11-21 through 2025-11-28
Lun
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-07 through 2025-12-14
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Operates only on 2025-12-18
Lun
-
Mar
-
Mer
-
Jeu
Ven
-
Sam
-
Dim
-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Operates only on 2026-01-05
Lun
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 3:35, non-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-06-05 through 2025-07-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-07-07 through 2025-08-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:25, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-06-07 through 2025-08-02
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-06-08 through 2025-08-03
Lun
-
Mar
-
Mer
-
Jeu
-
Ven
-
Sam
-
Dim
Duration: 1:40, non-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-06-05 through 2025-07-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-07-07 through 2025-08-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 1:40, non-stop
Boeing 737-700 (73W)

Vols indirects:

Southwest Airlines WN2525
Effective 2025-06-10 through 2025-07-30
Lun
-
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 5:25, 1-stop
Boeing 737 MAX 8 (7M8)

Southwest Airlines WN2525
Effective 2025-11-25 through 2025-12-01
Lun
Mar
Mer
Jeu
-
Ven
-
Sam
-
Dim
-
Duration: 6:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-12-19 through 2026-01-04
Lun
Mar
Mer
-
Jeu
-
Ven
Sam
-
Dim
Duration: 6:50, 1-stop
Boeing 737-800 (73H)

Southwest Airlines WN2525
Effective 2025-06-05 through 2025-07-03
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:40, 1-stop
Boeing 737-700 (73W)

Southwest Airlines WN2525
Effective 2025-07-07 through 2025-08-04
Lun
Mar
-
Mer
-
Jeu
Ven
Sam
-
Dim
-
Duration: 3:40, 1-stop
Boeing 737-700 (73W)
This flight number is listed as serving the following routes:
  • Denver (DEN) - Orlando (MCO)
  • Houston Hobby (HOU) - San Diego (SAN)
  • Houston Hobby (HOU) - San Jose (SJC)
  • Jacksonville (JAX) - Love Field, Dallas (DAL)
  • Las Vegas Harry Reid (LAS) - Pittsburgh (PIT)
  • Pittsburgh (PIT) - Baltimore (BWI)
  • San Diego (SAN) - Denver (DEN)
  • San Diego (SAN) - Orlando (MCO)
  • San Diego (SAN) - Portland (PDX)
  • San Diego (SAN) - San Jose (SJC)
  • San Jose (SJC) - Portland (PDX)